Agenda Safety Topic Overview of Agenda Introductions

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Historically Underutilized Business Program Texas Department of Insurance Special Deputy Receiver Program January 2008.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Writing Proposals for Oak Ridge National Laboratory Women-Owned Small Business Day Sonny Rogers Contract Services Group Manager Oak Ridge, TN August 24,
Proven performers, good neighbors 1 Doing Business with Bechtel Parsons Blue Grass September 26, 2007 Diane Osbourne Small Business Advocate.
LATA Environmental Services of Kentucky, LLC Process for Approved Supplier Selection and Evaluation ASME NQA (and Addenda through 2007), Part I.
JOHN DEIGHAN CHIEF PURCHASING OFFICER ALLEGHENY COUNTY DEPARTMENT OF ADMINISTRATIVE SERVICES DIVISION OF PURCHASING.
PPAP Requirements Training
Roadmap to Success How to become a business partner with MCPS!
PROCUREMENT SERVICES DEPARTMENT “How We Do Business”
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
Undulator Long Lead Procurements Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
PROCEDURES FOR SELECTING THE CONTRACTOR
RFP Overview Alan A. Phillips, CPPB CTPM Texas Southern University Summer 2012.
How To Do Business With The Defense Energy Support Center Presented by David Christy Procurement Analyst Acquisition Policy & Oversight Office.
Very Small-Value Procurement Under World Bank/IDA Small Grants, Loans and Credits Zagreb Regional Procurement Training Feb. 27 – March 3, 2006.
Preparing the GSA Schedule Pricing Proposal
PROACTIS: Supplier User Guide Contract Management.
Sole Source Training.
1 Addendum Fall 2006 Limited-Term RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. September 11, 2006.
RICHARD BROWN UPF Procurement Director October 31, 2013.
CONTRACTUAL FLOW DOWN OF DPAS PRIORITY RATINGS
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
How the United Nations does Business Procurement Orientation in China 19 September 2003 Procurement Division United Nations Loida Madrigal.
1 PRESENTATION ON TENDERING REQUIREMENTS Presented by Kenya National Highways Authority (KeNHA) Team.
12-1 Project Management from Simple to Complex This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
Federal Acquisition Service U.S. General Services Administration Brandy Untalan Customer Service Director August 28, 2013 GSA Schedules Program.
Indiana Hoosier Lottery Lottery Draw Witness Pre-Proposal Conference September 14, 2012 Stan Judson IDOA Strategic Sourcing Analyst.
1 Doing Business with the University of North Texas System September 2015.
Selling to the Federal Government NATIONAL MATCHMAKING CONFERENCE CHICAGO, IL SBA OFFICE OF GOVERNMENT CONTRACTING.
Presented by: Masoud Shams Ahmadi February 2007 Enterprise Resource Planning (ERP) Selection Presented by: Masoud Shams Ahmadi
Contract Training Class I
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
1 THE BASICS THE NEW BUYERS ROADMAP TO SUCCESS Robert French (916) Joyce Henry (916)
Small Business Opportunities with the State of North Carolina Small Business Opportunities with the State of North Carolina Opportunities 2006 Asheville,
Indiana Public Works Vertical Lift Equipment Maintenance Request for Proposal Pre-Proposal Conference June 18, :00 AM Greg Moorman, Strategic.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Submitting a Quality Offer On the GSA Language Schedule GSA Federal Supply Service.
1 Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Area 3 Pre-Proposal Site Visit HSBP1015R0040 Sectors EL PASO / BIG BEND, TX
Request for Proposals Notification When to use?. When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
925th Contracting Battalion & Regional Contracting Center Capital
Construction Management At Risk Process
Department of Property and Procurement Division of Procurement Property & Procurement Economic Development Seminar Friday & Saturday, May 6 & 7, 2016.
Family Assessment Service Engagement Event 21 st August 2013 NWCE-9A3GPK.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Rules overview (1 hour presentation) User instructions This ppt deck is designed to provide a basic presentation for internal use in your organisation.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Bus stop Amenity Cleaning April 13, 2016.
SMUD Supply Chain Services: Daniel Manfredi- Contract Administrator SMUD Technical Team: Wim Bos- Contract Manager.
Evaluation. What is important??? Cost Quality Delivery Supplier Expertise Financial Stability Coverage Product Offerings Do you intend to negotiate?
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing Commercial Print Services
Contract Formulation and Administration
Award Management Services
Evaluation Grids Evaluation Grids.
TRAVEL SERVICES Request for Proposal
Joint Parking Task Force Update Procurement & Strategic Sourcing
Designers’ Manual Overview and Chapter Contents
“How We Do Business”.
Request for Proposal & Proposal
Request for Proposal and Specifications for
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing FPM ART GALLERY DESIGN SERVICES
Presentation transcript:

Agenda Safety Topic Overview of Agenda Introductions Richard Rife, Deputy Project Manager Lori Baker, Acquisition Services Manager Behle Burns, Design Manager John Walczyk, Construction Area Superintendent Evan Carlson, Field Procurement Manager Glenn Franklin, Project Procurement Manager

Overview Identification, Prequalification and Selection of Potential Bidders – What is the process and what are the requirements Request for Proposal – Section by Section Review Complete Proposals – What does it take to provide a complete proposal eRFP (Electronic Request for Proposal) R:/Administration/Presentation/SubcontractorTraining/Prequalification Requirements for Subcontractors June 2006

Prequalification Process Potential Bidders List Potential Bidders are identified as follows: Bechtel Global Supplier Information System Expressions of Interest through the BGCAPP Website Industrial Search Engines (Thomas Register, Construction Blue Book, etc.) Small Business Advocate input

http://supplier.bechtel.com Information needed by Supplier for FREE Registration Dunn and Bradstreet Number Bonding capacity, bid range Annual sales Area of expertise, work experience to enter commodity code information Business size classification

Identification, Qualification and Selection of Potential Bidders Prequalification Procurement Professional issues Prequalification Requirements to Potential Bidders Potential Bidders MUST respond completely and timely Subcontractor’s Certification Form to be completed/signed Satisfactory completion of the Prequalification requirements normally qualifies that the prospective offeror will be issued an RFP (Request for Proposal) Prequalification Requirements are unique to each Request for Proposal (Scope of Work). Prequalification Requirements will typically be divided between Commercial Technical

Identification, Qualification and Selection of Potential Bidders Commercial Is the potential supplier capable of furnishing a complete scope for the materials/equipment? Contact Information has been completed Similar Scope Experience List, including a summary of performance and Customer Contact Information Audited Financial Statements and/or current Comprehensive Dun and Bradstreet Report

Identification, Qualification and Selection of Potential Bidders 2) Technical Is the Bidder capable to perform the Scope of Work? What is the Bidder’s experience with this Scope of Work? Do they have capable personnel? What work is Subcontracted? (Work performed by others) Does the Bidder have an acceptable QA Program (e.g. ISO Certificate, or Table of Contents) ? Shop Capacity, and Work Load - does the Bidder have the ability to meet the shipment schedule?

Request for Proposal BGCAPP will issue formal, written Request for Proposals (RFP) for all permanent plant equipment The content for each RFP will be unique depending on the requirements of the Material Requisition. An RFP typically includes the following documents: Request for Proposal Letter (including attachments) Information and Instructions to Bidders Representations and Certifications Commercial Form of Proposal (including attachments) Technical Form of Proposal (Evaluation criteria)

RFP Letter - SAMPLE

RFP Form of Proposal ALL FIELDS MUST BE COMPLETE! If field is not applicable state N/A

RFP Section 1 Scope of Work and Pricing

RFP Section 2 Technical Specifications 2.3 – Drawings 2.4 – Technical Notes

RFP - Section 3 Drawings and Data Requirements G321-E SAMPLE

RFP - Section 3 Drawings and Data Requirements G321-EX SAMPLE

RFP - Section 3 Drawings and Data Requirements G321-V - SAMPLE

Material Safety Data Sheet Product Name: Adhesion Promoter AP8000 Issue Date: 11/09/2005 Print Date: 10 Aug 2006 * Indicates a Trademark Page 1 of 8 The Dow Chemical Company encourages and expects you to read and understand the entire (M)SDS, as there is important information throughout the document. We expect you to follow the precautions identified in this document unless your use conditions would necessitate other appropriate methods or actions. Material Safety Data Sheet Product Name: Adhesion Promoter AP8000 Issue Date: 11/09/2005 Print Date: 10 Aug 2006 * Indicates a Trademark Page 1 of 8 The Dow Chemical Company encourages and expects you to read and understand the entire (M)SDS, as there is important information throughout the document. We expect you to follow the precautions identified in this document unless your use conditions would necessitate other appropriate methods or actions. The Dow Chemical Company

RFP– Sections 4a, Flow-Downs, and Section 4b Section 4a: General Conditions Flow-Downs (Appendix FOA-1) are an appendix of the General Conditions and are specific points contained in our Prime Contract that MUST BE flowed down to the Suppliers Section 4b: Special Conditions Remember, exceptions to Terms and Conditions is an evaluation consideration!

