EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: July 12, 2010.

Slides:



Advertisements
Similar presentations
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Advertisements

January 23, El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.
Public Hearing June 4, Case: CDR Project: Winegard Road South PD LUP - Substantial Change Applicant: Hugh M. Lokey, P.E., Hugh M. Lokey.
Town of Southbury Department of Public Works 2014.
State of Morrisville Mayor Mark Stohlman July 17, 2014.
New Hope Creek Below Highway Executive Summary The Durham County Inventory of Important Natural Areas, Plants and Wildlife North Carolina Natural.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
G REAT S MOKY M OUNTAINS N ATIONAL P ARK The USA,Tennessee.
Summary of Blocked Area. Park Access and Park Area (East) Legal Description: MONTGOMERY TRACE 02, RESERVE D, ACRES Acreage: Cross Reference:
Cherokee Bend Phase II, Roadway Pavement: Atoka Trail Request to Complete Roadway Pavement of Atoka Trail to Live Oak Church Road Shoal Lake Homeowners.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Site Pictures for IFB# 09-08/21/14 Concrete Services for Greenville County.
Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010.
Pipeline Possibilities by Judith and R. Doug Pew.
PUBLIC WORKS DEPARTMENT RED LIGHT CAMERA UPDATE FY Budget Worksession July 12, 2011.
Property Surveys  Legal Description  Definite boundaries  Must be clear – only one point  Must not change with time  Courts assume:  First in time.
ROADWAY LIGHTING PROGRAM Public Works Department February 10, 2015.
PWC Quarterly Transportation Report DATA Roundtable June 17, 2015 Rick Canizales – Chief Department of Transportation.
Chapter 2 Vocabulary. Ways of moving people and goods.
CITY COUNCIL GOALS & OBJECTIVES. TOP PRIORITY Street Valley Gutters 33 installed by Public Works 35 installed by contractor Pipe Replacement Program.
Elk & Nature Tourism in North Central Pennsylvania.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: October 7, 2009.
Community Development Department Construction Phase.
Vocabulary Regions. transportation Ways of moving people and goods.
Updated 2011 & New 2012 Landscape Projects Grand Haven.
Topography of Pennsylvania. 5 major regions of PA.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
Project IDAgencyTitleRelevant Project ComponentCompletion Date LAE0332City of Long BeachLong Beach Park & Ride LotPRL with 400 parking spacesJune, 2014.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: OCTOBER 10, 2012.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: JULY 8, 2011.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: October 7, 2010.
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
BUDGET WORKSHOP FY13 April 4, City of Hendersonville Budget Workshop – April 4, 2012 GOALS and OBJECTIVES for 2013 To present a balanced budget.
Landforms and Water Features They’re all around us!
NY-NJ Trail Conference West Hudson North accomplishments for 2015 Black Rock Forest Minnewaska State Park Preserve Schunemunk State Park Storm King State.
Where is Maryland located? Maryland is located along the Atlantic coast of the United States. It is near the center of those states which border on the.
1 Wallace Creek, USGS aerial view, about 1990 USGS Photo.
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: July 10, 2006.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
HB 277 Regional Transportation Sales Tax Preliminary Project List Presentation Mayor and City Council Work Session March 1, 2011.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Monday-Thursday Route Participants Agusta Ct Agusta Ct Baltusrol Drive Baltusrol Drive Barnes Lane Barnes Lane Beverly Road Beverly Road Brae Burn Drive.
TxDOT Street Projects Eldorado Parkway Widening FM423 North Widening Oak Grove Pkwy (FM 720) US 380 Widening (from Denton to Collin County line)
$21.1M $9.2M $387K $11.5M.
Preliminary Estimated Cost
Chapter 2 Vocabulary.
$6,474 Per Ac Acres ~ Between Trenton & Randolph
Connecting the City: Building the Dallas Trail Network
North Carolina: Land of Contrasts Chapter 1 The Lay of the Land Study Presentation ©2007 Clairmont Press.
Item 8A Authorize staff to establish a new standard operating procedure (SOP) with the authority to waive the sewer tap fee for an incentive period of.
FY 2011 – FY 2015 Transportation Improvement Program (TIP)
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Board of County Commissioners
BUDGET DEVELOPMENT FY TOWN OF WAXHAW BOARD RETREAT January 19, 2017
FIRE ALARM / FIRE SPRINKLER SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
10 TREK TRAILS North Walk-in-Water Creek North Walk-in-Water Creek
CHEROKEE PARK TRAIL MAP 6 Miles / 1100 ft Elevation change
Street Address- Lake North
SUNCREEK ESTATES Section 1
WESLEYAN P-28-1 MAJOR MAINTENANCE FY WASHINGTON STREET
URBAN TRAIL PROJECT UPDATES
WESLEYAN P-3-1 MAJOR MAINTENANCE FY 15 FOSS 1 – 18 FOSS HILL DRIVE
Harbour Island Force Main Replacement
Monterey County Project Report for Measure X Expenditures
WESLEYAN P-18-1 MAJOR MAINTENANCE FY COURT STREET
Presentation transcript:

EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: July 12, 2010

FY 2010 YEAR TO DATE TOTALS MANHOLE INSPECTIONS TAB 1 MANHOLE REPAIRS TAB 2 TV INSPECTION TAB 3 ROOT CONTROL TAB 4 HYDRAULIC CLEANING TAB 5 EASEMENT CLEARING TAB 6 AERIAL STREAM CROSSING INSPECTIONS TAB 7 COMBINED TOTALS BY FISCAL YEAR TAB 8

MANHOLE INSPECTIONS INFLOW/INFILTRATION SECTION2,038 SYSTEM MAINTENANCE 9 TAB 1

MANHOLE REPAIRS CONTRACTED (RAISED) 868 GENERAL MAINTENANCE 35 TAB 2

TV INSPECTION INFLOW/INFILTRATION SECTION 63,326’ SYSTEM MAINTENANCE 72,429’ TAB 3

ROOT CONTROL PHASE 1 90,226’ Ashgrove Lane Bayberry Drive Burfordi Drive Fern Valley Drive Killarny Drive Milford Chase S/D Pair Road Shadow Ridge Drive Sir Galahad Drive PHASE 2 TAB 4

PHASE 3 – April – 108,548 feet Aimee Lane Ashgrove Lane Ashley Oak Drive Austell Road Benton Way Bolingbrook Drive Bonnie Court Bramblewood Way Brandon Hall Way Brookhill Circle Chase Court Chondra Drive Cochran Lake Road Creek Court Creek Hollow Drive Creek Hollow Way Edgefield Court Edgefield Drive Hampton Court Heritage Ridge Holliglen Drive Hurt Road Josephine Court Kinridge Road Kinridge Trail Lance Court Lance Street Milford Chase Milford Court Milford Creek Milford Lane Milford Overlook Milford Place Milford Trail Mill Creek Court Mountain Hollow Old Tennessee Road Orange Acres Trace Pebble Hill Court Pebble Hill Drive Sandy Plains Road Shadyside Road Silverchase Circle Silverchase Drive Slopewood Bend Smithwood Drive Sparrow Wood Lance Squire Drive Summerford Court Summerford Drive Summerford Way Sweetbay Lane Tallwood Circle Thornwall Drive Timber Hollow Court Timber Hollow Way Tradewind Court Twin Court Lane Velvet Creek Court Velvet Creek Lane Velvet Creek Trail Velvet Creek Way Wellborn Court Wellborn Way Whitfield Drive Winfair Place Winterberry Circle Woodmore Drive Woodrun Trail Wynn Drive

PHASE 3 – May – 63,500 feet Arley Court Branchview Drive Brookhill Circle Caladium Drive Clairbourne Court Comberly Place Creek Haven Drive Crossfield Place Dior Drive Dunnigton Drive Fairport Way First Drive Foxwood Court Fuschia Drive Glenridge Court Grove Park Court Halbra Drive Hanover Court Hasty Road Hill Road Kinridge Court Kinridge Road Kinridge Trail Meadowview Drive Mozelle Drive Parnell Road Pinkney Drive Plymouth Lane Poinsetta Drive Renford Point Romans Drive Rugby Road Running Fox Court Running Fox Drive San Andra Drive Sandy Plains Road Shamans Drive Shamans Walk Spaulding Drive Starlight Drive Toumey Drive Tree Top Bend Tree Top Court Trophy Drive Winfair Place Wingard Drive Winslow Court Wood Creek Drive Wynn Drive

PHASE 3 – June – 41,002 feet Arrowhead Trail Allgood Road Bailey Creek Branchview Drive Brentwood Lane Brentwood Drive Carefree Circle Center Cross Pass Coleman Street Courts Drive Donald Drive Emerald Glen Drive Emerald Ridge Glen Echo Way Glenridge Drive Holcomb Lake Road Indian Head Court Kinridge Court Kinridge Place Court Kristen Mill Way Leesburg Court Lightfoot Circle Merrifield Lane Monarch Court Monarch Drive Newberry Court Oakmoor Place Park Boulevard Piedmont Road Pointsetta Drive Prestige Valley Drive Rugby Road San Andra Drive Sheffield Parkway Smithwood Road Starlight Drive Tappahannock Trail Trophy Drive Ventana Crossing Ventana Path Ventana Ridge Wynn Drive

HYDRAULIC CLEANING GENERAL MAINTENANCE 139,385’ (COUNTY WIDE) TAB 5

EASEMENT CLEARING Quarterly Total YTD Quarter 1608,541’608,541’ Quarter 2391,033’999,574’ Quarter 3876,706’1,876,280’ Quarter 4 TAB 6

AERIAL STREAM CROSSING INSPECTIONS INFLOW/INFILTRATION SECTION 1,543 SYSTEM MAINTENANCE 4 TAB 7

Totals by Fiscal Year Linear Feet TAB 8

Each Totals by Fiscal Year TAB 8

Totals by Fiscal Year Tab 8 Each