Structural Collapse: Shoring

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Unit 43 Wall Framing Wood-framed Wall Components • Constructing Wood-framed Walls • Sheathing Exterior Walls • Weather Barriers • Rainscreen Walls • Structural.
Roof Framing A Quick Primer
FORMWORK Prof Awad S. Hanna.
Heavy Concrete Construction Formwork
Competency: Draw Wall Sections
Parts of typical slab formwork
Split Sole 45 Degree Raker
Framing Agriculture Structures
Evaluate area for vertical shore placement and determine length for header and sole. Header and sole will utilize 12” O.H. for outside vertical posts and.
Trench Awareness Training For safety is not a gadget but a state of mind. ~ Eleanor Everet.
WALL FRAMING Section 6 of AS 1684 relates to the regulations governing timber wall construction.
Wall Form Design Example (Continued)
2 Post Vertical Shore/Laced Post
Skilled Trades 1201 Floor Framing
Structural Collapse Technician Training
Wall plate should measure the insertion point height plus 30” to accommodate a 30” cleat. The 30” cleat receives 20 X 16d nails. Cut the wall plate and.
10 Chapter Floor Framing. 10 Chapter Floor Framing.
Key Terms, and Concepts Mr. Paules.  Sole Plates – Lowest horizontal strip on wall and partition framing.  Walls are laid out on two plates  Top and.
Solid Sole 60 Degree Raker
Header and Sole should be cut at 48”. Verticals should be measured to reflect total height of void to be shored minus 8 ½”. 8 ½” accounts for the dimension.
Competency: Draw wall sections and details. Objective: Apply concepts of wood sill and floor construction.
Michelle Perticarari Rebeca Peña
FALL PROTECTION. WHY? –BECAUSE: Falls accounted for 10% of fatal work injuries in 1994 & Serious hazards can be present while above ground. –Examples:
LESSON TOPIC 1.2 SHORING.
SHORING Definition Means of providing temporary support to structures:
Balloon Frame North-American invention, 1833
Construction Framing Mr. Brock. Lumber 2x4s are not actually 2” by 4”
Wall and Ceiling Construction
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Roof and Ceiling Framing
FORMS, SCAFFOLDING and STAGING
BUILDING THE FRAME Walls are constructed in sections, lying down on the floor platform and then tilted up into position. Fundamentals of Building Construction,
Ag Construction Studs Vertical framing boards are called.
Wood Construction CTC-375.
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
Unit A3-9 Framing Agriculture Structures Problem Area 3 Construction Systems.
HOME BUILDING PART 1 Floor Framing. Floor Frame  Now that you have a foundation, it’s time to build on it.  This type of construction is for stem-wall.
Wall and Ceiling Construction
Structural Engineering
Topic 11: Timber Subfloor - Advanced
Sling Load Capacity and Sling Angles
Framed Structures Luisana Hernández.
House Construction.
Blocking a b c d.
CONSTRUCTION OF AGRICULTURAL STRUCTURES Mrs. Bagley.
Drafting 2 (Arch) Quiz Review #5
Competency: Draw wall sections and details
STRUT STABILIZATION PART 1
Structural Components
Floor System Sizes and Materials
Framing Vocabulary Stud: upright beams in the framework of a building
APPLICATIONS OF TECHNOLOGY
Do Now #7 What are the dimensions of the footing?
Framing Agriculture Structures
Construction Framing Mr. Brock.
Competency: Draw Wall Sections
Competency: Draw wall sections and details
Forms for Concrete Footings
Competency: Draw wall sections and details.
Framing Agriculture Structures
Competency: Draw wall sections and details
Building section A vertical cut or slice through a structure that illustrates the type of foundation, wall, and roof construction to be used.
Elevation Layout and Drawing Techniques
Unit 8 Floor Framing.
Common Components of a Traditional Wood Framed Building
Vocab. Vocab Wall Layout Floor Layout Ceiling Layout.
Competency: Draw Wall Sections
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
Presentation transcript:

Structural Collapse: Shoring FF Brian Ward Station 24 TRT/GSAR/Haz Mat Structural Collapse Technician

Terminal Objectives After lecture, discussion, demonstration and practice the student, given a specific situation, shall select the appropriate shore and properly describe the shore with 100% accuracy, according to the FEMA Structural Collapse Technician Manuel. After lecture, discussion, and practice the student shall describe and explain the appropriate uses of the types of shores discussed. Including weight constraints and its limitations according to the FEMA Structural Collapse Technician Manuel.

Enabling After lecture, discussion and practice the student shall identify the components of a rescue shore to 100% accuracy, to include gussets, cleats, wedges, vertical post, header plate, sole plate, diagonal post, cribbing and nails.

