Dam Safety Regulations Revised Regulations announced 5/6 in ENB and DEC website Revised Regulations announced 5/6 in ENB and DEC website Published in State.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Jason Thom MADCS – October Handy Reference – THE place to look it up Identify Safe Procedures Operation Records Past records can be invaluable Maintenance.
General Permit for Low Hazard Potential Impounding Structures By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive, Charlottesville,
CMOM CMOM Capacity, Management, Operation & Maintenance and Remote Wireless Monitoring of Collection Systems 5 th Annual FVOA Mini Conference August 18,
More CMM Part Two : Details.
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
Business Critical Rules March 2015
Compliance Application Notice Process Update and Discussion with NERC MRC.
Tailing Dams – A Consultants Perspective
National Bridge Inspection Standards (NBIS)
A-16 Supplemental Guidance Document FGDC Annual Report Ken Shaffer FGDC Deputy Staff Director FGDC Coordination Group November.
ESSENTIAL SAFETY MEARURES IN BUILDINGS PRESENTED BY: BRUCE HOWIE.
Proposed Governing Document Revision Updated April, 2011.
Certification Requirements
1 ISTOG Position on Pre-conditioning ISTOG Input on Interpretation and Clarification Of NUREG-1482 Sections 3.5 / 3.6.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
Professional Experience Middle and Secondary Schooling Liaisons Meeting 9/07/12 Shane Pill Sally.Cole
Enforcement Overview Melissa Cordell, P.G. Enforcement Division Office of Compliance and Enforcement Texas Commission on Environmental Quality Environmental.
Federal Aviation Administration Southern Region FAASTeam CFI Special Emphasis Program Pilots Airworthiness Responsibilities Presented by: Mark L. Laughridge.
Design Manual Update City of Tacoma Public Meeting April 10, 2014 Jim Parvey, P.E., LEED AP City of Tacoma Senior Principal Engineer.
How to prepare for an Authorized Agent Compliance Review Ronald Hebert Water Section Manager Region 10/ Beaumont (409)
MSHA Communications and Tracking Workshop March 17, 2010.
QUALITY ASSURANCE AND THE QUALITY SPIRAL. ETQAs + SAQA SAQA NQF.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
Restoring and protecting Louisiana’s coast David Peterson – La. AG’s Office – Asst. Attorney General - AG Designee to CPRA Ken Ortego – Vilar and Elliott.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
BTEC Quality Assurance BTEC Foundation Level – Level 3 including Workskills The quality assurance includes three processes: Lead Internal Verifier.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: ESTONIA.
EPA’s DRAFT SIP and MODELING GUIDANCE Ian Cohen EPA Region 1 December 8, 2011.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
1 Geospatial Line of Business National Geospatial Advisory Committee Ivan B. DeLoatch, Managing Partner October 16, 2008.
Date CIP Standards Update Chris Humphreys Texas RE CIP Compliance.
1 SAFETY SAFETY Introduction & Overview INSY 3020 SPRING 2005.
Lynne Welsh Massachusetts Department of Environmental Protection.
2015 SAFETY SEMINAR HIGHLIGHTS OF 2014 Rick Moses Chief, Bureau of Safety Florida.
1 st Workshop on issues and trends arising from the European IRRS missions Findings and Conclusions A.Munuera Brussels, 22 nd and 23 rd January 2014.
Connected Vehicles Workforce FHWA Vehicle-to-Infrastructure
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt June 14, 2010.
Implementation of New State Program Performance Report Questions for 2007 Reporting Year 2 April, 2008.
NYS Department of Environmental Conservation Flow Standard Amendment to New York’s Water Quality Standards Regulations Scott J. Stoner Chief, Standards.
A collaborative approach by practitioners, customers, and stakeholders October 27, 2010 Sacramento.
The Unit Safety Statement November 2014 Dr Emer Bell Integrated Risk Solutions.
Mountain Regional Water Rules & Regulations Overview.
Enforcement Overview Melissa Cordell, P.G. Enforcement Division Office of Compliance and Enforcement Texas Commission on Environmental Quality Environmental.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Overview of FESHCom Subcommittees Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
N.O.T. Paperwork and Recorder of Deed Requirements NPDES & PCSM Permitting Workshop May 24, 2016.
Long-Term Stewardship: Institutional Controls on Department of Energy Sites Steve Schiesswohl, Senior Realty Officer November 2006.
Developing a Tribal Implementation Plan
Department of Environmental Quality
Inspector's Role and Responsibilities
Sharan Packer Specialist Inspector (Radiation)
Inspector's Role and Responsibilities
How Can I revise for Textiles?
Global Connections Day Building Safety Service Provider
Inspector's Role and Responsibilities
Chesapeake Bay Program
Background (history, process to date) Status of CANs
Safety is part of our culture at Halliburton
Premises Assurance Model
Safety Management System Implementation
Update on the Developments in Government Auditing Standards
NEW GUIDANCE UPDATES.
Pennsylvania NewsMedia Association March 21, 2017
IRRS Mission 2011 to Switzerland: Resulting Improvements to Regulatory Processes P. Flury.
Presentation transcript:

Dam Safety Regulations Revised Regulations announced 5/6 in ENB and DEC website Revised Regulations announced 5/6 in ENB and DEC website Published in State Register 5/20 Published in State Register 5/20  Public Comment Period 5/20-6/19  1 comment so far Assessment of Public Comments Assessment of Public Comments Regulations Promulgated Regulations Promulgated or withdrawn 8/1

2009 Regulations changes Re-introduce idea of Condition Ratings (exist in current regulations), but tie them to ability by DEC to require an Enhanced Safety Program. Re-introduce idea of Condition Ratings (exist in current regulations), but tie them to ability by DEC to require an Enhanced Safety Program. Make clear that dam deficiencies are violations of the ECL. Make clear that dam deficiencies are violations of the ECL. Extend the date by which the first Engineering Assessments and Emergency Action Plans are due for some dams. Extend the date by which the first Engineering Assessments and Emergency Action Plans are due for some dams. Remove an explicit schedule for required Safety Inspections, but require Safety Inspections at a frequency reflected in an Inspection and Maintenance Plan. Remove an explicit schedule for required Safety Inspections, but require Safety Inspections at a frequency reflected in an Inspection and Maintenance Plan. Clarify that financial assurance is to cover only the costs of breach or removal, and only if required by NYSDEC as part of an Enhanced Safety Program for dams whose condition is not satisfactory. Clarify that financial assurance is to cover only the costs of breach or removal, and only if required by NYSDEC as part of an Enhanced Safety Program for dams whose condition is not satisfactory.

Guidance documents Emergency Action Plan – nearly ready Emergency Action Plan – nearly ready Inspection and Maintenance Plan Inspection and Maintenance Plan Financial Assurance Financial Assurance “Guidelines for Design of Dams” (long-term) “Guidelines for Design of Dams” (long-term) Forms: Forms: –Supplement D-1 (Const. Permit App.) –Annual Certification –Post-incident Report

Other developments Inspections Inspections –Travel restrictions – more regional assistance –Backlog nearly gone –Extra inspections planned this year –Inspections during construction expected to increase Permits Permits –Activity has slowed – economy? –Small backlog Enforcement Enforcement –4 open cases –8 orders covering 12 dams –3 dams completed last year, several scheduled for construction this year. State staff cuts ???? Majority of staff, including Section Chief, have low seniority State staff cuts ???? Majority of staff, including Section Chief, have low seniority