Electrical plant. Traditional wall (Red hollow brick) Plasterboard wall Rapid installation flush mounting solution FINAL EFFECT Traditional wall (Red.

Slides:



Advertisements
Similar presentations
Electric Strike Selection and Installation By: Michael D. Vorpahl, CRL Capital Lock, Inc Regent St. Madison, WI Phone: Fax:
Advertisements

Thule Smart RV™ Pod Kit Installation For Smooth-Sided Fiberglass RVs
COST EFFECTIVE MASS HOUSING TECHNOLOGY
Lather Lathers assemble and install the framework for gypsum materials in buildings. These materials include drywall and plaster.
Steps Toward Decent, Affordable Housing Habitat for Humanity in Amecameca, Mexico ©, 2006 © Scott Moore, 2006.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
INTERNAL PLASTERING.
Gable Roof BCGCA3007B.
Wet Area Linings Part 1 - Linings M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007 M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007.
NGfL CYMRU GCaD STRUCTURAL TIMBER FRAMING.
QUINN TRUSS OPEN WEB JOIST SYSTEM TECHNICAL DETAILS.
Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, Copying permitted for purchasing institution.
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
QuickWalls® strong. fast. simple.
Tools of the Trade Common Tools used with Master Wall Systems Presented by With thanks to.
Choosing the Right Siding When selecting siding, there are six basic issues to consider: 1. Water Resistance. Water-resistant types of siding will have.
The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Gable Roof BCGCA3007B.
Cities of Vesuvius Materials and Construction in Pompeii and Herculaneum.
‘Market Leaders in Rendered Building Products’ The Poly-Tek Cabin.
Fiber Reinforced Cement Board Decorative Panels For Exterior / Interior Cladding, Rainscreens, Countertops, and much more!
Traditional Fixtures & Fittings 1 J. Byrne Fixtures & Fittings J. Byrne
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
By: Mia Fitz. Construction workers do a lot of stuff. They use a saw to cut wood. Construction workers use a lot of bricks to build. They use a lot of.
Site practice notes.
QuickWalls® strong. fast. simple. *Light Weight *Insulated
1 SURFACE FINISHES, DOORS AND WINDOWS. SURFACE FINISHES OR PLASTERING Process of covering rough walls and uneven surfaces in the construction of houses.
Graphic st aidans high AUXILIARY PLAN.
I’m not going to claim that the Camera Obscura was a Tudor invention, there has been mention of the technology as long ago as 500 years by the Greeks,
QuickWalls® strong. fast. simple. *Light Weight *Insulated
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Interior Paneling Installation Copyright © Texas Education Agency, All rights reserved.
Auxiliary Plan Two views of a coat hook are shown below. The coat hook is made from Ø40mm aluminium bar and is fixed to the wall through a Ø4mm hole.
1 Planning Change. Painting a Room Select paint 10 days Sand and clean walls 3 days Buy painting supplies 1 day Buy paint 1 day 1 st coat 1 day 2 nd coat.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Certificate number: FS453/02 Application FS21 Firestop Panel is used to firestop mechanical and electrical services where they pass through fire rated.
An Introduction to Cathodic Protection. The Problem Water and de-icing salts along the splash zone of the abutment walls to this roadbridge have caused.
by: Maryam Musab Amine We use bricks and tiles to build a house. We use bricks to build the walls. We use tiles to build the floors. The bricks and tiles.
WORKING CASTS AND DIE SYSTEMS
First Wall Panel - Overview
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
appseal® (Cement based Polymer Modified brick Masonry Coating)
Mold base production solutions
CreaZen® Decorative Railing System
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. f. Identify various types of mechanical anchors.
Craft Occupations in the Construction Industry
Finishing Dry Lining – Direct Bond
Product Model Concrete Screws
Superstrut SilverGalv (EG)
Metal Framing Kindorf –PL004 SuperStrut –PL005 Cable Tray- PL039
Building a Nightstand Woods 1 Final Project Step #1
DENTSPLY International
Building Construction I
STRUCTURAL TIMBER FRAMING
PRODUCT ARGUMENTATION
Cardboard Creature.
Solo Music Gear GFK-10 Kit Assembly
Traditional Fixtures & Fittings
Types of rivets Solid Rivets Snap head rivet
Practice Essay.
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
Graphic Communication
Setting a new standard in energy efficiency
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Aluminium Profile System
Publisher Tutorial.
Presentation transcript:

Electrical plant

Traditional wall (Red hollow brick) Plasterboard wall Rapid installation flush mounting solution FINAL EFFECT Traditional wall (Red hollow brick) Plasterboard wall TOTAL flush mounting solution with precision installation FINAL EFFECT Flush mounting solutions

SFM3 Solution for Traditional wall (Red hollow brick) 1 – Make a hole in the wall and fix the box using the builder’s level provided 2 - Apply coarse mortar (DO NOT apply the frame during this operation) 3 - Finishing (DO NOT apply the frame during this operation) 4 – Fix the frame to the box, paint the wall and the frame only after installation 5 - Apply the finish plate Rapid installation flush mounting solution

SFM3CG Solution for plasterboard wall 1 – Apply the template to the wall and use the builder’s level to mark the outline 2 – Cut hole 3 – After inserting the box apply a skim coat to the wall (DO NOT apply the frame during this operation) 4 – Fix the frame to the box, paint the wall and the frame only after installation 5 - Apply the finish plate Rapid installation flush mounting solution

Using the rapid installation solution you will have the plate flush with the wall surrounded by the narrow paintable panel covering any imperfections between the edge of the box and the cement Rapid installation flush mounting solution

TOTAL flush mounting solution with precision installation SFM3/HP Solution for traditional wall (Red hollow brick) 1 – Make a hole and fix the box using the builder’s level provided 2 – Apply the coarse mortar 3 – Apply the finish coat 5 – Apply the finish plate 4 – Paint the wall

Solution for plasterboard wall 1 – Apply the template to the wall use the builder’s level to mark the outline 2 – Cut hole 3 – After inserting the box apply the skim coat to the wall TOTAL flush mounting solution with precision installation SFM3CG/HP 5 – Apply the finish plate 4 – Paint the wall

Using the TOTAL flush mounting solution with precision installation you will have the plate flush with the wall completely embedded without a cover frame TOTAL flush mounting solution with precision installation

Electrical plant solutions