PBN Plan Development Aviation Industry Forum 18 November 2009
Current State RNAV & RNP Operations in NZ Airspace RNAV 10 and RNP 4 in Oceanic Airspace RNAV 1 SIDs and STARs at Auckland, Wellington and Christchurch RNAV(GNSS) Approach / Departure 57 locations. 16 runway ends. RNP Queenstown. 18 November 2009 PBN Industry Forum
Long Term Goals (+2018) Safety (precise trajectory management, CDA) Predictability Efficiency (min air distance / optimum aircraft determined profile) Minimise environmental impact (CO 2 NO X & noise) Maximise Capacity utilisation (aerodrome & airspace) High aircraft utilisation (sectors per day) Schedule reliability Cost effective investment Minimised quantity of CTA and optimise design 18 November 2009PBN Industry Forum
Performance Specifications for Phase 3 – Aeroplane & Helicopter Oceanic – RNP 4 Exclusive?(with CPDLC) in OCA CTA. Query Class G airspace below OCA CTA?? Domestic Enroute – RNP 1 above F145 Terminal CTA – Advanced RNP 1 Approach Procedures – RNP APCH Transition Timetable (2018+) 18 November 2009PBN Industry Forum
Performance Specifications for Long Term Goal (1) Controlled Time of Arrival: sec ETA accuracy for crossing points Enablers 4DT / AMAN/ DMAN/ CAM II Continuous Surveillance (updating progress) CPDLC Comms / Domestic Datalink? Advanced MET Modelling Advanced FMS capability 18 November 2009PBN Industry Forum
Performance Specifications Long Term (2) Optimised air route design Features Enroute track centreline spacing SIDs & STARs de-conflicted Enablers Airways PBN routes design work (PBN Implementation Project). Part November 2009 PBN Industry Forum
Performance Specifications for Phase 1 – Aeroplane & Helicopter Oceanic – Retain RNAV 10 and RNP 4 for Phase 1. Domestic Enroute – RNAV 1/2 for all promulgated routes above F145/ 245 in domestic CTA. Terminal Operations – RNAV 1 for all Terminal routes with Surveillance services Approach Procedures – Mix of Conventional & RNP APCH and RNP AR APCH No Change for Helicopter Ops Transition Timetable ( ) 18 November 2009PBN Industry Forum
Phase 1 – Action Items: Aeroplane & Helicopter Evaluation of DME/DME coverage to support RNAV 1 all routes (Enroute and TMA)*. Completing task 1 March 2010 (Airways & CAA) GNSS IFR AC and associated Part 19 D exemption. Completing AC task by 1 March 2010 (CAA) Part 19 D Rule plus related Rules changes Completed by 1 July 2011 (MOT & CAA). *Note VOR /DME updating does not support RNAV 1 specifications. What do aircraft operators need to do? 18 November 2009PBN Industry Forum
Performance Specifications for Phase 2 - Aeroplane Oceanic – RNP 4 Exclusive?(with CPDLC) in OCA CTA. Query Class G airspace below OCA CTA?? Domestic Enroute – RNP 2 or 1 above FL145 Domestic Enroute – RNP 2 below FL145 Terminal CTA – Advanced RNP 1 (RF Legs) Approach Procedures – RNP APCH Transition away from Conventional approaches. Transition Timetable (2013 – 2018) 18 November 2009PBN Industry Forum
Phase 2 – Action Items: Aeroplane Determine drivers for changing performance specifications in OCA. GNSS Nav, ADS – C Surveillance and CPDLC Comms. GNSS Primary Navigation assumes enabling Rules amendments are in place 18 November 2009 PBN Industry Forum What do aircraft operators need to do?
Performance Specifications for Phase 2 - Helicopter Oceanic – RNP 4 Exclusive?(with CPDLC) in OCA CTA. Query: Class G airspace below OCA CTA?? Domestic Enroute – RNP 2 (RNP 0.3 Special procedures / routes) Terminal CTA – Advanced RNP 1 Approach Procedures – RNP APCH Transition away from Conventional approaches. Point in Space arrivals and departures Transition Timetable ( ) 18 November 2009PBN Industry Forum
Phase 2– Action Items Helicopter Awaiting PBN Manual amendment – due 2011 PANS OPS Design criteria being updated – due November 2009PBN Industry Forum