Temple Bracing Standardization SENIOR DESIGN PROJECT KDK Engineering KEVIN COUCH DAVID DE KOCK KIRSTEN HINDS.

Slides:



Advertisements
Similar presentations
Structural Steel Construction
Advertisements

Managing a Successful Mechanical System project Following design – what next?
Copyright Professional Estimating Systems, Houston, TX, USA
CIVL202 Construction Engineering I Tutorial 8 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
California HVAC Program Strategy IOU Program Overview CPUC HVAC Workshop June 24, 2009.
Student Membership About ASHRAE ASHRAE Mission To advance the arts and sciences of heating, ventilating, air conditioning and refrigerating to serve.
SMACNA Seismic Restraint Manual
AIRSIDE DESIGN © Copyright 2008 HVAC Design Solutions1 Essential Design Programs with Accurate Sizing Calculations help to “Streamline Your Design” Essential.
S TRUCTURAL A NALYSIS OF M ECHANICAL M ODULES F OR M ODULAR D ESIGNED N UCLEAR P LANTS J UNE, 2011 By: Steven K. Sherfey, P.E. Presented By: Ankit (Andy)
Project Scope Management
Green Roof Action Project 綠頂行動 Our scheme is not just about physical implementation of green features on top of school buildings, it is about the knowledge.
Syed Zaidi, P.Eng. PM (Stanford), PhD. Director, Strategic Partnerships Alberta Infrastructure. Government of Alberta Canada Richard. B. (Dick) Innes,
Academic Advisor: Prof. Ronen Brafman Team Members: Ran Isenberg Mirit Markovich Noa Aharon Alon Furman.
EEN [Canada] Forum Shelley Borys Director, Evaluation September 30, 2010 Developing Evaluation Capacity.
Creator: ACSession No: 1 Slide No: 1Reviewer: SS CSE300Advanced Software EngineeringSeptember 2006 Introduction to the Module CSE300 Advanced Software.
Project Management Session 7
Chapter 5: Project Scope Management
1 Case Study: Starting the Student Registration System Chapter 3.
ASHRAE Advancing HVAC&R to serve humanity and promote a sustainable world…
Software Configuration Management
Engineering Systems of.
Work Breakdown Structure
Technology | education | networking | leadership ASHRAE Membership Why Wait? Join Today!
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Chapter 4 The Project. 2 Learning Objectives Third phase starts after a contract is drawn up and ends when the project objective is accomplished; final.
Construction Work Packaging
Student Membership. About ASHRAE ASHRAE Mission To advance the arts and sciences of heating, ventilating, air conditioning and refrigerating to serve.
Chapter 14 Information System Development
Chapter 2 Process: A Generic View
Section C Nonstructural Protective Measures
Telemedicine Technology Use Plan Brenda Janot Telemedicine Coordinator
Thriving in 4 Worlds Integral Missionary Preparation and Care.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Creating a Layout sheet. Sketching  Key Terms & Definitions  Mechanical Drafting: Drawings are created using mechanical instruments. Layout Sheet: consists.
Session 11 Grid Tied PV Systems – Part 1 Standards and Codes October 01, 2015.
Chapter 32 Drawing Framing Plans.
Construction of a Transfer Station
Performance Management A briefing for new managers.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Software Engineering Lecture # 1.
Defining Project Scope Research has demonstrated that a clearly defined project scope is a major component of project success. A clearly defined project.
LUSD Graduate OutcomesEngineering Pathway Outcomes Engineering 101 Outcomes ELA 9 Outcomes Analyze global environmental issues and act locally on those.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
Cmpe 589 Spring Fundamental Process and Process Management Concepts Process –the people, methods, and tools used to produce software products. –Improving.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
Airplane Hangar Design The design of a steel-framed airplane hangar Matthew Klein Edward F. Cross School of Engineering, Walla Walla University, College.
Association Leadership Meeting St. Louis, MO April 25-26, 2016 SMACNA Technical Services & Research.
Construction Work Packaging
HVAC DUCT CONSTRCTION EXAMPLES
Director’s Progress Review Closeout Meeting
NZS 4219:2009 Seismic Performance of Engineering Systems in Buildings
Review From the previous chapter, we understand that maintenance policy stream down from corporate strategy. It has to be integrated with management so.
Photovoltaic Systems Engineering Session 19
Student Membership.
Member Leadership teams
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
Student Membership
Director’s Progress Review Closeout Meeting
Lesson 1- Operations Management
C.M. Scullion Associates Ltd
Baseline – IEEE definition
Photovoltaic Systems Engineering Session 12
Introduction DEFINATION :-
Controlling Project Cost and Schedule
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
ELECTRICAL DISCHARGE MACHINING Special Process Instruction
Construction Management Services April 16, 2018
Presentation transcript:

Temple Bracing Standardization SENIOR DESIGN PROJECT KDK Engineering KEVIN COUCH DAVID DE KOCK KIRSTEN HINDS

Introduction  140 LDS temples currently in operation, 12 under construction and 16 announced  Temples need to be built and maintained with the latest advancements in seismic design  Mechanical systems integrated into temples need to be designed for seismic loads  This project addresses the need for specifications (specs) and details for the seismic restraints of mechanical systems in LDS temples

Project Organization Brent Maxfield (SE for LDS Church) Customer Kirsten Hinds Design/Plan Leader David de Kock Research & Public Relations Kevin Couch Schedule & Technical Jason Hirschi Graduate Advisor

Design Problem  Mechanical systems are often designed for gravity loads with seismic loads neglected  Mechanical systems in past temples are vulnerable to seismic loads  Seismic bracing expected but often inadequate quality control and accountability  Standardize mechanical system seismic bracing utilized in LDS temples  Create details and specs, in accordance with design codes, to be used by design engineers

Process  Understand the customers needs and expectations  Determine Deliverables  Fully research seismic design codes and guidelines (ASCE , SMACNA, ASHRAE)  Learn from industry professionals.  Refine project schedule and set measurable goals and deadlines  Hold each other accountable

Deliverables 1.Seismic bracing of ductwork details drawn in Revit A.Brace spacing guidelines

Deliverables 1.Seismic bracing of ductwork details drawn in Revit B.Rectangular and round ductwork bracing Transverse Longitudinal Rod Stiffener

Deliverables 2.A guideline with clearly defined seismic design expectations, ensuring installation of proper seismic bracing  Based on ASCE 7-13, SMACNA, ASHRAE, advice from industry professionals

Learning Outcomes  Understanding and managing customer expectations is the essence of any project  Differences in a team should be welcomed and harnessed  Accountability is essential for progress  Obtaining advice from industry professionals was vital to our success

KDK Engineering KEVIN COUCH DAVID DE KOCK KIRSTEN HINDS SEISMIC BRACING OF LDS TEMPLES The Church of Jesus Christ of Latter-day Saints builds and maintains beautiful temples of worship throughout the world. It is expected that the life of these temples will span many generations as places to serve and worship God. In order for temples to remain functioning and operational, they need to be built and maintained with the latest advancements in seismic design. In addition to the structure of the temples, there are many mechanical systems integrated into the operability of the temple. These mechanical systems need to be designed for seismic loads. This project addresses the need for specifications and details for the seismic restraints of the mechanical systems within LDS temples. Brace Spacing Guidelines Brace Spacing Schedule Rect. Duct Transverse Brace Circular Duct Transverse Brace Longitudinal Brace Rod Stiffener Details were provided for various situations, including Rectangular Duct Transverse Bracing, Round Duct Transverse Bracing, Rectangular/Round Duct Longitudinal Bracing, Equipment Bracing and Rod Stiffening. Drawing examples are shown below. Details- Recommended specifications were also provided. These specifications will ensure all bids from engineers and contractors will be consistent and comparable and ensure proper seismic bracing of non-structural components. The specifications include clarification on items in ASCE 7-10 Chapter 13, definitions, submittal, force design, bracing and connection requirements. Specifications- Seismic bracing of HVAC systems must be spaced at specific intervals to ensure performance during a seismic event. The Brace Spacing Steps provided help the engineer easily determine the spacing of seismic braces. Brace Spacing-