WRIA 43 Phase 3 INSTREAM FLOW RECOMMENDATIONS Building a Watershed Plan with the Functions and Values of the WRIA 43 Planning Unit April 18 th, 2006 Meeting.

Slides:



Advertisements
Similar presentations
U.S. Department of Energy Pacific Northwest National Laboratory Evaluation of Juvenile Salmonid Culvert Passage SM Anglea, GD Williams, KD Ham, and GA.
Advertisements

Ecosystem Flows Hydrology and Connectivity Joe Trungale October 2, 2006.
Doug McChesney Water Resources Program Washington Department of Ecology Western States Water Council Water Resources Committee Meeting April 1, 2004 Challenges.
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Implementing A Section 319 Project During a Time of Regulatory Change The Catoma Creek Story Alabama Water Resources Association Conference September 2005.
Governor’s State Water Law Review Committee Recommendations 1982: Implementation Update David G. Baize Bureau of Water.
Recommendations for a Statewide Water Plan By: Ewan Hadgraft Alabama Rivers Alliance Birmingham-Southern College.
In-Stream PIT-Tag Detection of Resident Salmonids in Washington's White Salmon River Watershed: One System ’ s Saga. Ian G. Jezorek 1, Patrick J. Connolly.
Bree Collaborative Cardiology Report: Appropriateness of Percutaneous Cardiac Interventions (PCI) Bree Collaborative Meeting November 30, 2012.
Streams in urbanizing landscapes: from syndrome diagnosis to watershed prescription NSF Grant
Chubaka Producciones Presenta :.
Minnesota Agricultural Water Quality Certification Program Senate Environment, Economic Development And Agriculture Finance Committee March 11, 2013.
Koktuli River Instream Flow Reservation Cathy Flanagan Bristol Bay Native Association.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
David P. Lusch, Ph.D. 1 / 26 David P. Lusch, Ph.D. Distinguished Senior Research Specialist Michigan State University Dept. of Geography,
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
WATER RIGHT DISTRIBUTION WRIA 53 – LOWER LAKE ROOSEVELT WATERSHED PRESENTED BY: Gene St.Godard. P.G., L.HG. Water & Natural Resources Group, Inc. Spokane,
1 Proposed Revisions to the National Standard 1 Guidelines: Adding Guidance on Annual Catch Limits and Other Requirements Presentation to the Regional.
Identification of King County Streams with Declining Summer Flows Curtis DeGasperi, King.
LOW-FLOW MONITORING IN SONOMA CREEK AND TRIBUTARIES In June 2000, Sonoma Ecology Center staff initiated a low-flow monitoring program in Sonoma Valley.
Youghiogheny River Lake Storage ReAllocation for Downstream Water Supply by Werner C. Loehlein, P.E.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
WRIA 43 Phase 3 Plan Development Building a Watershed Plan with the Functions and Values of the WRIA 43 Planning Unit May 16 th, 2006 Meeting.
Town of Olympic Valley Negotiation Process April 1, 2014.
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
Recommendations for Determining Regional Instream Flow Criteria for Priority Tributaries to the Sacramento-San Joaquin Delta A Report to the California.
WRIA 43 Phase 3 Plan Development Building a Watershed Plan with the Functions and Values of the WRIA 43 Planning Unit March 21 st, 2006 Meeting.
WRIA 43 Phase 3 Plan Development Building a Watershed Plan with the Functions and Values of the WRIA 43 Planning Unit.
James W. Beever III Southwest Florida Regional Planning Council 1926 Victoria Avenue Fort Myers, FL ( , ext 224)
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
WRIA 43 Upper Crab/Wilson Creek Draft Watershed Plan Building a Watershed Plan with the Interests and Values of the WRIA 43 Planning Unit July 13 th &
HYDROELECTRIC POWER AND FERC. HYDRO 101A ”Water Runs Down Hill”
Addressing the Sediment Problem in Sonoma Creek Watershed Rebecca Lawton 1, Deanne DiPietro 1, Laurel Collins 2, Arthur Dawson 1 1 Sonoma Ecology Center,
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Policy for Maintaining Instream Flows in Northern California Coastal Streams Monitoring and Reporting Provisions for Water Rights Victoria Whitney Deputy.
Watershed Management Act ESHB 2514 by 1998 Legislature RCW Voluntary Process Purpose: to increase local involvement in decision-making and planning.
WATER MARKETS IN WASHINGTON Presented by: Eugene N.J. St.Godard, P.G., C.HG. Principal Hydrogeologist/Owner Water & Natural Resource Group P.O. Box 28755,
“The minimum flow for a given watercourse shall be the limit at which further withdrawals would be significantly harmful to the water resources or ecology.
Alabama Water Resources Association Geological Survey of Alabama
March 21, 2006 Engrossed Second Substitute House Bill 2860 Columbia River Basin – Water Supply Keith Holliday Watershed Lead Washington State Dept. of.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
WRIA 43 Phase 3 Plan Development Building a Watershed Plan with the Interests and Values of the WRIA 43 Planning Unit June 20 th, 2006 Meeting.
MSRA Implementation Status Update. 2 Implementation Strategy Divide tasks Priority 1 – Due date specified in the Act Priority 2 – Required, but no due.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Environmental Flow Instream Flow “Environmental flow” is the term for the amount of water needed in a watercourse to maintain healthy, natural ecosystems.
MACQUARIE RIVER CATCHMENT WATER MANAGEMENT PLAN PUBLIC MEETING ( Information Session) ROSS TOWN HALL 10:30 AM WEDNESDAY, 12 DECEMBER, 2012 Department of.
Habitat suitability and availability for rainbow trout Oncorhynchus mykiss in the Canyon Reservoir tailrace Greg Cummings.
Bow Basin Watershed Management Plan Revised Terms of Reference
Tillman Creek Acquisition
Overview of Spokane- Coeur d’Alene Hydrology
Watershed Planning in the Pend Oreille River Basin in WA
Grid Code Review Panel 16th August 2017
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Study Update Tailrace Slough Use by Anadromous Salmonids
WATER POLICY And Management in AlabamA
Instream Flows in the Spokane River
2040 Long Range Transportation Plan Update
McDonald’s Kalender 2009.
McDonald’s calendar 2007.
Department of Water and Sanitation
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
New Special Education Teacher Webinar Series
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

