1 Portobello & Craigmillar Environment Forum February 2013 East Neighbourhood Roads Services.

Slides:



Advertisements
Similar presentations
First Fruits Meeting 27 th February 2014 TERENURE ENVIRONMENTAL IMPROVEMENT PLAN.
Advertisements

CITY CENTRE Neighbourhood Environmental Projects Overview Environment Forum 17 th December 2013.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Environment Department Management Branch Pat Smyth Assistant Highway Engineer Hampshire Highways East Highway Maintenance.
1 East Neighbourhood Environment Forum March 2013 East Neighbourhood Parks and Greenspaces.
Birr Public Realm Work achieved to date February
The Christie NHS Foundation Trust Travel and car parking strategy Neighbourhood Forum - Update 19 th February 2013 Bob Higginbotham, Chris Noble and Will.
The Christie NHS Foundation Trust Transport strategy Neighbourhood Forum - Update 28 th October 2014 Bob Higginbotham, Rosie Gill and Will Blair.
MODULE 2 By Vit Troyan. TRANSPORTATION: Right-of-Way Traffic Operations Street Maintenance One-Call Centers.
Cally Plan Update Team Cally Ward Partnership September 2014.
Scottish Housing Best Value Network Fourth Floor, 125 Princes Street, Edinburgh EH2 4AD Scottish Housing Best Value Network is a registered charitable.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
Phil Noble Senior Professional Officer Strategic Planning (Transport) 20 August 2012 Active Travel Action Plan Briefing.
Study Area What is this consultation about? This consultation has been prepared to seek your views and provide you with information about proposed transport.
IMPROVING COAST WALK TRAIL Friends of Coast Walk Vision-Mission-Actions to Date.
1 Friday Hill Tenant Management Organisation Abbreviated Annual and Financial Reports 1 st April 2006 to 31 st March 2007.
Walking and cycling routes Local facilities Streets Open space Public transport Supporting infrastructure Creating ‘commons’ Local planning.
The Christie NHS Foundation Trust Transport strategy Neighbourhood Forum - Update 27 th January 2015 Bob Higginbotham, Chris Noble and Will Blair.
The Christie NHS Foundation Trust Travel and car parking strategy Neighbourhood Forum - Update 20 th August 2013 Bob Higginbotham, Chris Noble and Will.
Waste Select Committee 6 June Introduction 1 Waste Select Committee Report - Recycling In Norwich: 25 th January Recommendations endorsed.
Highways and Engineering Savings and Efficiencies Review November 2010.
Sidewalks February 13,  A large number of sidewalks in need of repair ◦ Damage from right-of-way trees = City responsibility ◦ Damage from property.
Local Strategies and How to Influence them Gillian McDonough Chief officer, Sunderland CVS 3 rd November 2009.
Communities Directorate Environment Division Winchester Town Forum Meeting 9 th March 2006 ‘ Managing the Environment in Winchester’ Robert Heathcock Head.
Managing Council’s Road Network for Better Outcomes Storm Damage Experience Ian de Bruyne Manager Program Planning & Delivery IPWEA Regional Forum 15 May.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
2012 CITY OF MIDDLETON SATISFACTION SURVEY WORKING DRAFT - PROPOSAL.
Hertfordshire Highways Overview & Scrutiny Committee Briefing 24 November 2011 Danny Kyan St Albans District Manager.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
