Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.

Slides:



Advertisements
Similar presentations
Update on FCPS Construction/Renovation Projects June 2009.
Advertisements

Update on FCPS Construction/Renovation Projects July 2009.
Update on FCPS Construction/Renovation Projects September 2009.
Update on FCPS Construction/Renovation Projects May 2009.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Update on FCPS Construction/Renovation Projects April 2009.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Newark CSD Phase II Capital Improvement Project Board of Education Report August 2013.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Arlington Elementary – Renovation Architect: RossTarrant Architects General Contractor: W/S Construction Substantial Completion Date:August, 2010 Contract.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Steel Bar Joists Tyler Wells. Academy Sports Building The building we chose is Academy Sports. It is located in Opelika Alabama. Academy is a sporting.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
© OnCourse Learning. All Rights Reserved. Basic House Construction Learning Objectives  List the primary styles of residential architecture  Describe.
Reading Structural Drawings
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
Update on FCPS Construction/Renovation Projects March 2009.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4,
Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high”
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
South Halls: Ewing-Cross Renovation AE Senior Thesis: Tech. 1 Quaid Spearing CM Option September 16, 2013.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
October 19, 2011 Construction Progress Report. Construction Progress Report – October 19, 2011 Contract sum to date:$ 162,736,722* Total completed to.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Miller Driscoll Building Committee Update Tuesday, January 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations Miller-Driscoll.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
Fun Facts: James M. Bennett High School
Pearl Condominiums Philadelphia, PA
Bond Oversight Committee
How Completed Interiors Are Achieved: Designing & Building
School Improvement Bond Projects
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Construction Documents
Dr. Joseph Meloche Superintendent of Schools Mrs
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Value of contract: Length of contract: Contract start date:
In-Class Scheduling Exercise
Minuteman Vocational Technical Regional High School Progress
Masonry Bearing Walls.
Minuteman Vocational Technical Regional High School Progress
© OnCourse Learning.
Eaton MEDC, Sutton-In-Ashfield
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract Sum:$11,182,000 Total Project Cost:$13,682,854 Change Orders to Date (1):$2,874 Current Phase:1, 1a, 1b (On Schedule) Estimated Completion:24% September 2009

Leestown Middle – Renovation Rendering of Final Façade September 2009

Leestown Middle – Renovation Work Completed in Last 30 Days: Phase 1 A, B & C demolition efforts on-going. Phase 1B Asbestos abatement on-going. Phase 1 A, B & C hollow metal door frames. Phase 1 A & B interior masonry wall erection on-going. Phase 1 A & B interior masonry in-fill & patch work started. Phase 1 A, B & C Erection of Structural steel started. Phase 1 A, B & C setting of bar joists started. Court yard seating walls and concrete paving are on-going. Foundations for the courtyard addition are on-going. Metal stud walls in Administration Suite are complete. Cafeteria soffits are on-going. Above ceiling ductwork has started in the Cafeteria. September 2009

Leestown Middle – Renovation Current Work Effort (September): General demolition in Phases 1A, B & C will continue. Plumbing, HVAC, electrical demolition on-going. Structural steel and bar joists will continue to be erected Metal roof decking to start. Electrical and Plumbing rough-ins on-going. Masonry load bearing masonry at Kitchen to be completed. Phase 1C (Courtyard addition) foundation to be completed. Phase 1C slab to start. Erection of two story Fire Wall to begin. Installation of hollow metal door frames on-going in Phase 1B & C. Phase 1A & B, Work at existing built-up roofs to start. Installation of new built-up roof at Phase C. September 2009

Leestown Middle – Renovation New Addition at Kitchen Steel Erection at Courtyard Addition September 2009 Seating Wall at Courtyard New Addition Kitchen Serving Line