WRIA 43 Phase 3 INSTREAM FLOW RECOMMENDATIONS Building a Watershed Plan with the Functions and Values of the WRIA 43 Planning Unit April 18 th, 2006 Meeting

No.Issue StatementRank ISF-1 WRIA 43 is a hydraulically unique and complex system of streams 1 Wqual-1 Poor water quality is a threat to human health and the environment 2 Hab-1 The physical and biological relationship in Crab Creek is one of the most poorly understood ecosystems in the northwestern United States 3 Wstore-1There is insufficient available water resources in WRIA 434 Wquan-1Management of water in WRIA 43 is required5 WRIA 43 Issue Development

Basic Over Riding Principal of the Watershed Plan “The Crab Creek watershed is a unique and poorly understood physical and biological environment that requires local input for management to protect the functions and values of the residents and landowners within the watershed”.

INSTREAM FLOW  Steering Committee determined to provide recommendations for an instream flow  Basic premise was for local citizens to recommend flows before Ecology sets flows  ISF study gave recommendations only for the flows which would maximize habitat area for the different life stages of trout  Importance of setting an ISF may not be that significant due to a 1943 BOR water right certificate that allocates “all the unappropriated public waters of Moses Lake, Crab Creek, Rocky Ford Creek, and Lind Coulee” from November 1 to April 15 annually  Ecology is split on whether to set or not (regional v. Olympia)

Key Findings of Phase 2  For the results of the instream flow study, the consultant specifically referenced: “it is important to understand that this analysis is an assessment of the flows in Crab Creek necessary to maintain maximum habitat area for native salmonids and is not an instream flow recommendation itself”.  The study was conducted during drought conditions and flows greater than 20 cfs were not available. Thus, the results are based on the stream conditions as they occurred when the flows were relatively low.  The study was conducted on two gauging sites that are located 28 miles apart on short perennial reaches of Crab Creek. However, an estimated 12 miles of main stem channel, between the two study locations, is dry more often than it flows.

Key Findings of Phase 2 (cont)  The output from the PHABSIM model is for rainbow trout. However, since it cannot be sure if rainbow trout in Crab Creek exhibit the same behavior as fish used to establish the modeling curves, the consultant could not be sure that the curve trends precisely match the behavior of rainbow trout that have adapted to the Crab Creek conditions.  The hydraulic continuity analysis was unable to establish a relationship between the flows at the two gauge sites and therefore cannot predict the flow at one gauge based on the flow at the other gauge.  The primary conclusion of the instream flow analysis as dictated in the Phase 2 Technical Assessment was: “given the complex nature of Crab Creek’s hydrology, we believe it (the instream flow analysis) is limited in its ability to represent the actual environment that exists throughout the Crab Creek Watershed, and the results should not be extrapolated beyond these areas.” Therefore it is recommended that the flow recommendations are only applied to the estimated 1.15-mile reach of Crab Creek where each gauging station is located.

