All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, 2014 1 It’s a group effort –

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
Superconducting Spoke Resonator Cavities and Cryomodules
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Advanced Energy Systems, Inc. FY 09 AES Phase I Crab Cavity SBIRs Michael Cole, Doug Holmes.
Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
Meeting summary (so far, Monday morning) and comments Tom Peterson, Camille Ginsburg (FNAL), Alex Ratti (LBNL) Crab Cavity Meeting, CERN, 1-6 Aug 2013.
Ofelia Capatina on behalf of the CERN specification team
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Binping Xiao On behalf of the DQWCC team 12/09/2013
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Advanced Energy Systems, Inc. Prototype Cavity Fabrication & Test Presented by Ilan Ben-Zvi, BNL for Michael Cole, AES.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
6 TH C RAB C AVITY W ORKSHOP – December 9-11, 2013, CERN (Geneva, Switzerland) Silvia Verdú-Andrés Silvia Verdú-Andrés on behalf of (BNL) Sergey Belomestnykh,
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
RF-Dipole Cavity: Processing and RF Measurements Procedure
Page 1 Subashini De Silva Center for Accelerator Science Old Dominion University CAVITY II – RF-DIPOLE CAVITY TEST RESULTS LHC – CC-13, CERN December 9-11,
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Crab Cavities: Past, Present, and Future of a Challenging Device
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
UK-Jlab-TechX Designs for the LHC Crab Cavity Dr G Burt Lancaster University / Cockcroft Institute.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The review held at CERN, 10 – 11 Nov. 2015
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
WP 4: Crab Cavity Ed Ciapala, Erk Jensen BE-RF, CERN HL-LHC Meeting, CERN, 20 Oct 2010.
Crab Cavities for the HL-LHC Project Definition and Design Study E. Ciapala, E. Jensen, J. Tuckmantel (CERN) R. Calaga (BNL) US-LARP CM15, November 2010,
Page 1 Jean Delayen Center for Accelerator Science Old Dominion University RF Dipole Cavity Design and Plans LARP Review Fermilab, 10 June 2013.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
WP 4: Crab Cavity Ed Ciapala, Erk Jensen BE-RF, CERN HL-LHC Meeting, CERN, 20 July 2010.
Page 1 Subashini De Silva Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator Facility.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
LHC Crab Cryostat Integration and Planning Meeting – some outcomes
CERN – Zanon discussions
RF Dipole HOM Electromagnetic Design
SRF Crabbing Cavity R&D
Plans towards CC in the LHC a US – centric perspective
Review of options for crab cavities in LHC:
at STFC Daresbury laboratory
Crab Cavities Contribution from the U.S.
Odu/slac rf-dipole prototype
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
Design Fabrication and Processing Group H. Padamsee
HL-LHC-UK: UK contribution to HL-LHC Crab Cavities and evolution
DQW HOM filter fabrication quality control
Double Quarter Wave Crab Cavity
Crab Cavity Manufacturing Readiness Meeting
UK RFD Pre-Series cryomodule
SPS-DQW HOM Measurements
CEPC-650MHz Cavity Cryomodule
Crab – RFD prototype: Fabrication Status Update
SNS PPU Cryomodule Design Overview
Presentation transcript:

All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort – Many thanks to Jean Delayen, HyeKyoung Park, Subashini De Silva, Rocio Olave at ODU Sergey Belomestnykh, Qiong Wu, Silvia Verdú-Andrés, Binping Xiao at BNL Zenghai Li at SLAC Ofelia Capatina, Luis Alberty, Rama Calaga, Giuseppe Foffano at CERN Tom Jones, Shrikant Pattalwar, Graeme Burt at STFC and Lancaster, UK and many others...

Crab Cavities Technical Challenges – Crab cavities have only barely been shown to work. Never in hadron machines – LHC bunch length requires low frequency (400 MHz) – 19.4 cm beam separation needs “compact” (exotic) design Additional benefit – Crab cavities are an easy way to level luminosity! Currently aiming for: – Down-select ~next year – SPS test in LARPUK Without some compensation for crossing angle, Reducing the  * will only increase luminosity by ~75% ! “Piwinski Angle”

All experimenters meeting – July 7, 2014 Crab cavities in the LHC 3

All experimenters meeting – July 7, 2014 Dress Cavity and Cryomodule Highlights Initially three cavity designs. – RF Dipole (Old Dominion University and SLAC) – Double Quarter Wave (Brookhaven) – 4-Rod (UK) A single vendor for all US dressed cavity assemblies. Funding source for US dressed cavities is a $1M 2013 Phase 2 SBIR award to Niowave for the crab cavity cryomodule design and fabrication. Niowave built the prototype for all three designs. No dressed cavities have been built. The cryomodule for both US cavities will be designed and built at CERN. Goal is to have as much commonality in the cryomodule designs as possible. 4

All experimenters meeting – July 7, 2014 Dress Cavity and Cryomodule Highlights (cont’d) BNL is coordinating the double quarter wave cavity design. – Bare cavity design at BNL – Dressed cavity design in collaboration with CERN ODU is coordinating the RF dipole cavity design. – Bare cavity design at ODU – Dressed cavity design in collaboration with Fermilab The tuners will be a joint effort between BNL, ODU, and CERN. The input coupler will be provided by CERN. In addition to being involved in the RF dipole dressed cavity design, Fermilab will play provide oversight of fabrication at Niowave. Eventual need for the LHC is 32 cavities + 4 spares. 5

All experimenters meeting – July 7, 2014 Preliminary high level cavity and cryomodule schedule Cavity Testing & Prototype Cryomodule SPS Cryomodule Fabrication SPS Beam Tests LHC Cryomodule Construction LHC Installation Current focus of all groups is installation and testing in the SPS

All experimenters meeting – July 7, 2014 SPS tunnel location 7 CryomoduleBypass beamline

All experimenters meeting – July 7, 2014 SPS tunnel location 8

All experimenters meeting – July 7, 2014 Sample crab cavity cryomodule in the LHC 9 4 cm with 2 cavities each 2 cm with 4 cavities each 1 cm with 8 cavities

All experimenters meeting – July 7, 2014 RFD dressed cavity (ODU) Waveguide HOM option 10 Helium vesselHOM waveguide Input coupler Vertical HOM Pickup port Dummy beam tube

All experimenters meeting – July 7, 2014 RFD cryomodule (ODU) 11 FPC Tuning system Cryo jumper Thermal and magnetic shielding not shown Side loaded vacuum vessel Waveguide Beam gate valve Cold to warm transition Tuning frame

All experimenters meeting – July 7, 2014 SPS integration 12

All experimenters meeting – July 7, 2014 Tuner + reinforcement beam Space for adjacent beam pipe HOM FPC HOM Cryo jumper Piezo + reinforcement mm 400 mm 565 mm DQW dressed cavity (BNL) 13

All experimenters meeting – July 7, 2014 DQW cryomodule (BNL) 14

All experimenters meeting – July 7, 2014 Dress Cavity and Cryomodule Status Final designs for the RF dipole and DQW are nearly complete at ODU and BNL. Dressed cavity helium vessels, tuners, HOM interfaces, etc. are in process at ODU, BNL, CERN, and Fermilab. The initial release of data from the US labs to Niowave took place in February, final releases will take place over the next several weeks. Solid model and drawing data is being managed through CERN’s EDMS. A technical specs has been released to Niowave from CERN. CERN will approve all drawings, material and fabrication specs, etc. prior to manufacture. 15

All experimenters meeting – July 7, 2014 Thanks very much 16