PBN Plan Development Aviation Industry Forum 18 November 2009.

Slides:



Advertisements
Similar presentations
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Advertisements

Introduction to Navigation Specifications
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Overview of Continental En-route Navigation Specifications
Javier Perez Diestro Air Navigation International Director
Overview of the PBN Airspace Implementation Processes
PBN ICAO HQ Activities Overview
UK Performance-based Navigation (PBN) Implementation Status
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Presented to: REACT Workshop By: Jay Merkle Date:25 June 2008 Federal Aviation Administration High Density Airport Time- based RNAV/RNP NextGen/JPDO Demonstrations.
USER COMMUNITY NAVIGATION TRANSITION PLAN 19 TH ANNUAL FAA/JAA INTERNATIONAL CONFERENCE June 3-7, 2002 Phoenix, Arizona Presented by Frank Alexander Northwest.
PBN Airspace Concept Workshop ReviewReview. Review of Workshop 2 ✈ 10 day PBN Airspace Design Workshop ✈ ICAO Doc 9992: PBN in Airspace Design ✈ Plan,
Practice Class Exercise CHINA Enroute 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
Regulatory Plan to support the future ATM system in Australia UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10.
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
TARGETS Enabling NextGen With Advanced Procedure Design Software October 22, 2013.
PBN “SETTING UP A NEW BUT SUCCESSFUL, PBN PROGRAMME”
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
Introduction to PBN Seminar ICAO PBN Implementation 1.
Regional PBN Policy Len Wicks Regional Officer ATM, Asia and Pacific Office International Civil Aviation Organization (ICAO) PBN Seminar 8-10 June 2015,
Performance Based Navigation Aviation Industry Forum 18 November 2009.
Aramco. We will first look at the evolution of navigation approvals. Next we will look at navigation specifications in detail. Finally we will look implementation.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
Optimal Approach procedures
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
International Civil Aviation Organization GNSS SURVEY OUTCOME Secretariat ICAO APAC Office GNSS IMPLEMENTATION SEMINAR 26 MARCH 2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 PBN Performance Based Navigation - Concept & Change - Presented by: Lex Hendriks, EUROCONTROL ICAO Performance Symposium March 2007 Federal Aviation.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, March Performance Based Navigation The Future Erwin Lassooij Manager.
Performance Based Navigation Industry Forum Outcomes and Expectations Presentation to Industry Forum 18 November 2009.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Note: This Performance Based Navigation (PBN) Operational Approval Handbook has been developed by CASA Australia in coordination with ICAO and.
1 Dave VanNess Implementation and Resource Development Coordinator Performance Based Navigation Programme ICAO, Montreal Dave VanNess Implementation and.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
UK Performance-based Navigation (PBN) Implementation Status
Overview of the PBN Airspace Implementation Processes
Vertical, lateral separations based on time / distance
Performance Based Navigation The Future
FAA NAVAID Rationalization / Resiliency Overview
UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10
Modernising the System
PBN OVERSIGHT IN AUSTRALIA
Overview of Continental En-route Navigation Specifications
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Workshop on preparations for ANConf/12 − ASBU methodology
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
Technology Roadmaps H. Sudarshan
longitudinal separations based on time / distance
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
PBN Performance Based Navigation
Performance Based Navigation: Navigation Specifications
Workshop on preparations for ANConf/12 − ASBU methodology
PBN Airspace Concept Workshop
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Oceanic and International Operations
IAOPA 29th IAOPA World Assembly Queenstown, NZ March 2018 PBN and the Benefits for GA.
Technology Roadmaps H. Sudarshan
Oceanic and International Operations
Oceanic and International Operations
PBN and the benefits for GA
Workshop on preparations for ANConf/12 − ASBU methodology
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
RNAV and RNP Strategy in Japan
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Performance Based Navigation –Civil Aviation Authority Actions
PBN ICAO HQ Activities Overview
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

PBN Plan Development Aviation Industry Forum 18 November 2009

Current State  RNAV & RNP Operations in NZ Airspace  RNAV 10 and RNP 4 in Oceanic Airspace  RNAV 1 SIDs and STARs at Auckland, Wellington and Christchurch  RNAV(GNSS) Approach / Departure 57 locations.  16 runway ends.  RNP Queenstown. 18 November 2009 PBN Industry Forum

