Audit of Mangrove Management in the Strait of Malacca Cooperative Audit SAI of Indonesia (BPK RI) and SAI of Malaysia (JAN Malaysia)

Slides:



Advertisements
Similar presentations
Presented to By. 2 3Terms and definitions 3.7 competence ability to apply knowledge and skills to achieve intended results.
Advertisements

Goal 3 Knowledge Sharing & Knowledge Services Update from Knowledge Sharing Committee SAI India 1.
AUDIT OF FOREST MANAGEMENT ACTIVITIES RELATED TO THE FOREST INVENTORY, SETTING FOREST AREA, MITIGATION CLIMATE CHANGE, FOREST USE PERMIT AND USE OF FOREST.
Implementing ESD in Major Infrastructure Projects Jo Moss - Senior Principal.
Contractor Management and ISO 14001:2004
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Report of the Knowledge Sharing Committee (Goal-3) Ms. Indu Agrawal SAI-India Comptroller and Auditor General of India1.
System of Environmental-Economic Accounting Advancing the System of Environmental-Economic Accounting Project (AEEA) Research Agenda Mark Eigenraam Senior.
Module developers: Erika Romijn, Wageningen University
Ugyen Tshewang (PHD), Secretary, National Environment Commission Secretariat, RGOB, Thimphu Tshering Choden, (BSc, Sci), Asstt. Environment Officer, National.
IA Clinic. การเตรียมการตรวจสอบ แผนการ ตรวจสอบ แผนการ ปฏิบัติงาน ตรวจสอบ หารือ หน่วยรับตรวจ รายงานผล การตรวจสอบ ติดตามผล การตรวจสอบ ผลการประเมินความเสี่ยง.
Quality assurance in IVET in Romania Lucian Voinea Mihai Iacob Otilia Apostu 4 th Project Meeting Prague, 21 st -22 nd October 2010.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Overview of Activities of Twining Partnership VIETNAM - KOREA N.M. HANG, Office 33.
Basics of OHSAS Occupational Health & Safety Management System
Working Group on Public Debt Progress Report 6th Meeting of the Steering Committee of the INTOSAI Committee on the Knowledge Sharing and Knowledge Services.
INTOSAI Public Debt Working Group Updating of the Strategic Plan Richard Domingue Office of the Auditor General of Canada June 14, 2010.
THE SIGNIFICANCE OF RESIDENTIAL PROPERTY IN MALAYSIAN PROPERTY SECTOR Muhammad Najib Mohamed Razali Hishamuddin Mohd Ali Department of Property Management.
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
Revision of ISSAI 5422 “An Exercise of Reference Terms to Carry out Performance Audit of Public Debt” | WGPD Mr. Roberto Salcedo Deputy Auditor.
INTOSAI Capacity Building Committee Meeting Stockholm, 8-10 September 2015 SAI capacity from a Post-2015 development agenda perspective The PASAI cooperative.
Environmental auditing
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
BPK Strategic Planning: Briefing for Denpasar Regional Office Leadership Team Craig Anderson Ahmed Fajarprana August 11-12, 2005.
RTI, MUMBAI / CH 41 IMPLEMENTING THE PERFORMANCE AUDIT PLAN FOR THE SELECTED SUBJECT DAY 4 SESSION NO.1 (THEORY) BASED ON CHAPTER 4 PERFORMANCE AUDITING.
Private & Confidential1 (SIA) 13 Enterprise Risk Management The Standard should be read in the conjunction with the "Preface to the Standards on Internal.
Assessing The Development Needs of the Statistical System NSDS Workshop, Trinidad and Tobago, July 27-29, 2009 Presented by Barbados.
Review of International Experience in Development and use of Key National Indicators State Audit Office of the Republic of Latvia 13 k-5 Skanstes Street,
INTOSAI STANDARDS August 2012
EGTEI – Expert Group on Techno-economic Issues Methodology for data collection Presented by Nadine Allemand EGTEI secretariat Workshop to promote ratification.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 24, 2009.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Guidelines for LDS preparation for Croatian LAG’s Estonian Leader Union Kadri Tillemann and Kristiina Timmo 28 th of September, Zagreb.
Working Group on the Value and Benefits Chair´s Report 7th Meeting of the Steering Committee of the INTOSAI Committee on the Knowledge Sharing and Knowledge.
Presentation by the Accounting Chamber of Ukraine – Parallel Audit Coordinator Progress Report on the Initiative: Concept Framework of Coordinated Parallel.
Session 1. Introduction to the Toolkit. Sub-objectives of Session 1. The purpose of the toolkit Outline of the contents How can we use the toolkit? The.
1 Performance Auditing ICAS & IRAS Officers NAAA 21 Jan 2016.
Site Visit Opening Meeting. Washington State Quality Award Council2 WSQA MISSION Make Washington State a better place to live, learn, and work by helping.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 32 – Financial Control Bilateral screening:
5. Presentación general de la iniciativa REDD+ SES 5. Presentation of the REDD+ SES Initiative.
The Project Outputs and Activities.
Lecture #2: Know Your States
14th CAS meeting Performance reporting Presentation by SAI-SA
Auditing Sustainable Development Goals
State Audit Bureau of Kuwait
Country Paper of Supreme Audit Court of I. R. Iran
SAI Sudan Experience in Environmental Auditing
Cooperative Environmental Audit on Mekong River Basin Management
AUDIT ON FOREST MANAGEMENT – MALAYSIAN EXPERIENCE
INTOSAI Working Group on Environmental Auditing The 5th Seminar on Environmental Auditing and 4th Working Meeting of ASOSAI WGEA Hanoi, 15 April 2014.
Dr. H. Ömer KÖSE Principle Auditor
Mexico 8th Meeting of the Steering Committee of INTOSAI Committee on
THE AUDIT BOARD OF THE REPUBLIC OF INDONESIA
OFFICE OF THE AUDITOR GENERAL, NEPAL
INTOSAI WGEA – Steering Committee Meeting Morocco, March 2011
Activities of the EUROSAI Working Group on the Audit of Funds Allocated to Disasters and Catastrophes (EUROSAI WGAFADC) 14th EUROSAI WGEA Meeting Accounting.
Bradley Reed USGS Climate and Land Use Change
Predetermined Objectives – 2013/14
Level 1 HSE M S Audit Insert Title here Closing Presentation
AUDIT OF WATER RESOURCES May 2016 Tehran IRAN
USE OF PEMPAL KNOWLEDGE PRODUCTS
How to conduct Effective Stage-1 Audit
THE INTOSAI WORKING GROUP ON KEY NATIONAL INDICATORS
15 March 2017 Briefing to Portfolio Committee of the Higher Education and Training on review of the draft APPs.
Finalisation of study report
Finalisation of study report
AUDIT QUALITY REGULATORY FOCUS AREAS
Presentation transcript:

Audit of Mangrove Management in the Strait of Malacca Cooperative Audit SAI of Indonesia (BPK RI) and SAI of Malaysia (JAN Malaysia)

AGENDA Background The Audit Why Strait of Malacca Form of Cooperation and the Location Audit Objective and Output Audit Design Matrix, Audit Methodology, Approach, Technique and tools The Impact of Cooperation

Background Memorandum of Understanding between BPK RI and JAN Malaysia was signed in 4 Nov 2007 in Mexico (INCOSAI) The implementation areas are audit on taxation, environmental audit and training. The Environmental Audit : First Cooperative Audit : Management of Forest ( ) Second Cooperative Audit : Management of Mangrove in the Strait of Malacca ( )

Background First Technical Meeting at Kota Kinabalu, Sabah, Malaysia on October 8, 2009 We will develop report about how we conduct parallel audit (The Report). The contents of the report including Audit Planning Memorandum (APM), Audit Methodology, Audit Approaches, Objectives, Audit Findings and Lesson Learned from conducting parallel audit. The main issue : Mangrove Management in The Strait of Malacca The Second Technical Meeting in Jogyakarta Indonesia ( May 2010) The Planning Meeting The output : Audit Objective, Audit Design Matrix, Audit Approach, Audit Methodology, Audit tool and Audit procedures

The Audit Why Strait of Malacca? The Strait of Malacca is located between three countries, Indonesia, Malaysia and Singapore. From economic and strategic perspective, the Strait of Malacca is one of the most important shipping lanes in the world. The density of shipping in Malacca Strait has developed significantly and made it the second densest strait in the world after Dover Strait located between England and France. The strait is the main shipping channel between the Indian Ocean and the Pacific Ocean. The heavy traffic makes it prone to pollution especially from oil spill. Pollution also comes from the island of Sumatra and Malacca Peninsula. The polluted water from the Strait of Malacca and other kind of water pollutions endanger the quality of the mangrove and its ecosystem. Therefore, the Government needs to increase the effort to decrease the pollution in the straits of Malacca in order to improve the quality of the mangrove and its ecosystem along the coast lane of the straits of Malacca. SAI of Indonesia and Malaysia conducted its Parallel Audit in order to persuade the Government to improve the quality of their management through our audit.

6 Strait Of Malacca Perlis Kedah Penang Perak Selangor Negeri Sembilan Melaka Johor

The Audit Form of Cooperation : Performance Audit A seperate audit team : 1) National audit report will be submitted to each government and parliament. 2) Each SAI may adopt a different approach suited to its national needs, and, Information exchange is the most important aspect of this form of coopretaion. The Location : Mangrove forest area along the Strait of Malacca : Indonesia : North Sumatera, Riau and Kepulauan Riau Malaysia : Peninsular Malaysia of eight states consists of Perlis, Kedah, Penang, Perak, Selangor, Negeri Sembilan, Malaka and Johor.

The Audit Audit Objective : To assess whether the management of mangrove have been implemented efficiently and effectivelly in accordance with the relevant laws and regulations as welll as achieved its stated objectives with consideration to environmental impact. The Output : Report about how we conduct parallel audit. The content of the report including Audit Planning Memorandum (APM), Audit Methodology, Audit Approaches, Audit objectives, Audit Findings and Recommendation, and lesson learned from conducting parallel audit.

The Audit Audit Design Matrix BPK RI and JAN Malaysia will refer the Guidance Material (Auditing Forests : Guidance for Supreme Audit Institutions) in designing each National Audit Plan Memorandum. Criteria : The Approved Audit Design Matrix has had audit criteria but each SAI is allow to use additional criteria from their own law, regulation and other criteria

The Audit Audit Methodology Examining the documents and records, Review, Sampling and Focus Group Audit Technique Observation, Data Collection, Analyzing, Interview, Questionaires and Site Visit. Audit Approach Risk Based Audit and Expert Involvement (Professional Briefing) Audit Tool : Geo Spatial Technology (GPS, GIS and Remote Sensing) and other relevant technology.

The Impact of the Cooperation Build the capacity of the auditor in auditing the forest. Training “how to use GIS and GPS as tool in auditing the forest” for the auditor. Exchange information and experience Audit methodology, strategy, and findings including the recommendation. Information about the condition of the forest of each country, the management practice in the forestry sector etc.