General Activities Stuartt Corder April 9, 20141ASAC telecon.

Slides:



Advertisements
Similar presentations
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Advertisements

PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
CSV Plan status Robert Laing ESO Science IPT. 2 Recent changes Complete rewrite to take account of rebaselining and revised delivery schedule Proposal.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Release & Deployment ITIL Version 3
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
MRC VIEWABLE IMPRESSION RECONCILIATION PROCESS: PHASE 3 RESULTS AND MOVING FORWARD Presented to IAB 3MS Educational Forum July 8, 2015.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
Magellan f/5 Planning and Status Andrew Szentgyorgyi Magellan SAC Meeting Pasadena/17 Mar 2012.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
ALMA Integrated Computing Team Coordination & Planning Meeting #3 Socorro, June 2014 New AM organization and improving the acceptance procedure Masao.
Software System Engineering: A tutorial
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
1 ANASAC Meeting – May 20, 2015 ALMA Pipeline Brian Glendenning (for Jeff Kern)
1 © Quality House QUALITY HOUSE The best testing partner in Bulgaria.
A Scheduling Algorithm with Dynamic Priorities Status Presentation Matias Mora Klein UTFSM Computer Systems Research.
Cycle-3 Capabilities and the OT Andy Biggs ALMA Regional Centre, ESO.
® © 2009 Open Geospatial Consortium, Inc. Starting an Interoperability Experiment David Arctur, OGC Director, Interoperability Programs December 8, 2009.
ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 Control Group Planning Rafael Hiriart, Control Group Lead.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) LOFAR Operations and Schedule.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
1 ANASAC Meeting – May 20, 2015 P. Jewell, J. Hibbard, C. Lonsdale Cycle 1 & 2 Status & Cycle 3 results.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.
Software Phase V Testing and Improvements to Test Procedures S. Corder and L.-A. Nyman April 18, 20131ICT Planning Meeting, Santiago.
DVP Testing Neil Roddis Apr 15, SPDO Why is test and verification so important for SKA dishes? Capital cost: design for low cost of a few thousand.
Observing Modes from a Software viewpoint Robert Lucas and Philippe Salomé (SSR)
Introducing Project Management Update December 2011.
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 Telescope Calibration Planning Dominique Broguiere.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Data Processing Progress.
The ALMA Phasing Project (APP) APP is an ongoing ALMA Development Project (approved in 2012) to provide the hardware and software necessary to coherently.
ES Slowdown, Optimization, Testing. Plan for shutdown: Timeline April: Focus on resolution of major outstanding issues: – Bulk data deployment  stable.
Recall The Team Skills 1. Analyzing the Problem (with 5 steps) 2. Understanding User and Stakeholder Needs 3. Defining the System A Use Case Primer Organizing.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 ICT Group planning: Scheduling Jorge Avarias ICT Scheduling.
Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charges For Oct 31 ASAC Report to ALMA Board Al Wootten JAO Interim Project Scientist.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Notes on this template You may reformat this to fit your design, but make sure you cover the information requested in this template. Presentations should.
Advanced User Support in the Swedish National HPC Infrastructure May 13, 2013NeIC Workshop: Center Operations best practices.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
TM 720: Statistical Process Control DMAIC Problem Solving
DUAL POLARIZATION AND ZDR CALIBRATION IMPROVEMENTS 5.2(6)
Key Factors for Clubs in doing both Club and Global Grants
Dinesh Rawat , Software Test Manager
600 MHz – Proposed TV Transition Objectives and Methodology
Management Breakout: MREFC Budget Summary Victor L
Operations Department
VLA to EVLA Transition Plan
EVLA Advisory Committee Meeting
Dynamic Scheduling with the GBT
Software Requirements
A summary of part 1 of Chapter 7 CEP 812 Kay Paff March 24, 1999
Correlator Growth Path
Dynamic Scheduling with the GBT
Presentation transcript:

General Activities Stuartt Corder April 9, 20141ASAC telecon

Operational Update Move to 2 weeks of ES vs 1 week of EOC(extension and optimization of capabilities)/CSV Program scientists for EOC in place in Chile: A. Remijan (Lead), C. Vlahakis (Deputy) 24 hour operations on the weekend of ES weeks currently best efforts* EOC weeks contain 2 days of dedicated “test version” validation for software capabilities >=44 Antennas available in at least some bands since March 12 April 9, 2014ASAC telecon2

Operational Update Special attention being paid to pad readiness: – Priority on Cycle 1+2 extended configuration pads – Next priority given to 12 extended array pads that are needed for long baseline testing (more later) – Then all pads will be accepted, probably on an on demand basis – Weekly meetings held with delivering party to provide updates on progress and schedule April 9, 2014ASAC telecon3

Operational Update Relocation/Configuraitons: – April: 32-4; May: 32-5; June: 34-6; July: 34-7* – Have demonstrated 2 relocations in a day regularly with the same crew – Have demonstrated (recently) 2 relocations and return to science in the same day – Configuration change planning has improved dramatically since last year but we are now using new pads again, so it may become more dynamic again April 9, 2014ASAC telecon4

Operational Update Problem reporting/tracking – Weekly meetings now between hardware savy astronomers and engineering to prioritize and interact regarding tough problems – Plan to have astronomer involvement in twice daily meetings at the site to confirm priority weighting of problems that occur over night Morning to give initial priority after the night Afternoon to update new problems and merge them into the queue – Weekly updates with software to prioritize persistent problems. April 9, 2014ASAC telecon5

Status of Cycle 1 Masao Saito April 9, 20146ASAC telecon

Progress since last ASAC telecon Post the ALMA Status Update document. ES Blocks 27 and 28 (C32-2/3) conducted Cycle 1 ES Data reduction keeps going. New observing block started from Apr 2 – 2 week ES blocks and 1 week EOC block – Saturday and Sunday 24hr run with best efforts – Prior to 24 hr run, performance check (pointing and focus conducted) April 9, 2014ASAC telecon7