RFP - Section 5 Supplier Quality Surveillance INSPECTION

RFP Section 6 Expediting Instructions Expediting Instructions offer specific guidance on submission of: Schedules Progress reports Organization charts Seller purchase orders Packing lists Shop loads/schedules Supplier Deviation Disposition Requests BUYER’s Expediting Contact

RFP Section 7 Packing, Marking, and Shipping Instructions Provides specific instructions on the requirements for Packing, Marking and Shipping equipment/goods including US Export Control Compliance

RFP Section 8 Invoicing Instructions Invoicing Instructions are provided to summarize the Invoice payment process requirements. It includes instructions on: Payment Terms (where they are located) Electronic Payment Invoice Preparation Instructions Bechtel Electronic Funds Transfer Authorization Form FAILURE TO PROVIDE A PROPERLY PREPARED INVOICE MAY RESULT IN THE INVOICE BEING REJECTED!

RFP Section 9 Supplier Quality Assurance Program

RFP Representations and Certifications Representations and Certifications are required with all proposals. This document requires the Offeror to make Representations and Certifications about their company. Reps and Certs must be completed by an authorized agent of the company Failure to complete Reps and Certs may result in removal of your proposal from further consideration

Complete Proposals What constitutes a complete proposal? The million dollar question, literally. It is IMPERATIVE that a Bidders proposal is complete and on time. Incomplete or untimely proposals may not be considered. What it takes to provide a complete proposal: READ THE ENTIRE RFP. Even if you are an experienced offeror, the requirements may change from RFP to RFP. It is IMPERATIVE that Bidders read and understand the entire RFP. In a typical RFP, the following documents are required to be provided with the proposal: Any requirements of the Information and Instruction to Bidders. Examples are as follows: Financials Experience Statements Copies of Code Stamps Resumes Execution Plans Copy of QA Manuals

Complete Proposals What constitutes a complete proposal? Continued A completed Form of Proposal. THAT MEANS NO BLANKS. EVERY FIELD SHOULD BE FILLED OUT, IF IT IS NOT APPLICABLE, TELL US! Include all attachments, such as (but not limited to): Optional Pricing Worksheets Unit price breakdowns A summary of Commercial or Technical Exceptions (if any) Technical Form of Proposal, including any submittal requirements A completed Section 1 Scope of Work and Pricing. If your company requires you to use a specific application to provide an offer, that’s fine, but the Section 1 document must be complete! Signed and dated Representations and Certifications form.

Review What you should know now QUESTIONS?

Procurement Status 32% Complete

Forecast of Acquisitions Construction Materials Construction Equipment, Tools, & Consumables Trucks and Gators Welding Machines, Shop Fabrication Equipment Electrical Materials Miscellaneous and Specialty Fabrication Pipe/Fitting/Valves/Pumps/Flanges Schedule is subject to change!

Forecast of Acquisitions Engineered Equipment & Materials Vertical Embeds Carbon Steel Pressure Vessels Bridge Monorail Crane Stainless Steel, Carbon Steel Clad & High Alloy Pressure Vessels Jib Crane Observation Windows Evaporative Coolers Chiller and Air Compressors Shield Doors

Forecast of Acquisitions Subcontracts and Service Contracts Potable Fire/Water Tanks Firewater Pump House Non-Destructive Examination Services Architectural Doors, Windows & Hardware Snow Removal & Road Sweeping Parking Lot Paving Personnel Maintenance Building Utility Building Laboratory Building

BGCAPP Project Website Website Link: www.bechtelparsonsbgcapp.com Please click on the link below to view a forecast of upcoming opportunities Construction and Services Awarded Company-138kv Main Substation and Pole Lines Awarded Company- Maintenance Building Awarded Company- Personnel Support Building Engineered Equipment Materials

Tips for Doing Business with Bechtel Parsons Blue Grass Complete and current registration on Bechtel Supplier and Contractor Portal Look for opportunities on the project website Market directly to project via Small Business Advocate and other Acquisition staff Identify small business socioeconomic status Complete documents for prequalification Fully read and understand Request for Proposal Ask questions

Contact Information Diane Osbourne Small Business Program Advocate 301 Highland Park Dr. Richmond, KY 40475 (859) 624-6204 dosbourn@bechtel.com