1 HELIOS HE licopter L ow (Altitude) I FR O peration S witzerland HERZLICH WILLKOMMEN.

Slides:



Advertisements
Similar presentations
B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
Advertisements

MINIMUM NAVIGATION PERFORMANCE SPECIFICATION AIRSPACE (MNPS)
Flight Operations View
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
1 PP 48 Use of GNSS distance instead of DME B. Rabiller CNS-ATM steering group meeting Gatwick February 2008.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
PROCEDURE DESIGN CRITERIA
Instrument Ground Training Module 3 Randy Schoephoerster
GAGAN USER GROUP INTERACTION PROGRAM WITH HELICOPTER OPERATORS 10 th July 2014 Airports Authority of India New Delhi Airports Authority of India- FPD section1.
USER COMMUNITY NAVIGATION TRANSITION PLAN 19 TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June 3-7, 2002 Phoenix, Arizona Presented by Frank Alexander Northwest.
PBN Plan Development Aviation Industry Forum 18 November 2009.
O/Cdt. Darcel “I picked the wrong day to stop teaching Air Law”
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
References: FAR Part 61, Part 91, AIM
PBN OVERSIGHT IN AUSTRALIA
277a_W00OCT03_CM FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Presentation GNSS 7.3 by Hank Cabler Co-Chairman, SOIT.
Sep 2012 Lesson 3.4 Air Law Air Traffic Rules. Reference From the Ground Up Chapter 5.1: Air Traffic Rules and Procedures Pages
This presentation contains notes in the notes sections for use by instructors when presenting to students.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
AIRSPACE What’s old –What’s new!.
Parts Part 1 – Definitions/Abbreviations Part 21 – Certification Procedures for Products/Parts Part 43 – Maintenance, Preventative Maintenance, Rebuilding,
6-1 Design of UAV Systems UAV operating environmentsc 2002 LM Corporation Lesson objective - to discuss UAV Operating Environments including … National.
Aircraft Certification and Operational Approval D. J. Hawkes Chairman JAA CNS/ATM Steering Group Luxembourg 2001 oint Aviation Authorities EUROCONTROL.
1 Presented by Erwin Lassooij (ICAO, Montreal) Presented by Erwin Lassooij (ICAO, Montreal) From RNP divergence to Performance Based Navigation Convergence.
1 World Dispatch Summit Toronto, Canada May 2002 ETOPS Presentation Ralph Webster Transport CanadaTransports Canada Safety & SecuritySécurité et sûreté.
The Benefits of RNP-RNAV in Commercial Operations 4 th Steering Committee Meeting COSCAP-North Asia 2, 3 March 2005, Shanghai, PRC Captain Frank M. Hankins.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 Pat Benson GPS AIR INTEGRATIONS Digital Aeronautical Data for Navy GPS Aircraft Integrations September 2004.
From RNP Divergence to Performance Based Navigation Convergence
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March Dave Nakamura ICCAIA/Boeing Member to ICAO OCP and RNP SORSG.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
FAA NAVAID Rationalization / Resiliency Overview
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
TYPES, AIRSPACE CLASSIFICATION, CHANGE FROM ONE TO ANOTHER
U.S. AIRSPACE.
Workshop on preparations for ANConf/12 − ASBU methodology
PBN OVERSIGHT IN AUSTRALIA
Overview of Continental En-route Navigation Specifications
Developing a Low Level IFR Helicopter Infrastructure
Airports, Airspace, & Radio Communication
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
An Airline Perspective
Air Traffic Organization
PBN Performance Based Navigation
Performance Based Navigation: Navigation Specifications
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Regional RAIM Prediction System – Progress Report
SEPARATION Module 1, Topic 1.
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Oceanic and International Operations
IAOPA 29th IAOPA World Assembly Queenstown, NZ March 2018 PBN and the Benefits for GA.
FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Hank Cabler
How Air Traffic Is Coordinated
PBN and the benefits for GA
Oceanic and International Operations
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
GNSS Approach for General Aviation
RNAV and RNP Strategy in Japan
New Entrants, Commercial Space and Changing Airspace Management
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
PBN ICAO HQ Activities Overview
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

