Why Performance Metrics? by Mouli V, PhD PE CEM NABCEP PV President, SolarPod TM Solar Minnesota meeting Convened by: Rebecca Lundberg, MRES & MnSEIA Board.

Slides:



Advertisements
Similar presentations
PV Market Trends and Technical Details. All of US has Suitable Solar Resource for Large Scale PV Deployment.
Advertisements

Presented by Gerry Imdieke.  We have as much solar energy as Florida or Houston Texas  4.6 hours per day  Panels produce more when cold.
“Update on the Expansion of CSU’s Underground Electric System” Selection of a Street Light Monitoring System Presented by : Timothy R. Crabb, P.E. Assistant.
Revised FY 2007 & Proposed FY 2008 Operating & Capital Budgets Retail Rates Committee January 4, 2007.
A Workshop for Solar Installers The Berkeley FIRST Program Financing Initiative for Renewable and Solar Technology.
The Nuts and Volts of Community Solar... USGBC Green Scene RJM Construction 701 North Washington Avenue February 26, 2015 Brian Ross, AICP, LEED GA.
Chatsworth Water Works Commission
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
United States Representative Gabrielle Giffords Presents Solar Power for the Home: Getting Started The 8th District of Arizona
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Solar Incentives for Arizona Public Service, Salt River Project, Tucson Electric Power.
Welcome and Introductions CoServ Presentation & Member Input.
1 RELIABILITY AFFORDABILITY ENVIRONMENTAL STEWARDSHIP Bringing Solar to the Community Jennifer Szaro, Orlando Utilities Commission.
Mrs. Smith’s 7th Grade Reading Blue Class Mrs. Smith’s 7th Grade Reading Blue Class Mrs. Smith’s 7th Grade Reading Blue Class.
Lori Singleton Manager, Sustainability Initiatives and Technologies September 15, 2010 SRP’s Sustainability Initiatives and Programs.
Why green is green Scott Starr GE Energy June 19, 2008.
Understanding Earned Value Analysis
2 California Solar Initiative Latest Handbook Changes The slides for today’s presentation can be downloaded/printed at
Northwest Power Planning Council, February, 2001 Photovoltaic Warranty Requirements Issue: The recommended 5-year warranty requirements for non- metered.
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. SDG&E’s Sustainable Communities Program and Support for our Solar.
Utah Legislative Update, March 14, 2007 Phil Powlick, Manager State Energy Program Utah Geological Survey.
1 Renewable Energy at Closed Landfills June 17, 2009 Jim Christo Massachusetts Renewable Energy Trust.
1 Why Choose Solar? Solar costs are coming down Solar panels are getting better and better Electricity costs are rising Solar panels last +25 years.
Solar*Rewards/MN Bonus Budget Solar Rewards (Rebate budget, $4.6M annually 2010, 2011, 2012) 2010: Dollars Allocated $2,378,272 (12/10) 2011: Dollars Allocated.
2 nd ACC Workshop June 20, 2014 The SSVEC Perspective David Bane, Key Account Manager
Proposed Financial Plan for Fiscal School Board Meeting February 12, 2015.
Cost of Going Solar in DC 4 Ways to Save! 1.DC Rebate $3/watt up to 3KW…. 2.Federal Tax Credit 30% of Total 3.Savings on your energy Bill (Net Metering.
Solar Rebate Program Summary Stacy Miller.
Talbot County Project Sunburst Talbot County Department of Parks & Recreation Private/Public Partnership July 12,
Smart Energy Smart Energy July 28, Smart Energy.
Soaring Heights Communities Family Housing Solar Project (at Davis-Monthan AFB) Presented by John Karelis, Utility Manager,
Benefits Of A Green Home Main Menu. Navigation/Menu Quit.
New Jersey’s Clean Energy Program: 2011 Renewable Energy Plan Overview of Final Compliance Filing REC Meeting 12/7/10 Charlie Garrison.
Lecture 10 8/10/15.
Parking Lots 10 & 11. Child Care Parking Lot #12.
{Project Name} Pre-Award Debriefing to {Insert Offeror Name} {Insert Date} Presented by: {Name}, Technical Team Lead {Name}, Contracting Officer Presented.
California Solar Initiative Dian M. Grueneich, Commissioner California Public Utilities Commission March 30, 2006.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Direct Mail CFLs Ryan Firestone and Carrie Nelson August 30, 2011.
1  Power plant costs are key factors in energy market policy decisions Key assumptions in the EIA NEMS model Input factors to all energy economic models.
GRAPHING RELATIONSHIPS For each graph, determine the graphing relationship and record it on a white board.
Solar Profiling Interstate Renewable Energy Council presentation to the ERCOT Profiling Working Group Jan. 22, 2008.
The Dominican Republic What can NSG do for You? 2014 Native Sun Group, Inc Meadowgrass Dr, Suite 101 Colorado Springs, CO Office: (719)
Session 22 (R) Utility Scale Solar Development Power Purchase Agreements (PPAs) April 04, 2016.
Home Generation Sam Hultgren, Ben LaFond, Curtis Haglin, Kennedy Peterson.
© 2016 Global Market Insights. All Rights Reserved Solar Tracker Market size Forecast Analysis ( )
The time to jump into SOLAR is … NOW! Lindsay Joye, P.E. Solar Program Manager City of Palo Alto Utilities November 5, 2015.
Presentation Title Subtitle or Speaker, Role in Project, Institution Place Institution Logo Here.
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Networks Physical Infrastructure Rick Finnegan April 22, 2008.
Welcome to Cloverland Electric Cooperative’s Special Board Meeting
SOLAR PROGRAMS Presented By Benjamin H. Jordan, P.E. 4/2016.
Overview May 24, 2017.
Understanding Earned Value Analysis
Understanding Earned Value Analysis
Finding Pennsylvania’s Solar Future
Electric Rates 101: Understand Your Rates, Control Your Bill
Meeting Your Renewable Goals
EVAAS Overview.
City of Lebanon, Missouri Electric Department
Net Metering John McComb: P.E.
Name: _______________________________
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Overview of School Effects (sample data)
Case No UT PNM Workshop Comments
Net Metering John McComb: P.E.
What Color is it?.
Kaysville City, UT Electric Rate Study Results
Island Energy Advisory Committee Board
Understanding Earned Value Analysis
Developing paragraphs
Presentation transcript:

Why Performance Metrics? by Mouli V, PhD PE CEM NABCEP PV President, SolarPod TM Solar Minnesota meeting Convened by: Rebecca Lundberg, MRES & MnSEIA Board

Why Performance Metrics Customers must be informed about how a system is performing. Equipment supplier and installer must be aware of what they are promising. Over estimation and under performance are both detrimental to the overall solar PV industry.

Why Performance Metrics RFPs have been written where expectations were way above reality. Many of us have lost out due to unrealistic energy projections by NREL, RFP owners and installers.

Important points Some of you may recognize the next slide’s systems and installations The purpose is only to bring out the reality in Minnesota. I would have got the same results if I had used the same.

Some examples of estimation Public Installation 1: – 600 kWh system – Promised per RFP: 750,000 kWh/yr = 1250 kWh/kW/year. – Actual is 1200 kWh/kW Public Installation 2: – kW – Promised per RFP: 57,107 kWh/yr = 1438 kWh/kW/year Public Installation 3: – kW – Promised per RFP: 144,965 kWh/yr = 1438 kWh/kW/year Public Installation 4: – kW – Promised per Brochure: 19,500 kWh/yr – 1290 kWh/kW/year = Actual 2/3 Public Installation 5: – kW – Promised per Ad: 28,000 kWh/year – 1440 kWh/kW/year = Actual 1/2

MN state study (2002 to 2008) After the first phase of the program was initially introduced in 2002, there were few solar rebate applicants. It was not until 2006 that the $1.15 million available was fully reserved. For the most recent biennium, fiscal years , the additional $1.2 million appropriated was fully reserved eight months prior to the end of the funding cycle. Acknowledgement: Ms. Stacy Miller, Office of Energy Security. Link to study

PV Watts - NREL kWtiltenergy Most used s/w model. Mostly over estimates production de-rate factor table.

Proposal – Fixed Tilt Latitude 44 o 30’ through 45 o 10’ Residential A color coded system. – Yellow : >1201 kWh/kW – Green: 1101 to 1200kWh/kW – Blue : 1000 to 1100 kWh/kW – Red : Below 1000 kWh/kW YGB are accepted ranges. Red is below accepted range. Red is failing grade Commercial / utility / Industrial A color coded system. – Yellow : >1201 kWh/kW – Green: 1101 to 1200kWh/kW – Red : Below 1100 kWh/kW YG are accepted ranges. Red is below accepted range.

Proposal – Tracking Latitude 44 o 30’ through 45 o 10’ Residential A color coded system. – Yellow : >1501 kWh/kW – Green: 1301 to 1500kWh/kW – Blue : 1200 to 1300 kWh/kW – Red : Below 1200 kWh/kW YGB are accepted ranges. Red is below accepted range. Red is failing grade Commercial / utility / Industrial A color coded system. – Yellow : >1501 kWh/kW – Green: 1301 to 1500kWh/kW – Red : Below 1300 kWh/kW YG are accepted ranges. Red is below accepted range.

Summary All of us have been affected by unrealistic performance expectations and delivery. Unrealistic estimation effects the overall MN solar PV industry. This hopefully will convince all of us to use metrics that are realistic so that the playing field is fair and level.