ANDREW RICHARDSON NEIGHBOURHOOD SERVICES MANAGER DIRECT RESPONSIBILITY FOR LEYLAND EAST/WEST.
59 ½ Southwark Street London SE1 0AL (UK) ++44 (0) / Land Use Planning and Mobility Management Securing travel.
Highways and Engineering Consultation Presentation.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
A Better Lee Green & Network for Clean Air Citizens Science Pollution Study.
Neighbourhood Planning. Frequently Asked Questions What is Neighbourhood Planning? What can a Neighbourhood Plan do – and what can it not do? What are.
STORM IMPACT THE CLARE EXPERIENCE. Tom Tiernan SE, Clare Co Co Cyril Feeney SEE, Clare Co Co.
City Council Workshop Presentation July 26, 2011.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
1 Craigentinny and Duddingston Environment Forum January 2013 East Neighbourhood Roads Services.
HIGHWAY INSPECTION CRITERIA All roads are inspected at least twice a year. The intervention criteria identifies all trips on the footway over 25mm to be.
LEAN systems review Housing Register: Application and assessment process Annual review process.
Mark King Head of Service StreetCare Update Autumn 2015.
1 Our capital grants and you. 2 Capital grants How Where Why Who What When How Much.
Your Choice, Your Voice Richard Downing Community Engagement Manager Leicestershire County Council.
1 Roads and Transport Review Tony Lear Almond Neighbourhood Partnership Business Meeting 27 th February 2013.
Background: Initiated by the community with the first event held on Saturday 6 July 2013 Developed to tackle the ‘tagging’ and discarded rubbish concerns.
An area of significant change and identified as: Placeshaping in West Hampstead Area of Intensification in the London Plan Work completed and underway:
GLYNWATER EAST ASSOCIATION Members Meeting June 8, 2011.
S.T.A.R.S. CHOOLCHOOL RAVELRAVEL NDND OADOAD AFETYAFETY.
Brockley Assembly Thursday 27 January 2011 Spending the Mayor’s Fund 2010/11 and 2011/12.
SOUTH TYNESIDE INTEGRATED TRANSPORT STRATEGY Presentation to Riverside Community Area Forum, 7 th February 2008 Transport Futures.
Commission on Improving the Delivery of Transport and Pedestrian Infrastructure Coordination and Planning Ensuring Parity Ron Weetman - Assistant Head.
- 1 - Noticing the Work Julie Payne – SSE Street works Manager.
Assign Priority Calendar Category Community Projects Staff Projects Update/Establishes Polices/Ordinances Strategic Plan Goal? Yes – Assign Goal No – Not.
1 Ownership.Trust and respect. Inclusion and support. Sustainability. Innovation. Inspiration and passion. Paul Tysoe Asset Management Engineer Northamptonshire.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
SOUTH TYNESIDE INTEGRATED TRANSPORT STRATEGY Presentation to East Shields Community Area Forum, 21 st February 2008 Transport Futures.
Introduction of Area Working and Neighbourhood Management.
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
Rock Creek East II Livability Study April 28, 2016.
June 5, 2017.
Paths and the Community
Management and Maintenance of the Local Path Network
FOR LOCAL AGENCY FEDERAL AID PROJECTS
City of Wilmington Bike Plan Update
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Deer Valley Annual General Meeting
NEIGHBOURHOOD TRAFFIC SCHEMES PRIORITIZATION METHOD
Presentation transcript:

1 Portobello & Craigmillar Environment Forum February 2013 East Neighbourhood Roads Services

2 This presentation will: Introduce the East Roads Team Talk about what they do and their responsibilities Focus on the Portobello and Craigmillar Action Plan Update you on current NEPS and other projects; and invite suggestions for future works Invite you to participate in a ‘mini workshop’

3 Who are the East Roads Team? James Hunter East Environment Manager Scott Thomson Community Parks Officer Russell Linton Park Ranger Andy Matheson East Area Roads Manager Willie Barker Roads Officer (Ward 14) Tam Fairgrieve Roads Inspector (Ward 14) Keith Allison Roads Officer (Ward 17) Andy Pringle Roads Inspector (Ward 17) Andy Hunter Task Force Manager Katie Quinn ESDO

4 What are we responsible for? Ward 14 – Craigentinny and Duddingston: Category 1 Roads- 6.7km Category 2 Roads- 9.1km Category 3 Roads- 7.5km Category 4 Roads- 47.4km Total = 70.7km Ward 17 – Portobello and Craigmillar: Category 1 Roads- 19.1km Category 2 Roads- 4.2km Category 3 Roads- 6.6km Category 4 Roads- 63.3km Total = 93.2km

5 What are we responsible for? Inspection and maintenance of roads and pavements Co-ordinating utility works Allocating disabled parking spaces Organising road markings and general road repairs Providing permits (for scaffolding, skips, etc). 94 permits have been processed by the team since March 2012

6 What are the team’s key work priorities? Inspection of roads and pavements Coordinating road works through the Road Register Defect repairs Weather emergencies Right First Time Administer Capital and Revenue road repair budgets NEP projects Customer enquiries including accident and property damage claims Process traffic orders Large scale works on the road network:- New traffic signals at Milton Road junction and both Newcraighall Road junctions with A1.

7 How can I report an issue? Call the Clarence switchboard on , or Contact the East Environment Team on , or at Attend Environment Forum meetings and complete New Local Issues forms

8 Portobello and Craigmillar Community Plan Actions Publicise Neighbourhood Environment Programme budget: Members of the public were asked for project nominations; and decisions were agreed by the Environment Forum in March 2012 Nominations for 2013 projects: A bus tour took place in November 2012, to invite suggestions for 2013 projects. Nominations are invited at the end of this meeting Receive updates on NEP projects progress: A written report of actions is provided at each meeting. Encourage local reporting of roads & pavement issues through ‘Local Issues’ reporting form: the New Local Issues form is distributed at each meeting Walking and cycling on the Promenade and Eastfield: markings are being installed at entrances to Portobello Prom, to advise that it is part of Core Path Network (open to pedestrian, cyclists, horse riders) Identify and solve accident black spots. Examples include the Jewel to Asda rat- run: A mini workshop at the end of this meeting invites you to give us your thoughts on potential black spot areas in Ward 17.

9 Current Projects: Right First Time Right First Time is an ongoing project to permanently repair defects on roads and pavements throughout the city A repair squad is working within East Neighbourhood to repair defects up to 10m2 in size. If there are defects bigger than this, they will be identified and repaired at a later date Recent locations in Ward 17 include Regent Street, Marlborough Street, Niddrie Mill, the Cleekim’s and Wisp Green. Approximately £400k spent on this project in East Neighbourhood in 2012/ 2013

10 Recent Projects: Local Capital Funded Improvements Resurfacing works in:- Lee Crescent East Brighton Crescent

11 P&C NEP Project Update: 2012/2013

12 Craigmillar Castle Footway Link: Form new footway linking cycling/walkway to castle car park The East Roads Team is currently liaising with Historic Scotland, city archaeologist; and contractor Proposed completion date: end of March 2013

13 Coillesdene Sheltered Housing Upgrade areas of footways by resurfacing with hot rolled asphalt Locations have been agreed with sheltered housing representative Contractor planned to start 11 Feb 2013 Proposed completion date: early March 2013 PHOTO

14 Niddrie House Park New street lighting layout Awaiting update from Street Lighting Team regarding lighting upgrade. Negotiating with contractor regarding footway resurfacing Proposed completion date: end of March 2013

15 Joppa Plaza Improvements to band stand, drainage channels, surface and seating area Environment Forum to decide which seating is to be installed from options provided by the Roads Team Work is in progress. Tree grills now removed, channels have been cleaned out & tested Proposed completion date: early March 2013 PHOTO

16 Bath Street Installation of bollard Project completed mid Feb 2013

17 Moffat Way Upgrades to road signage and railings Liaising with Road Safety/ Development Control. Design is currently in progress Proposed completion date: beginning of March 2013

18 Niddrie Mains Road Link footway and desire lines at the Hays Order currently with ERS, start mid Feb 2013 Proposed completion date: mid March 2013

19 NEP Project Nominations: 2013/ 2014 Tell us where we can make improvements in the next financial year Complete the nomination forms provided and hand them in to a member of staff. Alternatively, with your nomination

20 Mini Workshop Please help us by giving us your thoughts on how we can better publicise the NEP schemes Identify potential accident black spots using the maps of Ward 17

21 Thank You Any Questions?