‘Characterization of a Non-linear Kicker at BESSY II’ O. Dressler, P. Kuske Advanced Low Emittance Rings Technology Workshop, Valencia, Spain, 5 - 6 May.

Slides:



Advertisements
Similar presentations
Injection in Rings with Small Dynamic Aperture - Lessons Learned at BESSY II A. Jankowiak, P. Kuske.
Advertisements

The Rare RI Ring Facility at RIKEN RI Beam Factory M. Wakasugi, and Rare RI Ring Collaborators RIKEN, Nishina Center, Japan ARIS2014.
USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.
Injection Session – Close-out Workshop on Accelerator R&D for USRs Working Group J.H. Chen (IHEP), O. Dressler (Helmholtz ZB), R. Hettel (SLAC), Y. Jiao.
SESAME – TAC 2012: M. Attal Maher Attal SESAME Booster Characterization.
Method of beam extraction from a synchrotron by the instrumentality of multilayer Cu-Fe shield Bondarenko Alexey.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Electromagnetism Topic 12.2 Alternating Current. Rotating Coils Most of our electricity comes from huge generators in power stations. Most of our electricity.
Proton beams for the East Area The beams and their slow extraction By : Rende Steerenberg PS/OP.
General electric flux definition
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Scopes  An oscilloscope is a visual voltmeter.  An oscilloscope converts electrical signals into a visual image representing voltage changes over a.
Chapter 31A - Electromagnetic Induction
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
, EUROnu Meeting, Strasbourg J. Pasternak Status and recent progress on muon IDS-FFAG J. Pasternak, Imperial College, London / RAL STFC Work.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
‘Single Non-linear Kicker for Top-Up Injection at BESSY II’ O. Dressler, P. Kuske - Low Emittance Ring 2013 Workshop, Oxford, UK, July
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Double RF system at IUCF Shaoheng Wang 06/15/04. Contents 1.Introduction of Double RF System 2.Phase modulation  Single cavity case  Double cavity case.
Chapter 31 Faraday’s Law.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Frequency Map Analysis Workshop 4/2/2004 Peter Kuske Refinements of the non-linear lattice model for the BESSY storage ring P. Kuske Linear Lattice My.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
Design options for emittance measurement systems for the CLIC RTML R Apsimon.
Status of ATF Fast Kicker Experiment
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
SPring-8 upgrade : a fast kicker system for beam injection Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
8.1 Induced Emf p. 300 Magnetism, EMF, and Electric Current An Englishman, Michael Faraday ( ) and an American, Joseph Henry ( ), working.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
‘Development and Commissioning of a Single Non-linear Kicker Magnet System for the BESSY II Storage Ring Injection’ O. Dressler, P. Kuske - USR Workshop,
Plans for Diamond-II ESLSXX Workshop, Bessy II, 19 November 2012 R. Bartolini Diamond Light Source and John Adams Institute for Accelerator Science University.
Investigation of Injection Schemes for SLS 2.0
Off-axis injection lattice design studies of HEPS storage ring
TPS pulse magnet measurement
LINAC4 ADVISORY COMMITTEE
A.Lachaize CNRS/IN2P3 IPN Orsay
Space charge studies at the SPS
Large Booster and Collider Ring
Proposal for a Transparent Off-Axis Injection Scheme for BESSY II
First Look at Nonlinear Dynamics in the Electron Collider Ring
Lost muons and radial B-field
Junji Urakawa (KEK) for ATF International Collaboration
FCC-hh injection group 7
Damping Ring Kicker Tests at AØ
Strip-line Kicker R&D at KEK-ATF
Lecture 10 Biot-Savart’s Law.
Objectives: After completing this module, you should be able to:
Collider Ring Optics & Related Issues
Multi-Turn Extraction for PS2 Preliminary considerations
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Objectives: After completing this module, you should be able to:
Feedforward correction to injection bump error in the SPring-8
Pulsed Sextupole Injection for Beijing Advanced Photon Source
Chapter 31 Faraday’s Law 31.1 Faraday’s Law of Induction
Presentation transcript:

‘Characterization of a Non-linear Kicker at BESSY II’ O. Dressler, P. Kuske Advanced Low Emittance Rings Technology Workshop, Valencia, Spain, May 2014

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Content Non-conventional Injection vs. 4 Kicker Bump, Undisturbed Injection with Vanishing On-Axis Field, Characterization of Kicker System in BESSY II Storage Ring, Field Measurements of Non-linear Kicker Magnet in Laboratory, Summary and Outlook. 2

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske 3 Non-conventional Injection vs. 4 Kicker Bump *Phys. Rev. ST Accel. Beams 10, , ‘New injection scheme using a pulsed quadrupole magnet in electron storage rings’, K. Harada, Y. Kobayashi, T. Miyajima, S. Nagahashi, Photon Factory, Non-conventional injection with one single non-linear kicker Application of the two injection septa and one single pulsed non-linear kicker magnet outside the injection straight for special injection procedure in top-up-mode *. Conventional layout of BESSY II Storage Ring Injection Two injection septa and four injection kickers in one (long) straight section, were two kicker magnets are powered in series by one pulse power supply respectively. Oscillation from injection point to non-linear kicker

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Single Kicker Injection with Vanishing On-Axis Field 4 wires with 200 A each In-vacuum stripline-type design P. Kuske, et al, XX1 ESLS Workshop, Karlsruhe, 21-22, November

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Measurement of Injection Efficiency Variation of the horizontal injection angle and kicker delay 5 with S. Leemann, MAX IV Laboratory Efficiency up to 60% with chosen optics and kicking the injected beam at later turns also. Magnet works as expected.

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Four Kicker Coils Field Distribution in Magnet and its Symmetry 2D Magnet ModelSchematics of Electrical Connections 6 4 coils in series on 1 transducer Specification B y max. ≥ 25 mT, depiction in [G], (1 G = T) B y max. at y = 0 and x = +12 mm B y min. at y = 0 and x = -12 mm B x = 0 along y = 0

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske 7 Sectional View 3D Magnet Model Calculation of eddy currents in neighboring surfaces of simple geometry by P. Lebasque, SOLEIL

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske 8 Excitation Pulse Length Time Scale for BESSY II Storage Ring with Circumference of 240 m Gap 700ns Electrons from booster 100ns Gap 700ns Recirculating beam 01.5µs Assume possible pulse current duration (hence pulsed B-field duration) up to 1.5 µs. Set up the pulse power supply for a pulse length of 1.3 µs for characterization measurements. Because of the discrete components and limiting 15kV charging voltage, the maximum current was 300 A, approx. Î = 200 A were used for measurements. Measured pulse curve on pulse power supply CT1. Pulser / Transducer / Magnet (previously shown)

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske 9 Realistic Network of Pulsed Power Circuit Simplified pulser circuit  Pulser network without transducer to concentrate on magnet properties only. Simplified pulser circuit plus secondary loop caused by magnet structure Remember: frame support structure  Possible current path, but not under suspicion anymore since no significant asymmetries are noticeable. Effects of eddy currents in to coils adjacent metallic surfaces are investigated because of their excitation current independent, much longer time constant. L m - Magnet inductance

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Direct Field Measurements Inside Kicker Magnet Methodology: Small single bunch current was injected through the NL-kicker onto a screen monitor which is located 5 m behind the magnet, CCD-camera and image analysis delivers beam position and beam size, Shift of the beam was monitored when the kicker was fired, Delay between bunch arrival time and the kicker pulse was varied, Vary horizontal and vertical position in the kicker, But, measurement uncertainties in the horizontal plane due to 9 pulsed extraction and injection magnets in injector chain. 10

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Temporal variation of the field at about dx~-11 mm and dy~2mm Temporal Field Distribution (1) Off-axis beam experiences fields dominated by eddy currents at later times. 11 with S. Leemann, MAX IV Laboratory

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Temporal variation of the field at about dx~-11 mm and dy~2mm For red delay variation of the beam position inside the kicker. Temporal Field Distribution (2) 12 with S. Leemann, MAX IV Laboratory

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Spatial Field Distribution Inside Kicker Magnet 13 with S. Leemann, MAX IV Laboratory Flat, zero horizontal and vertical fields close to zero (location of the stored beam), ‘Flat’ field in the mid-plane ~11 mm off-axis (position of the injected beam), The off-axis vertical kick contains large eddy current field contributions (polarity change).