Long Term Goals (+2018)  Safety (precise trajectory management, CDA)  Predictability  Efficiency (min air distance / optimum aircraft determined profile)  Minimise environmental impact (CO 2 NO X & noise)  Maximise Capacity utilisation (aerodrome & airspace)  High aircraft utilisation (sectors per day)  Schedule reliability  Cost effective investment  Minimised quantity of CTA and optimise design 18 November 2009PBN Industry Forum

Performance Specifications for Phase 3 – Aeroplane & Helicopter  Oceanic – RNP 4 Exclusive?(with CPDLC) in OCA CTA.  Query Class G airspace below OCA CTA??  Domestic Enroute – RNP 1 above F145  Terminal CTA – Advanced RNP 1  Approach Procedures – RNP APCH  Transition Timetable (2018+) 18 November 2009PBN Industry Forum

Performance Specifications for Long Term Goal (1)  Controlled Time of Arrival: sec ETA accuracy for crossing points  Enablers  4DT / AMAN/ DMAN/ CAM II  Continuous Surveillance (updating progress)  CPDLC Comms / Domestic Datalink?  Advanced MET Modelling  Advanced FMS capability 18 November 2009PBN Industry Forum

Performance Specifications Long Term (2)  Optimised air route design  Features  Enroute track centreline spacing  SIDs & STARs de-conflicted  Enablers  Airways PBN routes design work (PBN Implementation Project).  Part November 2009 PBN Industry Forum

Performance Specifications for Phase 1 – Aeroplane & Helicopter  Oceanic – Retain RNAV 10 and RNP 4 for Phase 1.  Domestic Enroute – RNAV 1/2 for all promulgated routes above F145/ 245 in domestic CTA.  Terminal Operations – RNAV 1 for all Terminal routes with Surveillance services  Approach Procedures – Mix of Conventional & RNP APCH and RNP AR APCH  No Change for Helicopter Ops  Transition Timetable ( ) 18 November 2009PBN Industry Forum

Phase 1 – Action Items: Aeroplane & Helicopter  Evaluation of DME/DME coverage to support RNAV 1 all routes (Enroute and TMA)*.  Completing task 1 March 2010 (Airways & CAA)  GNSS IFR AC and associated Part 19 D exemption.  Completing AC task by 1 March 2010 (CAA) Part 19 D Rule plus related Rules changes  Completed by 1 July 2011 (MOT & CAA). *Note VOR /DME updating does not support RNAV 1 specifications. What do aircraft operators need to do? 18 November 2009PBN Industry Forum

Performance Specifications for Phase 2 - Aeroplane  Oceanic – RNP 4 Exclusive?(with CPDLC) in OCA CTA.  Query Class G airspace below OCA CTA??  Domestic Enroute – RNP 2 or 1 above FL145  Domestic Enroute – RNP 2 below FL145  Terminal CTA – Advanced RNP 1 (RF Legs)  Approach Procedures – RNP APCH  Transition away from Conventional approaches.  Transition Timetable (2013 – 2018) 18 November 2009PBN Industry Forum

Phase 2 – Action Items: Aeroplane  Determine drivers for changing performance specifications in OCA.  GNSS Nav, ADS – C Surveillance and CPDLC Comms.  GNSS Primary Navigation  assumes enabling Rules amendments are in place 18 November 2009 PBN Industry Forum What do aircraft operators need to do?

Performance Specifications for Phase 2 - Helicopter  Oceanic – RNP 4 Exclusive?(with CPDLC) in OCA CTA.  Query: Class G airspace below OCA CTA??  Domestic Enroute – RNP 2 (RNP 0.3 Special procedures / routes)  Terminal CTA – Advanced RNP 1  Approach Procedures – RNP APCH  Transition away from Conventional approaches.  Point in Space arrivals and departures  Transition Timetable ( ) 18 November 2009PBN Industry Forum

Phase 2– Action Items Helicopter  Awaiting PBN Manual amendment – due 2011  PANS OPS Design criteria being updated – due November 2009PBN Industry Forum