Work Products Executive Summary draft drafted Strait Response Strategy drafted Eastern WA Response Strategy drafted Accomplishments ID of tool for responders.

Slides:



Advertisements
Similar presentations
Challenging Behaviour: a unified approach- refresh
Advertisements

Managing Evaluations for Consistently High Quality American Evaluation Association Annual Conference Molly Hageboeck.
INCREASED CRUDE BY RAIL PART 1: ASSESSING THE RISK.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
CSE 308 Project Management. SWE Communication Skills Management: Run a team meeting Presentation: Present aspects of your project during its development.
Problem Statement Anoka county health department identified a lack of community representation in the Planning Workgroup for the Statewide Health Improvement.
(Project) SIGN OFF PROCESS June 21, 2010
AUDITS Process and Corrective Actions OIG RolesGAO ROLES – OIG –OIG Lead Auditor –OCFO – owner of MATS and Agency Audit Process –OEI AA – Designated OEI.
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Design Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
IS&T Project Management: How to Engage the Customer September 27, 2005.
SOAR – Preparing for Launch Task Force Information January 2015.
Puget Sound Coalition for College and Career Readiness Compact Implementation John Welch, Superintendent Peter Daniels, Executive Director of Communications.
NORMA GOMEZ, MBA, MSN, RN, CNN Unique Challenges for the Nephrology Professional in Managing Change.
Proceedings and Report of the Expert Meeting: Arrangements Proceedings and Report of the Expert Meeting: Arrangements.
2015 Task Forces – June Update 1. Operations Structure 2. Plan Accessibility 3. Public Affairs Update 4. Quick Reference Guide for Local and Tribal Officials.
MAC Committee Update Robert Kondziolka, MAC Chair.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Do it pro bono. Key Messages & Brand Strategy Service Grant.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Places of Refuge Task Force. POR Task Force Products Following a presentation to the RRT the NWACP steering committee directed our group to work to: Finalize.
ESA Section 7 Emergency Consultation Tool Task Force.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
 NW Area Committee members gather and discuss best use of limited time for contingency planning in coming year.  Result: Targeted Task Forces ◦ ~ Eight.
NW Area Committee Meeting 13 February, 2013 Heather A. Parker U.S. Coast Guard 13 th District Seattle, WA.
Water Supply Planning Initiative State Water Commission November 22, 2004.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
Wgnho Management for Performance Department of Conservation Management for Performance Project.
Do it pro bono. Naming & Visual Identity Service Grant.
ESPON 2013 Programme Info Day on New Calls and Partner Café Call for Proposals on Applied Research.
1 Emergency Management Forum – 8 January 2009 Department of Crime Control & Public Safety Division of Emergency Management.
Struktūrfondu vadošā iestāde – Finanšu ministrija 1 1 Communication Strategy of EU Funds Sanda Rieksta Head of Information Division, Deputy Head.
Deloitte Consulting LLP Commonwealth of Massachusetts Statewide Strategic IT Consolidation (ITC) Initiative IT Governance Subcommittee Working Session.
Update Utilization of AMD in Well Development for Natural Gas Extraction May 16, 2012.
Deloitte Consulting LLP Commonwealth of Massachusetts IT Consolidation Initiative IT Governance Target State Update Briefing for Statewide Working Group.
Introduction to policy briefs What is a policy brief? What should be included in a policy brief? How can policy briefs be used? Getting started.
Company Confidential 1 AS9104/2A Oversight Standard Revision Report Tim Lee Project Chair September 11, 2012.
Target State High-level IT Governance Model
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
Test status report Test status report is important to track the important project issues, accomplishments of the projects, pending work and milestone analysis(
NW Area Committee and Regional Response Team X. What is an Area Committee? Interagency group charged with pre-planning for oil spills Comprised of any.
U.S. IOOS Communication Strategy June 28, 2013 National Oceanic and Atmospheric Administration U.S. Department of Commerce.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
Joint BPS and ESS/ITS ATC/AFC Subcommittee Update November 2007 – January 2008 February 5, 2008.
2011 Updates to the NW Area Contingency Plan List of Some Key Proposed Changes NWAC Meeting 29JUN11 – BOISE, ID.
“The documentation is the design, the design is the system!” Copyright © SDL Task Force Consortium. All rights reserved.
NEM201 Week 4 Project Plan Create and complete outstanding items. 01. Front Cover 02. Document details 03. Scope Document 04. Technical Design 05. Creative.
SWMP UPDATE. GOOD NEWS! Task 1: Work Plan Task 6: SWMP Model Runs Sub-Task 6.1: Baseline/Current Conditions Model Runs Sub-Task 6.2: Model Runs to Evaluate.
HP-PPM Work Plan Configuration Options Project & Time Management Version 7 Implementation Project\Work Plan and Time Management\Work Plan Configuraiton.ppt.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Tim Lee The Boeing Company September 17, ICOP Oversight Revision Status.
Information Sharing for Integrated Care A 5 Step Blueprint.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
Project Charter 1.Overview / Background Section 2.Governance / Authority Section 3.Approach Section.
Community Air Monitoring (CAM) Progress Report
IAA Brand Review Recommendation to the Executive Committee
CIPC Relationships & Roles
PLANNING.
1915(i)& (k) Implementation Update
Task Force Brief Cultural and Historic Preservation Task Force
Overview of Revisions to the Standards and Competencies
Project Integration Management
TIBC Budget Formulation Improvement Project
Working Group Out-Briefs
Places of Refuge Task Force
Project Integration Management
CIM Cooperative Work Program (COOP)
Presentation transcript:

Work Products Executive Summary draft drafted Strait Response Strategy drafted Eastern WA Response Strategy drafted Accomplishments ID of tool for responders to be used to communicate why one or several specific response option(s) may be best and why others may not. Location of tool (i.e., Section 3000 of Plan (e.g., 3720) Target audience for tool: external member (e..g, County Councilman) to be used as briefing sheet

Challenges/ Shortfalls/ Gaps Competing operational demands in May postponed mtgs Forecast competing Op Tempo for TF members to remain high in June & July Facilitator swap mid-June may impact continuity Initial product will be Version 1.0 for two distinct operating environments. Additional areas can be added later and require continued focus and many additional work hours.

Plan Of Action and Milestones Next Meeting: Planned for week of June 11 th at Sector Puget Sound. Objectives: Decide format for final product (draft for Strait or inland version) Decide which location/version to focus remaining effort on to submit for inclusion in Area Plan Deliverables: A completed 1.0 version briefing tool with executive summary for one specific type environment (either Strait or inland) to be placed in specific section (i.e., 3000) of Area Plan.

Create a boilerplate dispersant decision memo Map delineating approval/conditional approval (within Puget Sound) Create a boilerplate decision memo for ISB if time allows

Shoreline Task Force SCAT flow diagram and checklist SCAT best management practices 2 boilerplate SCAT plans (small spill, large spill) Update main body of the plan with basic SCAT information Shoreline pre-segmentation Pre-establish divisions if time allows

Tools to Guide decision making FOSC Dispersant Authorization Checklist - Section Supplemental Checklist, Section 4622; Map of area (spill specific) Decision Memo produced for the RRT (this is tool we are creating); Dispersant use plan (this is tool we are creating); After Action Report by the USCG.

Approval Status Conditional Approval Pre-approval* No Approval* Recommend we change language in the plan to clarify roles, timing, process & tools