FTA Drug and Alcohol Program NATIONAL CONFERENCE You’re Being Audited by FTA - What Should You Expect? Lori DeCoste & Ed VanderPloeg.

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

1. Set expectations and measure performance ◦ What employees are expected to do for their organization in return for pay and benefits ◦ Allows employees.
Drug and Alcohol Program Regulatory Updates Transportation Disadvantaged Annual Conference August 2009.
Drug-Free Workplace Policy. The university supports and maintains a drug-free working and living environment to provide for the health and safety of students,
U.S. Department of Veterans Affairs Veterans Health Administration Supportive Services for Veteran Families (SSVF) Program SSVF Grantee Uniform Monitoring.
OVERVIEW OF ClASS METHODS and ACTIVITIES. Session Objectives By the end of the session, participants will be able to: Describe ClASS team composition.
Sandra D. Sullivan, M.Ed., LADC1, CEAP Massachusetts Bay Transportation Authority Assistant Director Occupational Health Services Substance Abuse Professional.
The DOT-Qualified Substance Abuse Professional (SAP) Roles and Responsibilities Scott J. Watson, MA, LCAC, SAP, BRI Heartland Intervention, LLC Indianapolis,
DRUG/ALCOHOL TESTING AND THE COMMERCIAL DRIVER 12010–11 Driver Trainer Inservice.
AUDITS Process and Corrective Actions OIG RolesGAO ROLES – OIG –OIG Lead Auditor –OCFO – owner of MATS and Agency Audit Process –OEI AA – Designated OEI.
FTA Post-Accident Testing Testing Thresholds, Decision-Making Procedures, and Regulatory Requirements Ed VanderPloeg and Jack Mastrangelo FTA Drug.
Drug and Alcohol Program Management ~Spring Training ~ March 8 th 2007.
Drug and Alcohol Program Management Presented May 9, 2007 By Diana Byrnes; CUTR.
Notice of Compliance Audit
UNDERSTANDING, PLANNING AND PREPARING FOR THE SCHOOL-WIDE EVALUATION TOOL (SET)
FPSC Safety, LLC ISO AUDIT.
ASPEC Internal Auditor Training Version
Title What to Expect in an Audit and How to Prepare for It Part 40 Workshop Denver, Co May 13 th and 14 th 2014 By Esther Avalos, Director of Compliance.
1 Plumbing Industry Drug-Free Alliance ScreenSafe, Inc. Program Administrators.
E-rate Audits/Reviews Be prepared!! Prepared by Judy Jones, State Library of Iowa.
1 Drug-Free Partnership ScreenSafe, Inc
U.S. Department of Homeland Security United States Coast Guard USCG Drug & Alcohol Program Compliance Requirements.
Challenges and Solutions.  In it was believed Employers would manage all aspects of testing in-house  Contract directly with a laboratory.
Auditing an EMS for Conformance with EO 13423
SESSION ONE PERFORMANCE MANAGEMENT & APPRAISALS.
The FTA Drug & Alcohol Audit Process George Y. Gilpatrick Jr. & John B. Morrison Senior Auditors.
MANAGING A DRUG & ALCOHOL PROGRAM FOR SMALL TRANSIT PROPERTIES.
Or What Does Fraud Look Like?  A set of circumstances that are unusual in nature or vary from the “normal activity”
FTA Drug and Alcohol Program NATIONAL CONFERENCE MPOs/City Government: Who Does What? Atlanta, GA 2015.
Erica Cummings Grant Coordinator 1.  The New Mexico Department of Homeland Security and Emergency Management (DHSEM) is responsible for:  Monitoring.
How To Prepare For A CIP Audit Scott Barker CISSP, CISA CIP Compliance Workshop Baltimore, MD August 19-20, 2009.
Monitoring & Oversight Adult Education and Literacy (AEL) Programs Brenda B. Williams Project Manager Texas Workforce Commission Regulatory Integrity Division.
Setting up an Internal Audit Program By
ISO 9001: 2000 Certified Audit Process What to do.
Michelle Groy Johnson Quality Improvement Officer Research Integrity Office Tough Love: Understanding the Purpose and Processes of Quality Assurance.
Alcohol & drugs Driver. Name of person who will answer driver questions about the materials Drivers subject to Part 382 1a Information drivers must receive.
INTRODUCTION TO AUDITING
State Program Review Process Presented by GSFC Compliance Team.
Best Practices Rod Sams. B.A.S.E System Former DER.
MACO JPIA Risk Management Service Follow up Training for Drug and Alcohol Reasonable Suspicion Training Puiggari & Associates Michele Puiggari Fall 2012.
Monitoring and Evaluating SES Provider Programs
OIG’S Audit Process Diane Kozinski Auditor. 2 MISSION STATEMENT OF OIG To serve the American Worker and Taxpayer by conducting audits, investigations,
March 14, 2007 Spring 2007 New York Rural Transit Conference Drug and Alcohol Program Overview Presented by: Beverly Krieger, CSAPA Precision Compliance,
HOW TO DEVELOP YOUR FTA DRUG & ALCOHOL POLICY Presented by: Leila Procopio-Makuh, C-SAPA.
Learning Objectives Conducting an On-Site Monitoring Review FPO calls the Grantee: “As you know, we’re a little more than nine months into your 24 month.
FTA D&A Audits: Tales from the Field and Experience of Your Peers Jack Mastrangelo, Senior Auditor John Spelman, Audit Team Leader FTA Drug & Alcohol Conference.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
Ed VanderPloeg Lori DeCoste Atlanta, GA  Session topics/format ◦ Functions and required elements of the policy ◦ Mechanics of developing a policy.
COMMUNITY VISITOR TRAINING Quality Lifestyle Support Enhancing the Lives of Individuals.
Supervisor Training On-Campus Student Employment.
DAPM Scenarios {Craig McNulty} 2014 FTA Drug & Alcohol National Conference Little Rock, AR.
1 Creating An Industry Drug-Free Program ScreenSafe Inc. Program Administrators.
1 Creating An Industry Drug-Free Program ScreenSafe Inc. Program Administrators.
Certified Evaluation Orientation August 19, 2011.
HOW TO WRITE A COMPLIANT ANTI-DRUG AND ALCOHOL MISUSE POLICY Ed VanderPloeg FTA Auditor - Cahill Swift, LLC April 16-17, 2014.
Child Support Director’s Association 2007 Training Conference Administrative Audits Presentation #107 September 18, 2007.
The DOT-Qualified Substance Abuse Professional (SAP) William “Reggie” Smith, MPA, CEAP, SAP.
How to Save Money Michael Redington US DOT/Volpe Center.
Essentials for Safety-Sensitive Employee Onboarding Phyllis Walker (MARTA) & Joe Lofgren (Cahill Swift) FTA Drug & Alcohol Program National Conference.
CONTRACTOR OVERSIGHT STAYING EFFICIENT AND EFFECTIVE FTA NATIONAL CONFERENCE - SACRAMENTO 2016.
Adult Day Care Chapter 605 Survey Process OSDH. Introduction  Adult Day Care Facilities/Centers are required to be in compliance with laws established.
March 23, SPECIAL EDUCATION ACCOUNTABILITY REVIEWS.
Department of Child Support Services OFFICE OF AUDITS AND COMPLIANCE.
The FTA Drug & Alcohol Audit Process George Gilpatrick & Michael Redington.
Preparing for Title IIA Monitoring Review (FY15) November 9, 2015 Deborah Walker Meagan Steiner David LeBlanc.
New Employee Orientation
Pre-Investigational New Drug (pre-IND) Meeting with FDA
HOW TO WRITE A COMPLIANT ANTI-DRUG AND ALCOHOL MISUSE POLICY
Introduction to Internal Audits
Setting up an Internal Audit Program
Presentation transcript:

FTA Drug and Alcohol Program NATIONAL CONFERENCE You’re Being Audited by FTA - What Should You Expect? Lori DeCoste & Ed VanderPloeg

Session Goals Discuss the FTA audit process, from initial notification through issuance of the compliance letter Give grantees a better understanding of what to expect when they get "The Call"

Background FTA audits approximately 45 grantees and states each year  An audit team is in the field 24 weeks out of each year  Rotating cast of auditors, Audit Team Leaders, and federal representatives  Selection for audits based on several criteria – not just “red flags” Process is largely identical no matter who we audit, who is on the audit team, or who is leading the audit Grantees with multiple contractors and State DOTs are scheduled somewhat differently, but what we look for is the same everywhere

Background FTA views the audit primarily as:  An opportunity to assess selected grantees’ level of compliance  A chance to offer specific guidance on potential corrective actions  An effective way to enhance public safety However, it is also a non-confrontational learning experience to help develop your best possible D&A program (please believe us!) FTA, grantees, contractors, and vendors have the same goal: protect public safety through compliant D&A programs

Phases of the Audit Process There are three distinct phases to the audit process: 1.Notification/Pre-Audit 2.Site Visit 3.Post-Audit/Compliance We will discuss each phase in turn

Pre-Audit Seven (7) weeks prior to the scheduled audit, the DAPM of the selected grantee will get a phone call from the Audit Team Leader  Notification that they have been selected for an audit  Selected dates are firm once agreed upon  Basic overview of audit process and information needs  Overview of schedule/deadlines for the next seven weeks  Identification of contractors/sub-recipients (as applicable)  Try to put the DAPM at ease – although this rarely works!