Cycle 1 Observation Status Observing blocks 27, 28 (Mar ) successful (3 blocks about one week each in the period). Array Elements reached nominal numbers in the last two blocks (~32 or more for 12-m Array Elements (AEs), ~9 for 7-m Aes), TP mode has not yet passed software acceptance) ACA observations suffered from various issues in the blocks 27 and 28 because of invalid optical signals from antennas or mis-operation of resetting ACA correlator. April 9, 20148ASAC telecon 12-m Array Block Allocated time (h) (nominal values, will be updated) Successful executions (h) # of successful executions Calibrations (h) Downtime (h) Execution efficiency (%) Average number of antennas m Array

Cycle 1 Data Processing Status April 8, 2014 Manual reduction by staff at JAO and the ARCs Project View (in total 197 High Priority Projects in Cycle 1): Number of projects completed: 25 Number of projects partially delivered: 38 Number of projects started: 125 (at least one QA0 pass) Dataset (OUSs or SBs, one or more each per project) view: Datasets started to be observed:64 Datasets finished (fully observed): 258 (passed QA2+being processed+waiting) Datasets passed QA2:153 Datasets delivered:143 Being processed: 74 Waiting for staff data reduction assignment: 31 April 9, 2014ASAC telecon9

Preparation for 24 hr run 24 hr run on Saturday and Sunday. From 9 am to 5 pm, it is the best effort so engineering work on individual antennas and front ends are happening. Prior to Apr 2, performance test run was performed. Band 3 is ok and Band 6 is ok with caution. April 9, 2014ASAC telecon10

Expected completion of Cycle 1 projects on May h to transfer to Cycle 2 including all SBs requiring C32-6. Expected completion rates of each band are ~70 % (B3), ~60 % (B6), ~40 % (B7), ~25 % (B9) Probable better completion rates With antennas, reasonable coverage of two array configurations. Daytime observations covering the whole LST range. April 9, 2014ASAC telecon11

Cycle 2 Readiness Stuartt Corder April 9, ASAC telecon

Software ~3 online problems remain that are critical for acceptance (1 likely solved) Other major items are resolved Acceptance testing scheduled for week of April 22 nd provided progress is made on remaining issues. Acceptance planned for end of May in preparation for June 2 start to Cycle 2 (June 1 is a EOC/CSV day) April 9, 2014ASAC telecon13

Antennas/Receivers Goal of 45 antennas in use each night more or less regularly achieved in some bands Focus now on making the 45 antennas robust and having 45 at all bands Band 4/8 installations are at ~30, i.e. half the array. Schedule to complete all with 4/8/10 by Dec/Jan (4 are added each month on average) April 9, 2014ASAC telecon14

Antenna Stations/Power/Weather Readiness of remaining extended configuration Cycle1/2 stations underway (about 16 remain for Cycle 1, 10 more for Cycle 2) Remote power recovery installed and functional on all stations in inner 3 of 6 configurations for Cycle 1 Project defined and initiated for remote start on all stations Snow plow on site and installed April 9, 2014ASAC telecon15

Cycle 3 Activities Stuartt Corder April 9, ASAC telecon

Recent Activities Focus has continued to be on readiness for software acceptance of the online system Session (recycled calibration) work in final testing phase Calibration stability (amplitude/bandpass) analysis nearly complete Speeding up the calibration of the correlator for the ACA Single dish validation still on going April 9, 2014ASAC telecon17

Current Activities: April/May (start 1 week in 3 available) Close out of single dish validation Pre-tests for high frequency focus: – 90 deg switching (when unblocked) – Differential Gain Calibration (band to band transfer, etc) – Fast focus full validation High precision ephemeris checks Single dish rework planning Observing modes meeting for Cycle 3 next week April 9, 2014ASAC telecon18

Focused Campaigns High Frequency: June-August – Local lead: Takahashi – Detailed plan being prepared, folding in ACR support and missions – Configuration changes in June-August optimized to provide band 10 equipped antennas near the ACA – Goal: Improved approach to observing and calibration at bands 9 and 10 as well as potentially low transparency parts of bands 7 and 8 April 9, 2014ASAC telecon19

Focused Campaigns Single dish rework: – Plan being defined to improve the overall performance of single dish – Fast scanning delivered in November should allow better calibration and single dish continuum observations. – Will include schedule for single dish sideband separation (this will likely compete with the high frequency campaign and may be in conflict, preference is given to interferometric improvements) – Goal: A better single dish approach that utilizes more valid techniques and lessons learned in the previous approach. This will include more optimized observing efficiency. April 9, 2014ASAC telecon20

Focused Campaigns Long Baselines: September-November – Local lead: Fomalont – Experts from the executives are being invited to participate for specific areas (based on expertise or previous contributions) – Plan for configuration and timing done – Plan for detailed breakdown of tasks to be discussed in late May. – SV proposed sources not yet available (coming soon0 – Station readiness is being tracked in weekly meetings – Goal: Statements about the long baseline performance, weather requirements, and calibration needs. Should conclude with a set of requirements of restrictions for the Cycle 3 call for proposals (bands, lengths, etc) and a general calibration approach (fast switching, etc) April 9, 2014ASAC telecon21

Focused Campaigns ALMA Phasing Project: – Local Lead: Not yet identified – Test time being discussed for software side tests. – Time agreement made with APP pending hardware acceptance and software readiness Solar: December – Initial tests for improved approach being conducted now. – May not be included in Cycle 3 call but would do a broad science verification campaign for April 9, 2014ASAC telecon22