Asia Geospatial Forum, Hanoi 18 September 2012 Vikram Singh, Delhi Jal Board, India Kapil Chaudhery, Spatial Decisions, India Kazufumi Momose, Tokyo Engineering.

Slides:



Advertisements
Similar presentations
Use GIS-T to Synchronize Land and Infrastructure Development Principle Investigator: Yingling Fan Humphrey Institute of Public Affairs Co-Investigator:
Advertisements

Facilities Capital Planning and Management A program management overview prepared for Ferndale School Districts Facilities Planning Committee.
1 GIS for Water Maximizing the Benefits of GIS Susan Ancel - Director Water Distribution and Transmission EPCOR Water Services Inc. Geospatial World Forum.
A Path breaking Technology for Network Maintenance and Optimization
Free software costs money
THE DEVELOPMENT OF LABUAN WATER-SUPPLY GIS (LWS GIS)
The Benefits of Modeling with Bentley’s Haestad Methods Solutions.
Role of Geospatial Technologies in Roads and Highways 08 th February, th February, 2012 Atul Kumar Chief General Manager, NHAI Atul Kumar Chief.
GCR’s Restoration of Service Application (ROSA) consolidates reports from multiple outage utility companies and geographical areas into a consolidated.
Spatial Decisions INNOVATING GEOSPATIAL INTELLIGENCE PLENARY II 17 September GIS Asia. Hanoi Kapil Chaudhery Spatial Decisions.
Continuous Value Enhancement Process
IBM Smarter Cities Challenge City of Tucson Award Recipient for 2013 November 14, 2012.
ASIA GEOSPATIAL FORUM. HANOI. 19 SEPTEMBER 2012 Sarah Remmei
IPN – Israel Water Week Improving the Water Service: The Case for Replicating Manila in Mexico Gerardo Angeles Castro Economic Development Network - IPN.
1 World Bank Land Market Assessment Training – February 28 th Part 1 – spatial tools to analyze the impact of land markets on affordability and urban spatial.
About Presentation About Rand Water Rand Water and MDGs Economic Policy and Implications Rand Water and its Role in Africa Conclusion.
Sharing Water, Sharing Practices
Chapter 14 Contemporary cost management. Cost management §Improvement of an organisation’s cost effectiveness through understanding and managing the real.
Needs Assessment April 5 th 2006 Geog 463: GIS Workshop.
… putting the precision in ...
CE HYDRAULICS ENGINEERING
Tom Singleton Associate VP, Director, Integrated Water Resources an Atkins company Linking TMDLs & Environmental Restoration.
1 Investor 27 Oct Overview i2O offers a solution to huge problem of water leakage Managed service with recurring revenue Seeking £4m to reach.
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
Complex Network Analysis of the Washoe County Water Distribution System Presentation By: Eric Klukovich Date: 11/13/2014.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
The Utilization of GIS Technology at Northeastern REMC Presented By: Steven Weber, GISP Northeastern REMC (260)
GIS / Hydraulic Model Integration 2008 ESRI UC Will Allender, GISP Planning and Engineering Asset Systems Planning August 6, 2008.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Copyright 2010, The World Bank Group. All Rights Reserved. COVERAGE, FRAMES & GIS, Part 2 Quality assurance for census 1.
An-Najah National University Civil Engineering Department Analysis of the Water Distribution Network of howara- Nablus Submitted by: Rami Ahmad Mohammed.
Needs Assessment Geog 469 GIS Workshop. Outline What is the rationale behind needs assessment? What are the benefits of GIS projects? What is a hierarchical.
Census Mapping A Case of Zambia UN Workshop on Census Cartography and Management, Lusaka, 8-12 th October 2007.
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
Secondary & Cumulative Effects Analysis Training Program Maryland State Highway Administration’s Secondary and Cumulative Effects Analysis Guidelines For.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
1 Water Services Training Group 19 th Annual Conference Optimising Services Delivery in the Water Industry Radisson Blu Hotel Sligo, 3 rd. September 2015.
Basic law of energy policy in Japan toward to the development of CES Takao KASHIWAGI Professor, Ph. D, Graduate school of Bio-Applications and Systems.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
By Vinod Kumar IAS Commissioner, Land Records & Settlement, Madhya Pradesh December 15-17, 2009, New Delhi Preparation of Digital Land Parcel Map.
Water Conservation and Water Demand Management Progress with the Strategy Implementation 16 September 2010.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
AN – Najah National University
Demonstration Project in Waste Water Treatment Delhi Jal Board, India Is Water Business Export Business? DHI, 14 October 2011 Peter Sand.
The Smart Network: NRW, Pressure and Asset Management
Implementing an Adaptive Capital Improvement Program
Borrego Water District Revenue Workshop. Potential Revenue Sources  Background  Service Area Relatively Small  Largely Undeveloped  Absentee Owners.
Presentation to the UN Experts Group Meeting UNSD 29 May - 1 June 2007 Alister Nairn Director - Geography Section GIS BASED CENSUS MAPPING APPROACHES -
Estates across STFC This presentation is to give PPD the opportunity to respond to proposals for the future management of Estates across STFC The proposals.
Southern California Water Dialogue September 23, 2015.
London 2062 Symposium London’s Energy Future Peter North 19 th March 2012.
PILOT PROJECT ON NRW IN SHEETAL PARK AREA OF RAJKOT CITY IN GUJARAT Danish Water Forum AND Rajkot Municipal Corporation.
Theme : Information, monitoring & research NWRS Workshops October - December
Asset Degradation Modelling at Townsville Water
Financial and Operational Performance Improvement Programe (FOPIP) Danube Water Conference 2017, Vienna, May 18 Training session on Local governments’
4/14/2018.
IOT – Firefighting Example
Ensuring Value for Money Asset Management Project at American Samoa Power Authority By William Spitzenberg (ASPA) and Richard Taylor (Thomas Civil.
Chairman of the Board and CEO,
Make-to-Stock Scenario Overview
Overview of the CoJ Water & Sanitation Master Plan
Make-to-Stock Scenario Overview
An-Najah National University Faculty Of Engineering
DOE Nuclear Safety Research and Development Program
Model of block distribution system (Fukuoka City Waterworks Bureau)
Experiences with On-Board Mass Monitoring in Australia Gavin Hill General Manager, Strategic Development Transport Certification Australia.
Energy performance and Carbon emissions Assessment and Monitoring tool
Analysis of the Water Distribution Network of
City of Sunrise Wastewater Reuse Program
WATER & WASTEWATER PUNJAB, PAKISTAN
Presentation transcript:

Asia Geospatial Forum, Hanoi 18 September 2012 Vikram Singh, Delhi Jal Board, India Kapil Chaudhery, Spatial Decisions, India Kazufumi Momose, Tokyo Engineering Consultants, Japan

Overview Water supply systems are typically developed incrementally over the decades and combine assets that have been integrated into the overall system at different points in time, in response to changing demand and urban growth patterns. The rapidly growing city of New Delhi covers an area of almost 1600 sq.km, with a distribution network of over 10,000 km of pipeline, with a current population of approximately 16 million and a projected service population of 23 million people projected for the year Tuesday, May 12, 20152

The challenges of a developing a water supply master plan for such a large area and high population load: spread across 22 management zones, a logistical challenge compounded by the fact that city government administrative zones are different from water supply zones That administrative decisions impact population density and land use, which has a direct impact on the water supply system planning That these changes continue to pose a logistical challenge in developing a comprehensive master plan while responding to short term and localized problems Cont. …

Role of GIS GIS provides the seamless base and interface upon which to establish immediate short term actions yet link them with long term master plan activities At a master plan development level, GIS facilitates: Evaluation of multiple scenarios of water supply load estimation based on the land use and urban governance. Examines options in the face of limited fresh water availability Evaluates impact of policy decisions like 24x7 water supply Helps optimize a supply and distribution network based on current available assets, their operative condition, and anticipate new assets required of appropriate design at optimal locations

