Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety The Future Role.

Slides:



Advertisements
Similar presentations
ESWW4, 5-9 th November 2007 Draft Proposal: Space Weather as part of an Optional Space Situational Awareness Programme A.Glover, E. Daly, R. Marsden, A.
Advertisements

Effective Contract Management Planning
Develop and Validate Minimum Core Criteria and Competencies for AgrAbility Program Staff Bill Field, Ed.D., Professor National AgrAbility Project Director.
Engineering Leadership
PROJECT RISK MANAGEMENT
Draft Action Plan Update – Agenda Item No. 5D Central Valley Flood Protection Board.
1 Review of US Human Space Flight Plans Committee Evaluation Measures and Criteria for Humans Spaceflight Options 12 August 2009.
Slide 1 Performance Based Contracting Slide 2 Adopting A Performance Mindset The Basic Principle: Managing Results Through Measurement.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Program Management Overview (An Introduction)
Contractor Assurance Discussion Forrestal Building Washington, D.C. December 14, 2011.
The Australian/New Zealand Standard on Risk Management
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
Measuring Environmental Performance: Beyond the Beans – San Diego County’s EPIC Pilot Project 16 th ANNUAL CIHC CONFERENCE December 4, 2006 presented by:
LOCAL LEVEL ALIGNMENT UNDER WIOA Office of Career, Technical, and Adult Education for NTI Conference November 12, 2014.
Introduction to ARA’s Proposal Resources Don Cole
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Capability Maturity Model
Framework for the Service Acquisition Process Conduct Historical Analysis Define Stakeholder & Customer Needs 2. Review Current Strategy 3. Market Research.
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Using Six Sigma to Achieve CMMI Levels 4 and 5
Before we start construction, let’s lay the groundwork.
Thomas Hacker Barb Fossum Matthew Lawrence Open Science Grid May 19, 2011.
U.S. Department of the Interior U.S. Geological Survey Facing Tomorrow’s Challenges USGS Science in the Coming Decade Dr. Mark Myers Director USGS.
Multnomah County Health Department ►Essential Services ►FDA Food Standards ►PACE Tools for Food Program Excellence Lila Wickham March 17, 2004 ♣
CHAPTER 4 The strategic Planning function รศ. ดร. เสรี วงษ์มณฑา.
 This presentation looks at: › What is risk management › How to identify risks › How to implement an effective risk management policy to increase your.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
1 CREATING A LEARNING ORGANIZATION AND AN ETHICAL ORGANIZATION STRATEGIC MANAGEMENT BUAD 4980.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
N By: Md Rezaul Huda Reza n
1 Robert S. Webb and Roger S. Pulwarty NOAA Climate Service.
Performance Based Contracting Florida State University Purchasing Department.
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
The Challenge of IT-Business Alignment
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
THE STRATEGIC PLANNING PROCESS Chris Sidoti ppt 4.
Homeland Security Grant Program 2015 Process Michelle Hanneken Illinois Emergency Management Agency.
IPMA Executive Conference Value of IT September 22, 2005.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Federal Aviation Administration Air Transportation Centers of Excellence COE for Alternative Jet Fuels & Environment COE Overview Government-Academic-Industry.
State and Regional Approaches to Improving Access to Services for Children and Youths with Epilepsy Technical Assistance Conference Call Sadie Silcott,
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Aerospace Process.
Global Assessment Report and need for Regional Assessment Report Meeting of the ISDR Asia Partnership, September September 2011 Pattaya, Thailand.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Requirements Engineering Process
Kathy Corbiere Service Delivery and Performance Commission
Safety and Mission Assurance Directorate, Goddard Space Flight Center Supply Chain Management Panel Session: NASA Supplier Assessments: Processes, Results.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Puget Sound Partnership Action Agenda: Roadmap to Completion.
Facing Tomorrow’s Challenges USGS Natural Hazards Science in the Coming Decade Facing Tomorrow’s Challenges USGS Natural Hazards Science in the Coming.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety Quality Leadership.
Strategic Plan Development Status Technical Analysis Forum meeting October 11, 2007.
Small Business Programs Tatia Evelyn-Bellamy Director Small Business Division Small Business Center February 2016.
Presenters Only: Presentation Overview and Goals The following presentation provides sample slides and talking points for individuals to use as a guide.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
Superior Infrastructure – Phase One Lenora Chapman & Michelle Stevenson Presenting.
National Workshop on Planning for the GEOHealth Hub for Interdisciplinary Research and Training Policy, Regulatory and Organizational Frameworks Getnet.
CDRH 2010 Strategic Priorities
Overview – Guide to Developing Safety Improvement Plan
Overview – Guide to Developing Safety Improvement Plan
Chapter 8: Criminal Justice Intro to Security, Instructor Name
Capability Maturity Model
Use of CMMI in an Acquisition Context Using CMMI for Process Improvement at USAF Space and Missile Systems Center (SMC) Dr. Jack R. Ferguson
Capability Maturity Model
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety The Future Role of Quality in Aerospace: Improving the Chances for Mission Success International Aerospace Quality Group 3 rd IAQG General Assembly Meeting Kyoto, Japan March 14, 2002 Dr. Michael A. Greenfield Acting Associate Administrator Office of Safety and Mission Assurance (1)

Mission Success Starts With Safety 03/14/2002 (2) The Big Picture – What NASA Must Do NASA’s programs must contribute to national priorities: – Economic growth and security. – Increased understanding of science and technology. – Protection of Earth’s environment. – Educational excellence. – Peaceful exploration and discovery. NASA’s programs must continue to build on the Agency’s core foundation for aeronautics and aerospace research and development. NASA must demonstrate improvement in business practices.