Enabling Objectives After lecture and discussion the student shall l identify the weight limitations for the shores listed previously. After lecture and discussion the student shall explain the appropriate use of the shores listed previously. The student shall describe the appropriate nail and nail patterns used for 2x4’s, 2x6’s, cleats, gussets, and braces after lecture and discussion.

Enabling Objectives After lecture, discussion, demonstration and practice the student shall identify the following shores with 100% accuracy: “T” Shore, Double “T” Shore, Window and Door Shore, Laced Post Shore, Vertical Shore, Two Post Vertical Shore, Horizontal Shore, and Crib Shoring.

Rescue Shoring: Is the temporary support of only that part of a damaged, collapsed, or partially collapsed structure which is required for conducting search and rescue operations at reduced risk to the victim and personnel.

Plywood Gussets ¾” x 12” x 12” ¾” x 6” x 12” Triangle (Means of egress) Used to capture joints and contain wedges in place. All plywood gets 8d nails. 8 and 5 with 5 nail profile.

Cleats 2x4x18” when used on interior shoring. Connects two sides (similar to gusset). 3 nails at each end.

Wedges “Marrying wedges” Full contact with min. of 1” overhang on each side of 4x4. 2x4x12” Cut side to cut side. Do not lift when pressurizing. Always nail behind wedges to prevent slippage. Sole Plate

Diagonal Brace

Components Header gusset vertical sole wedges cleat

Dimensional Lumber 2x4 2x6 4x4 6x6 ( No test available for) 3 nails 2x6 5 nails (3 is acceptable if splitting wood is of concern.) 4x4 6x6 ( No test available for) All dimensional lumber gets 16d nails.

Nails and Nail Patterns Nail Types Duplex and Standard 16 penny = 16d 8 penny = 8d 16d has a shear strength of 150lbs. 8d has a shear strength of 75lbs.

Nail Profile

Nail Patterns 2x4 (3 nails) 2x6 (5 nails) Note: 3 is acceptable if splitting of the wood is of a concern.

Application Take 5 mins. to apply the information.

Squaring Systems Pathegreom Theorem 3,4,5 Method 5’ 3’ 4’

Placement Wood and Steel Structures 1 floor below any damage. Concrete Structures at least 3 floors below any damage.

Principles Double Funnel Effect: the load is funneled through the shores and redistributed on a lower floor or the ground itself.

Interior Shores “T” Spot Shore Double “T” Shore Window and Door Shore Horizontal Shore Laced Post Shore Vertical Shore Two Post Vertical Shore

“T” Spot Shore Temporary shore only, Initial stabilization. 4,000 lbs. Materials 3’ Max. header and sole plate (4x4 or 6x6) Wedges (2x4) 2 gussets 1 cleat (2x4) 1 vertical post (4x4 or 6x6)

“T” Spot Shore

Double “T” Shore Temporary shore. 8,000 lbs. Materials 3’ header and sole plate 2 or 3 gussets (over six feet) 4 wedges 2 cleats 2 vertical post

Double “T” Shore

Window Shore 1in. Thickness for each foot of opening. Materials Header, sole, and two vertical post. If over 4’ can use 2 2x6’s with ¾ plywood sandwiched in between. 8 wedges 4 triangle gussets Bracing (when not used for egress).

Window Shore

Door Shore Same principles as window shore.

Door Shore

Horizontal Shore Wall plates and struts should be same length. 8’ max. Materials 2 struts 2 wall plates 2 diagonal braces 2 shims as cleats 4 wedges 2 cleats 4 gussets

Horizontal Shore

Laced Post Shore 17’ height max, 5’ width max. 32,000 lbs. Materials for 10’ lace post. 4 post 2 headers, 2 soles 8 braces 8 K braces 12 gussets 8 wedges 5’

Laced Post Shore

Vertical Shore Damaged Floor Materials Header and Sole plate 3 vertical post Midpoint brace 1x6 2 diagonal braces 8 gussets 6 wedges

Vertical Shore

Two Post Vertical Half of a Laced post Shore Not greater than 5’ O.C. Materials Header and Sole plate 2 K bracing Midpoint brace 2 vertical post 6 gussets 4 wedges 5’

Two Post Vertical Shore

Cribbing 4x4 or 6x6 can be used. 18’’ or 24’’ 2 by 2 layout, each point of contact is 6k. Should overlap by 4’’ on each side. Limit height to 3 times the width. Bottom layer should be solid.

Cribbing

Cribbing

Discussion

Conclusion Main points Proper shore for the job. Uses of particular shores. Identify shores, components, weight limitations, and uses.