Recommended Flows for Protection of Fish Habitat (trout) Month Rocky Ford Irby Range in Rpt Recom. Recom. October cfs 18 cfs 28 cfs November cfs 18 cfs >5 cfs 5 cfs December cfs 28 cfs > 5 cfs 5 cfs January cfs 28 cfs > 5 cfs 5 cfs February cfs 28 cfs > 5 cfs 5 cfs March 50 cfs (3/1) 50 cfs cfs 10 cfs April↓ 37 cfs cfs 10 cfs May 24 cfs (5/31) 24 cfs cfs 10 cfs June cfs 18 cfs 28 cfs July cfs 18 cfs 28 cfs August cfs 18 cfs 28 cfs September cfs 18 cfs 28 cfs

Recommended Flows

CONDITIONS  The Planning Unit does not want to recommend a reservation account with the instream rule making process and does not support any such reservation associated with the instream flow rule making process.  Ecology to only condition future surface water diversions to the instream flow that are within the perennial reaches of Crab Creek at the Irby and Rocky Ford Road gauging locations, that section of creek which is no further than 1.15 mile upstream of each gauging station (the reaches that were evaluated in the Phase 2 Technical Assessment). This is recommended as a result of the hydraulic analysis conducted during the instream flow study between the two gauging stations which revealed that there is no correlation of flows between the gauging stations and the creek is flowing under unique hydrologic conditions. And the findings that the instream flow analysis is limited in its ability to represent the actual environment that exists throughout the Crab Creek Watershed.

CONDITIONS (cont)  Ecology to only condition future groundwater withdrawals to the instream flow that are demonstrated to have a direct hydraulic continuity to the creek, such as wells within the unconsolidated sediment aquifers. Also Ecology to exempt groundwater withdrawals from an interruptible status if they meet the following provisions: –Groundwater withdrawal is extracting groundwater from the Grande Ronde basalt aquifers. –Groundwater wells are cased throughout the unconsolidated sediments and a minimum of 200-feet into the basalt bedrock. –Proponent of a groundwater well to be completed in the unconsolidated sediment aquifer and/or Wanapum aquifer that does not meet the previous two criteria demonstrates there is not a direct hydraulic connection from the groundwater withdrawal to the stream reach where the gauging station is located, which is based upon best available science.

CONDITIONS (cont)  Ecology to reopen instream flow rule in 10-years after initial adoption date and reevaluate if flows should be modified if additional data and analysis is available. Ecology and WDFW will work with the WRIA 43 watershed group in a cooperative effort to reach agreement on any future flow modifications, if proposed.  Ecology or other state agencies will not propose any new or modify future existing instream flows within WRIA 43 unless they are negotiated and agreed upon with the local watershed planning group (and any subsequent adaptations to the implementation group).

CONDITIONS (cont)  Ecology is obligated to use the mutually agreed upon flow levels for their draft rule and must start the process over from the beginning with local negotiated input if the public testimony at the hearings is strongly for recommending a different flow level.  Ecology not to condition any domestic exempt wells to the instream flow rule

What’s Next???????  Process has now been started to develop a mutually agreed upon flow recommendation  Ecology to consult with WDFW with PU recommendations  Ecology & WDFW either accept and agree with recommendations or provide edits to recommendations  Process continues until there is a “Mutually Agreed Upon Recommendation”

Recommended Flows for Protection of Fish Habitat (trout) Month Rocky Ford Irby Range in Rpt Recom. Recom. October cfs 18 cfs 28 cfs November cfs 18 cfs >5 cfs 5 cfs December cfs 28 cfs > 5 cfs 5 cfs January cfs 28 cfs > 5 cfs 5 cfs February cfs 28 cfs > 5 cfs 5 cfs March 50 cfs (3/1) 50 cfs cfs 10 cfs April↓ 37 cfs cfs 10 cfs May 24 cfs (5/31) 24 cfs cfs 10 cfs June cfs 18 cfs 28 cfs July cfs 18 cfs 28 cfs August cfs 18 cfs 28 cfs September cfs 18 cfs 28 cfs

Gene St.Godard, P.G., L.HG. Principal Hydrogeologist/Owner Water & Natural Resource Group P.O. Box 28755, Spokane, WA ,

Instream Flow & It’s Relationship to Senior/Junior Water Right Holders Water Right Flow Alloc. (cfs) 15 cfs 9.5 cfs 8.0 cfs 7.0 cfs 5.0 cfs 3.0 cfs S-1(1920)2.0OnOnOnOnOnOn S-2(1930)1.0OnOnOnOnOnOn S-3(1958)2.0OnOnOnOnOnOff** S-4(1977)0.5OnOnOnOnOff**Off** S-5(1990)1.0OnOnOnOnOff**Off** ISF(2005)2.5OnOnOffOffOffOff J-4(2006)0.5OnOnOffOffOffOff J-3(2007)0.5OnOffOffOffOffOff J-2(2010)0.25OnOffOffOffOffOff J-1(2020)0.25OnOffOffOffOffOff Off=can’t use due to ISF. Off**=can’t use due to rule of prior appropriation (water law)

Flows-Rocky Ford

Flows at Irby