1 HELIOS HE licopter L ow (Altitude) I FR O peration S witzerland HERZLICH WILLKOMMEN

2 Actual Situation in Switzerland: All Medical Helicopter Operations take place under VFR conditions Reduced availability of our Service in weather conditions below VFR Minima's

3 Inversion

4 Objective of HELIOS Increase the safety of HEMS in weather conditions below VFR Minima's Increase the operability of HEMS use GPS /EGNOS as IFR Primary Navigation

5 One result of our efforts to reduce risk in VFR operations All EC 145 aircrafts and part of the crews are IFR certified Why not use this capability to increase safety and mission regularity?

6 Planned Route Network Genève Yverdon Neuchâtel Biel Basel Solothurn Aarau Fribourg Lausanne Bern Zürich Schaffhausen Winterthur Luzern Zug St. St. Gallen Wil Frauenfeld Zofingen Münsterlingen 4’000 – 6’000 ft AMSL 4’000 FL 40 4’000 FL 40 4’000 6’000 5’000 6’000 Nyon

7 Planning Process Phase 1 Feasibility Study (Mai 04) Phase 2 Implementation Preparation(2006) Phase 3 Implementation(2007) Phase 4 Post-Implementation(2008)

8 Participants: FOCA (Regulatory Authority) Skyguide (ATS Provider) Helicopter and NAV Manufacturer Swiss Airforce (Airspace User) Swiss Air Ambulance (Operator) International Co-Operation (EHAC Members)

9

10 PIS Approach Minima Nyon Hospital1410 ft MSL MAWP1810 ft MSL (MDA) Distance MAWP to Hospital 0.83 NM or 1537m JAR OPS 3 NVFR Minima's: Vis. 3000m no clouds below 1000 ft AGL Proceed visually from MAWP or conduct the specific missed approach procedures (St.Prex VOR)

11 Route Lausanne - Geneva

12 PIS Approach Minima Geneva Hospital1380 ft MSL MAWP2050 ft MSL (MDA) Distance MAWP to Hospital 0.28 NM or 518 m JAR OPS 3 NVFR Minima's: Vis. 3000m no clouds below 1000 ft AGL Proceed visually from MAWP or conduct the specific missed approach procedures (GVA VOR)

13Documentation ICAO DOC 8168 /611 Procedures for Air Navigation Services / PANS OPS (Helicopter part in Progress) FAA TERPS Order B Helicopter Procedures FAA TERPS Order Helicopter GPS Non Precision Approach criteria JAA Leaflet 10 / 3 Airworthiness and Operational Approval for Precision RNAV Operation Helicopter Flight Manual EC 145 Subsection Navigation Management System (System meets RNP 1 / RNP 0.3 accuracy) RAIM predication

14 Equipment

15 EQUIPMENT USED FOR TESTS CMA 3000 Navigation Management System (standard on board our EC-145)

16 EGNOS PANS-OPS Heli NAV Rx EGNOS Airspace“G”/“E” ATC Helicopter Critical points:

17 Situation in other areas GPS-based GNSS approaches are applied in –USA –Canada –Australia / Norway For Rotorcraft and Fixed-wing aircraft Specific GNSS-procedures (NPA) are in force in Germany and France at certain sites France (DGAC) has started work on APV for Rotorcraft and Fixed- wing aircraft

18 LESSONS LEARNED GNSS approaches to hospitals are possible even in Switzerland (? EGNOS is a prerequisite, GPS stand-alone is not accepted by the Swiss authorities ?) For some sites, Point-in-Space approaches provide lower minima and permit extended operations We also have an urgent need for specific IFR procedures for helicopters (NPA and APV) (ICAO, EAS; JAA) The road to HELIOS is still long and sinuous, but …

19 The “clouds” are slowly lifting... Thank you for your attention