Pre-Audit Within a few days of initial conversation, Team Leader issues formal notification letter via (sometimes the same day) Letter includes a draft agenda for the audit and list of information required from the DAPM (both pre-audit and during audit) After DAPM has had a day or two to absorb the letter, Team Leader makes follow-up phone call to answer any questions

Pre-Audit As soon as possible after notification, DAPM will:  Notify key individuals within the organization of the audit  Notify contractors and vendors of the audit  Share notification letter as needed  Begin gathering the pre-audit information package (due 3 weeks from initial call) Careful preparation at this stage helps ensure a smooth onsite experience

Three (3) weeks after the call, the following materials are due to Team Leader and FTA – from grantee and contractor(s), as applicable 1.Current Substance Abuse Policy 2.Encrypted/protected spreadsheets with previous twelve (12) months of testing data (pre-employment, random, post-accident) 3.Lists of employees (if any) tested for reasonable suspicion, return-to-duty, follow-up 4.Contact information for MRO and SAP 5.Completed schedule with addresses and contact information for grantee, contractors, collection site 6.Other materials specifically identified in notification letter Pre-Audit

After receiving the pre-audit package at the three (3) week point, the Team Leader completes several tasks during Weeks Determines whether the package is complete; obtains any missing pieces 2.Reviews policy for compliance; writes up any deficiencies  Typical findings: Missing elements, list of refusals incomplete, incomplete/incorrect descriptions of DOT/FTA requirements 3.Analyzes testing data and enters into auditing software (“SAMO”) Pre-Audit

Team Leader tasks during Weeks 4-6 (cont.) 4.Determines whether SAP and MRO have been interviewed recently. If not, DAPM will schedule dates/times for phone interviews by Team Leader  SAP interview: 20+ questions / minutes  MRO interview: 60+ questions / minutes  Usually conducted 1-3 weeks prior to onsite audit  Typical findings: Unaware of certain elements of 49 CFR Part 40 Pre-Audit

During the entire pre-audit phase, Team Leader and DAPM are in frequent phone/ contact  Discuss questions and request/find supplemental information Weeks 4-5 after notification are generally low-effort for the DAPM Pre-Audit

During Week 5 or 6, Team Leader provides DAPM with final audit schedule and lists of records selected for onsite review  DAPM distributes schedule to all interested parties, including contractors/sub-recipients  DAPM needs to “pull” all of the required records from the files prior to the audit team’s arrival  Contractors also need to pull records in advance Pre-Audit

During Week 6, Team Leader speaks with DAPM one last time to ensure s/he is prepared for the audit and that there are no outstanding questions Audit team travels to the relevant location and we move to the onsite phase of the audit Pre-Audit

Site Visit Audit team arrives at the grantee location Entrance interview begins – usually either 9 AM or 1 PM 1.Introductions 2.Overview of audit process/schedule 3.Questions/answers about process 4.Invitation for staff to be present during all phases of the audit (“open process”) including collection site visit and contractor audit (if applicable) Records review begins

Site Visit Records Review – Pre-Employment What we look for: Verified negative test result prior to placement into safety-sensitive (SS) duty No more than 90 days elapse between negative result and first performance of SS duty Previous employer records requests

Site Visit Records Review – Pre-Employment Typical findings: Employees placed in SS duty before a negative result is received No test result at all

Site Visit Records Review – Random What we look for: Unpredictable spread of random testing  Throughout the year  Days of the week  Hours of the day Valid and recorded excusals

Site Visit Records Review – Random Typical findings: Lack of weekend testing Lack of early morning/late night testing Excusals for invalid reasons, or not fully documented

Site Visit Records Review – Post-Accident What we look for: Accident meets FTA criteria Decision-making process documented Time limits: 2hr/8hr/32hr rules

Site Visit Records Review – Post-Accident Typical findings: FTA tests after incidents that do not meet testing criteria FTA tests conducted after employee is clearly discounted as a contributing factor to the accident Delays in alcohol testing not documented Decision not to perform FTA test (after thresholds are met) insufficiently documented

Site Visit Records Review – Reasonable Suspicion What we look for: Determination based on specific, contemporaneous, articulable observations (well-documented) Ordered by trained supervisor (2 hour training) Time limits: 2hr/8hr rule Typical finding: Testing based on observations that do not meet FTA criteria