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Methodology: Short bunch train, small beam current, chromaticities set to zero, Horizontal and vertical closed orbit bumps inside the kicker magnet, Kicker fired and dipole motion detected turn-by-turn with Libera-Brilliance electronics, FFT of the data delivers amplitude of beam motion at the tunes: sub  m-resolution achieved, Measurements performed as a function of the kicker timing (for short kicker pulses only). Measurement of Small Fields 14

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Kicker-Induced Beam Motion (1) Libera-Brilliance BPM-Electronics + MatLab analysis of turn-by-turn data. 15

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske 16 Libera-Brilliance BPM-Electronics + MatLab analysis of turn-by-turn data. Kicker-Induced Beam Motion (2)

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Top and bottom coils powered serially in pairs – poor adjustment of current pulses (a few percent different). Spatial Variation of the Fields (1)

18 Spatial Variation of the Fields (2) Top and bottom coils powered serially in pairs – adjustment of current pulses better (as good as possible identical).

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Spatial Variation of the Fields (3) 19 Top and bottom coils powered in series – the 4 currents are identical.

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Line Scan Close to Smallest Orbit Perturbations Vertical perturbations: can be made vanishingly small in the vertical plane: < 1  m, Horizontal perturbations: ~3  m is the minimum, in a quite small area, Linear dependence could be related to a quadrupolar field component. 20

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Procedure for Magnetic Field Measurements: Measurement of in long straight coil induced voltage v(t) at succeeding horizontal positions. Instantaneous calculation of magnetic flux φ (t) out of voltage trace with the storage oscilloscope. Readout of max. value Ф max from oscilloscope for actual position, division by known coil area. Plot points into diagram. Laboratory Set-up for Magnetic Field Measurements 21 Typical scope picture of B-field measurement Direction of vertical B-field measurement, Magnet rotated by 90° Voltage signal in pick-up coil [V] Magnetic flux [Φ] Pulse current [V~A]

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske 22 Magnetic Field Measurement vs. ANSYS Calculation Problem: Measurements of B-fields in small bores. Reliability and precision of measurement, Positioning of pick-up coil inside gap, Integrating effect caused by probe width / size, Coupling capacitance of field probe to structure, Hazardous HV near measurement equipment, Discontinuous transition of voltage on probe, etc.

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske 23 Proposal: Automatized Magnetic Field Mapping Example: B-field measurements on septum magnet Normalized B y -field map of septum magnet O. Dressler, M.v. Hartrott, N. Hauge, ‘Determination of the Magnetic Characteristics in the Injection Septum for the MLS’, proceedings of the IPAC10, p. 1773, Kyoto, Japan, Proposed set-up for automatized B-field measurements on NL-Kicker Technical details: National Instruments technology and Labview programming: PXI NI-1042Q or PXIe NI-1062 chassis, Embedded controller PXI NI-8108 or PXIe NI-8196, Oscilloscope card PXI NI-5122, Two stepper motors and control cards, Measuring table and x/y supports, Pick-up coils according to measurement task (long coil 1 winding, short coil x windings), Labview program for measurement control and automatic measurement analysis. y x

ALERT Workshop, May 2014, Valencia, SpainO. Dressler / P. Kuske Summary and Outlook 24 Kicker magnet and pulsed PS work fine:  No thermal problems and kicker serves as back-up solution for BESSY II, Injection Efficiency:  All kicker (interconnection) configurations have shown 80 % efficiency; without much optimization, could be further improved, (80% with  xinj =  xkicker, 60% with  xinj =2·  xkicker ), Orbit perturbations: < 1  m vertically and ~3  m horizontally, Field distributions:  Were determined experimentally with reduced pulse duration, Investigation of impact of eddy currents will continue, And we will continue our collaboration with