Mission Success Starts With Safety 03/14/2002 (3) Our Current Environment Stakeholder Expectations Programs that are on time, within budget, and are safe/successful. High priority planetary exploration, climate research, space station experimentation, and biological science that is effective. New technology for improved access to space, and more capable planetary missions. Outcomes that are meaningful to the public. Business Realities Flat budgets.  Workforce retirement, loss of critical skills.  Aging infrastructure.  Cost growth.  Increased reliance on the performance of the supply base.

Mission Success Starts With Safety 03/14/2002 (4) To succeed, processes must be stable, capable, and in control.

Mission Success Starts With Safety 03/14/2002 (5) Defenses Are Never Perfect Source: James Reason, Managing the Risks of Organizational Accidents, 1997, p. 9 But the reality can look like this. Hazard We perceive our ideal system of defenses like this.

Mission Success Starts With Safety 03/14/2002 (6) Requirements Design Process Development When Events Lines Up Just Right, the Consequences Can Be Devastating Adapted from : James Reason, Managing the Risks of Organizational Accidents, 1997, p. 12 Mishap Manufacturing Test Operations Hazar d

Mission Success Starts With Safety 03/14/2002 (7) Requirements Design Success Depends on Proactive Quality Efforts Adapted from : James Reason, Managing the Risks of Organizational Accidents, 1997, p. 12 We need to understand that our current defenses are not invincible. We need to proactively build in ways to “close the holes.” Quality-based tools are the best bet. – Requirements Definition – Process Control – Surveillance – Independent Analysis – Peer Review – Other Quality-based tools have high leverage. Product inspections have limited impact. They address the “symptoms.”

Mission Success Starts With Safety 03/14/2002 (8) NASA’s Quality Approach Performance Based Risk Based Industry Based 2 nd, 3 rd, and other EEE Parts Risk Mgmt. Vendor Status Problem Advisory Maintain Awareness Application Information Testing Risk based supplier assessment by technology area + Industry Partnership (Quality Leadership Forum, Industry Associations) Outreach to Supply Base (Awareness, Tools, Best Practices, Forums, Conferences) Standards/Clauses (AS 9100) Tailored Quality Requirements Improve Acquisition Capability Maturity Models Process Control Continual Improvement Improve Performance Improve Oversight Address High Risk Suppliers Address High Risk Parts Address High Risk Processes + ++

Mission Success Starts With Safety 03/14/2002 (9) Integrated Risk Approach Quality/Procurement/Program Management Acquisition PlanningSolicitation and AwardPerformance Work Analysis Develop WBS Analyze risk of work Performance Analysis Select indicators, standards Determine acceptable quality level Analyze cost/quality tradeoffs Risk Assessment Use historical data, experts, brainstorming, checklists Identify, analyze, quantify: risks, triggers, probability, impact, task linkage, surveillance method Identify stakeholders Develop Draft SOW Solicitation Release Draft SOW Analyze industry comments Develop acquisition strategy Issue final RFP Proposal Evaluation Assess risk for each proposal Contract Negotiation Surveillance method and frequency Performance metrics Program management plan Risk allocation Risk Management Includes Surveillance/ Communication Contract Award Surveillance Monitor contractor performance Conduct risk based assessments Adjust surveillance and performance metrics based on changes in performance and risk Communication Manage communications per Surveillance, Communication and Risk Management Project Risk Management Monitor Track Adjust

Mission Success Starts With Safety 03/14/2002 (10) Consistent Requirements Tailored to Risk For example “Limited Life” A proliferation of different program/contract specific words used to express the same requirement Single set of recommended words Guidance to assure the requirement is applied in risk areas Will Become Today

Mission Success Starts With Safety 03/14/2002 (11) Trades Aren’t Simple: Risk Versus Total Cost of COTS

Mission Success Starts With Safety 03/14/2002 (12) To Improve Quality, Management Must Also Improve Establish Accountability – Industry based requirements – Performance based contracts – Industry self oversight Emphasize Basics – Addressing systemic issues Demand Evidence – Oversight based on risk Impose Consequences for Poor Performance – Award fee, incentive fee, future business Focus on Results – Mission success criteria Mission Checklist Clear Expectations Clear Accountability Clear Results

Mission Success Starts With Safety 03/14/2002 (13) What’s the Bottom Line? There’s a lot at stake: – Human life. – One of a kind hardware. – Scientific knowledge. – International cooperation in space. – Economic viability. NASA must focus on its core competencies – R&D. Quality is critical to our ability to meet our ambitious goals.

Mission Success Starts With Safety 03/14/2002 (14) The Future State of Quality The future state of quality will have these elements: Quality requirements and expectations that are proportional to the risk of the activity and its expected outcome. A supplier oversight strategy that is integral to comprehensive program management (cost, schedule, and technical). Emphasis on high risk areas such as EEE parts, printed wiring board production, and other similar space technology/ environment concerns. With clear requirements, focused oversight, and proper emphasis on risk, we increase the chances for mission success, and everybody wins.