Site Visit Records Review – Return-to-Duty/Follow-Up What we look for: Written evaluations and follow-up testing plan from SAP that meet Part 40 requirements Negative return-to-duty test prior to returning to SS duty Follow up tests according to the SAP’s testing plan All tests under direct observation Typical finding: Testing does not follow SAP’s testing plan

Site Visit Records Review – Miscellaneous What we look for: Proper completion of CCFs and ATFs at the collection site  Are CCFs/ATFs reviewed for errors and corrected as needed? Records maintained in a secure location Required drug training for all covered employees SAP referral provided to anyone who fails or refuses a DOT test

Site Visit Records Management Interview Less of a formal “interview” than a reporting of what was observed during records review Sometimes supplemental records may be requested:  Employee/supervisor training records  Random testing selection lists  Forms used to document various aspects of the program  Documentation of policy receipt by employees Typical findings: Missing records Inadequate/non-compliant forms

Site Visit DAPM Interview Federal representative interviews the DAPM Questions assess DAPM’s knowledge of the regulations and procedures for conducting required D&A testing Sometimes more than one person is interviewed (i.e., assistant/backup) 80+ questions / roughly 1 hour Typical findings: DAPM unaware of certain regulatory requirements No vendor/contractor oversight

Site Visit Collection Site Visit Part of the team splits off to visit the primary collection site  DAPM sometimes attends to witness how we audit the collection site Mock drug and alcohol test – one auditor is the “donor” while another observes BAT/collector Follow-up questions assess BAT/collector knowledge of the regulations and procedures for dealing with unusual circumstances  BAT: 60+ questions / roughly ½ hour  Collector: 80+ questions / roughly 1 hour Review calibration records, training certificates, QAP

Site Visit Urine Collector:  Steps completed out of order  Unaware of how to deal with non- routine collections (i.e., employee is uncooperative)  Inadequate shy bladder procedures BAT:  Failure to conduct alcohol test first  Unaware of BAC that is considered a violation  Unaware of issues that result in cancelled test Collection Site Visit Typical findings:

Site Visit Wrap-Up/Debriefing When all interviews and record reviews are completed the auditors provide a verbal debriefing of any deficiencies and the required corrective action  Our goal: “No surprises” in the audit report  Chance to discuss issues further if desired Depart for day – write report in hotel If no contractors, final audit report generally delivered the next morning

Site Visit Contractor Site Visits If there are contractors to be audited, auditors visit them the following day(s) and follow the same audit process outlined above  Grantee is fully responsible for compliance of its contractors  Grantee should not assume contractors have full knowledge of the requirements or that their policies/programs are compliant  DAPM often attends contractor site visits Final audit report typically delivered to grantee the morning after the final contractor audit

Site Visit Exit Interview Presentation of final audit report Exceptions report – only lists deficiencies that require action Discuss format of the report and some highlights – not every finding Describe the response process  Formal response due 90 days after exit interview  Audit response software – only grantee uses (i.e., not contractors or vendors)  Back-up documentation required as noted in report Answer questions Duration: anywhere from 15 minutes to 1 hour Audit team departs

Post-Audit Audit Response Policy modified (as applicable), provided to Team Leader for review prior to 90-day deadline  Once “blessed” by Team Leader, policy may be approved/distributed to employees Testing procedures modified as needed, and documentation provided Forms and documents developed/modified as needed and copies provided Statements of regulatory understanding written and provided Contractor and vendor (i.e., collection site, SAP/MRO) responses coordinated by grantee DAPM All responses entered into response software; file provided to Team Leader DAPM has access to Team Leader throughout response period

Post-Audit Review of Audit Response Response received by Team Leader no more than 90 days after the date of the final audit report Reviewed by Team Leader for completeness and adequacy If incomplete or inadequate, further action required  “Minor” or “quick” fixes – grantee may be provided a limited amount of time to provide a supplemental response (e.g., forgotten items/documentation)  More serious issues will result in a formal Continuing Concerns Report and another defined response period (e.g., 45 days, 60 days) depending on the nature of the issues If all responses are complete/adequate, Team Leader issues compliance letter Compliance letter formally closes out the audit – you’re done at last!

Ongoing Support FTA is a resource to which DAPMs have ongoing access Do not hesitate to contact with questions as they arise  Are these proposed policy changes compliant?  Is this an acceptable spread for random testing?  I am conducting training – are these materials adequate? FTA Drug and Alcohol Program Hotline: (617) or

Questions? Ed and Lori are available to answer your questions after this session – please come say hello!

FTA Drug and Alcohol Program NATIONAL CONFERENCE THANK YOU Atlanta, GA 2015