The GIS Environment Delhi Jal Board has a dedicated GIS/ Mapping centre The entire database is maintained on a dedicated server using ArcGIS from ESRI as the GIS engine and Oracle as the relational database This establishes a foundation for geospatial information management on its entire water collection, treatment, and supply systems Recent QuickBird and CartoSAT imagery serve to establish a more updated geo-referenced base upon which to position the asset inventory WaterGEMS was introduced into the basic GIS infrastructure to support the hydraulic modeling and system design for the master plan

Example of Network Mapping on Imagery Base

Use of CartoSAT-2 Satellite Imagery Tuesday, May 12, 20157

Developing the Master Plan: Baseline The water supply master plan starts with the following known information: Land Use and Development Master Plan 2021 from the City Urban Development Department Information on existing network and capacities available in the DJB GIS Center Established government policies on water supply standards and norms Fresh water availability scenarios indicate limited capacities

Developing the Master Plan: Challenges The peculiar challenges of this master plan development are: The network mappings needs to be verified and updated. About 10,000 km of network spread over 1,600 sq.km! An urban development master plan for the year 2012 is the foundation but is at variance from ground reality of land use activities There is a massive, yet undocumented, unverifiable amount of leakage of treated water in the supply network And this does not cover the non-revenue water, i.e. water that is supplied but for which revenue is not collected Variability in supply results in some people being flooded with water and some getting no water Tuesday, May 12, 20159

Objectives of Master Plan The objectives of the Water Master Plan is clear; to prepare well in advance optimal water supply facilities to meet water demand. The target year is set as year 2021 same as the target year of the Master Plan Delhi 2021 (MPD2021). Its objectives are specifically identified and agreed with DJB as shown in below table. 10

Converting Land Use into Water Demand The urban development plan provides for designated land use types The urban planning development norms provide indicative values of water supply demand by land use activity Any changes in land use will impact water demand by geography

The Water Demand by Land Use Using the land use plans for each administrative zones, the water demand is established by its geospatial distribution

Demand Estimation for year 2021 DDA Population 23 Million Official Million Sum of Zone Population Total Demand1200 MGD1489 MGD Per Capita Demand Domestic153 LPCD176 LPCD Non Domestic83 LPCD96 LPCD Total236 LPCD / 52 GPCD273 LPCD / 60 GPCD Adjustment for Un-Authorized Area DDA Land use (MGD) DDA + Un Authorized Area (MGD) DDA Land use (MGD) DDA + Un- Authorized Area (MGD) Demand For Delhi Planning forMaximum Resources Transmission Facilities Distribution Facilities

Fresh Water Availability With the limited availability, Delhi is staring at a serious resource constraint To meet this, we will have to turn towards resource conservation and waste water recycling. Source Quantity (MGD) Existing WTPs715 Ranney / Tube Wells100 Recycling Plants 30 Dwarka & Okhla WTPs (CLC savings) 80 Renuka Dam(may not be available in near future) 275 Resource Available(With Renuka Dam) 1,200 Resource Available(Without Renuka Dam) 925 Future Demand 1,380

Analyzing the Water Supply System using GIS From a master plan modeling perspective, we critically require information on the network: Transmission mains Secondary Mains Distribution Lines And linked to the network we need information on the supply capacity of the treatment plants and the under ground reservoirs (UGRs) which serve as localized distribution requirements A critical step then becomes to assess the existing UGR distribution and their capacity

Water Gems used for modeling. Water Gems and Arc GIS Used for Pipeline Network Modeling. After modeling Proposals can be made Replacement Repair More Demand Area Efficient Network Data. Capacity and Serving capacity of an UGR. Pipe line Network Monitoring. Timely Updating. Using GIS to Develop the Water Supply Master plan Development of GIS Data Management of Assets. Pipe Line Network. Transmission mains Distribution Lines. Valves, Booster Pumps Tube Wels UGR’s WTP’s Management of Attribute Data and timely updating the data is a biggest challenge.

Development of Network Data 17 The GIS system is capable of displaying any water supply facilities on the map. The entire network along with the condition assessment data based on extensive field work is archived into the GIS database Its locational accuracy and its corrected attribute data are critical data for the modeling and system planning process.

Layout of Existing Distribution Pipeline Length of existing distribution pipelines is approximately 7,000 km spreading across 22 water supply zones in Delhi. Distribution System

GIS-based Network Model From WTP to UGR

GIS-based Network model from UGR to DMA’s Allocation with DMAs in Non-revenue Water Study, and with Control Valves Flow meters and Pressure Meters in SCADA Study

Attribute data management and updation Pipe Line Attributes Pipe Lines Pipe Line Distribution Network

Optimizing UGR zones using GIS DJB currently operates with 125 UGR command zones. Each UGR is examined to assess Capacity-Demand mis-match Availability of space to enhance UGR if necessary Reduction in service area of existing UGRs and adding new UGRs This iterative process requires an optimization at a sub-city supply- watershed level, based on existing and planned enhancements to treatment capacities Added complexity is the hydraulic variability across the city terrain and the need to optimize location of treatment facilities and pumping stations to achieve this

District Metered Areas (DMAs) 1,011 District Metered Area (DMAs) across the city need to be optimized, using GIS

Using GIS for Optimization Analysis Working interactively between the GIS database and the thought process of water supply engineers, fits the GIS-enabled tool, WaterGEMS from Bentley. This product, albeit expensive, with the appropriate training, provides us with the capacity to interactively analyze and plan the entire city level system, although in reality addressing it in smaller subsets. 24

Multiple Roles for WaterGEMS

Use of Water GEMS for Modeling

Arc GIS and Water-GEMS Integration

28 Case Study of UGR Command Area Planning D-09 JAL VIHAR Study-3:MP/FS Sonia Vihar WTP Jal Vihar

29 Existing Condition The existing situation at Jal Vihar Study-3:MP/FS

30 Hydraulic Analysis- Result of Existing Condition Hydraulic Analysis of the existing condition Negative pressures can be clearly seen Pump Specifications Capacity - 59 MGD Head - 43 Meters Distribution Mains Length – Kms Study-3:MP/FS

31 Planning of DMA The UGR Command zone was further divided into District Metered Areas (DMA’s) They were assigned Unique ID’s Study-3:MP/FS

32 The distribution mains were planned to reach all the DMA’s Inlet points to feed the DMA’s were planned New Mains were proposed a. Insufficient Pipes b. Pipes not available c. To maintain Connectivity Planning of Distribution Main Study-3:MP/FS

33 Planning of Distribution Pipe The distribution pipes are added to the scenario Pipes crossing over DMA’s were isolated DMA were fed through the predefined Inlet Points New Pipes were planned a. Insufficient Pipes b. Ensure Connectivity Study-3:MP/FS

34 Hydraulic Analysis Result of Proposed Condition Hydraulic Analysis of the JICA Proposed condition No Negative pressures can be seen Pump Specifications Capacity- 36 MGD Head- 43 Meters Distribution Mains Length – 9.5 Kms Study-3:MP/FS

35 Flow Control by SCADA +28m +32m +29m +28m +27m +22m +31m +24m +31m +22m Study-3:MP/FS SCADA is used for water flow monitoring and control.

After Modeling Proposals can be Made New WTP Command areas Replacement of Old Pipes Efficient Network Data Recent updates can be done using GIS Tuesday, May 12,

Proposal of New Pipe Lines

Proposed Transmission System (1200 MGD)

Conclusion A land use and water demand based approach is applied to prepare a Master Plan for Delhi Water Supply by linking land use and water supply data using ArcGIS and WaterGEMS softwares. The conclusions are: 1. GIS is becoming the universal backbone in most information systems managing data for water resource and water supply system, the integration and ability to retrieve and (re) use information between GIS and asset management system. 2. Compared to the traditional population based approach, the land use based approach can more accurately capture trends for future development, which can mitigate uncertainties from different population growth models. 3. The land use based approach by linking land use patterns with water demand data can provide more accurate projections of demand curves for public water supply as compared to the traditional approach of extrapolating population growth curves multiplied by assumed per capita consumption.

End Notes …….. This comprehensive, GIS-based water supply master planning process required a significant effort and investment to develop. To derive continued benefits from this and to support other potential activities for DJB, this system must be maintained and kept updated. This activity is of fundamental importance, especially as DJB moves towards preparing detailed implementation plans for selected areas within the context of the master plan.

41 Thank you

Thank you for your attention!