All ground where the feet of the N-Rack are to go must be levelled and concreted. This must be done in advance to allow the concrete to set. There are.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Unit 8 Fastening Systems
Cabinet and Countertop Installation
Gable Roofs and Components
Instructions for building the Round house and Roman villa
Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Expand Media Wall & Podium Case Training Video’s & Instructions.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Tom’s Tips for Silencing Your Model “A” 2014 Missouri Valley Region Membership Meet.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Click on this image to open the full PDF document.
Skyscraper Construction
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Materials QtyLWHDescription 28’X4’X15/16”Plywood (15/16” is also known as ¾”) 88’X2”X1”Lumber – Pine 16Home Depot 5 Gal Bucket 48’Rolls of hook and tie.
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
Cooling Business Group 1 INSTALLATION Directions.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Chapter 7 Metals.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Tiffany Victorian assembly instructions By Laser Dollhouse Designs.
Hand-cranked Windmill Assembly Instructions copyright Mechanical Kits Ltd
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Metals. Introduction u Metal is used in various places in the construction process including: –rebar = reinforcing steel in round shapes –flashing = thin.
Plans for Pan-type Bed Shapers
Bridging the Gap: Building Bridges 101, It Is Time to Get To Work
Plans for the 2015 Invention Challenge Target Paul MacNeal August 9,
Installing Dutch Doors…
By: Caleb VanderWal.  Mix cement  Dig hole at least 24” into the ground  Poor cement in ground with poles  Wait 2-3 days (if you don’t wait that long.
Introduction Boxes can be split into all kinds of sections
Energy Area Presentation November 19th, 2011 Ryan Arch Ryan Asa Fabian Lopez Ogee Nnamdi-Emetarom Jerron Smith.
Shop Built Magnetic LED Light Bob Clark Aug, 11, 2011.
How to Build a Divider Wall By Charysse Roberson.
Presentation by ANAS AHMAD ME1 B1 batch Submited to
+ This step by step tutorial demonstrates drawing a keyboard illustration using rectangles, grids, move and transform effects.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Bill of materials: Include the following Item name Number of pieces Type of material Size of pieces Total feet of different material Unit cost Total project.
Section 2 Safety, Tools and Equipment, Shop Practices Unit 6: Fasteners.
Courtesy Eric Witherspoon, Sonex plans #815 Photo 1: What it is. Photo 2: How it works. Sonex Wing Stand Answer to photos 3 and 4: Want leading.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
Assembly of steering.
Mezzanine Build Plans.
VIEW SERIES with Sliding Door
Common Woodworking Hand Tools
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Installation Walkthrough Image Guide
How to make HOCO FLOWERS:
ME Contest Structure Plan View dia. orange circle
Hand-cranked Windmill Assembly Instructions
Wood structures Topic 3 Floor Framing
Step-by-step assembly instructions
Step-by-step assembly instructions
Assembly instructions for M-K all bolt together hoppercone kit.
Flag Installation on Roll-up Signs
Mounting a BalanceBox®650 to a brick wall
Flag Installation on Roll-up Signs
The basic parts needed to make a flux capacitor are 8 high voltage capacitors (Vishay Cera-Mite 500 pf 15 KV capacitors with Y5U dielectric are suitable),
Step-by-step assembly instructions
Step-by-Step Assembly Instructions – Cube Version
DucoSlide Luxframe F Fitting instructions L.H. R.H.
Step-by-step assembly instructions
Step-by-step assembly instructions
Bunker Wall Design Wall ESS
Four Jaw Collimator.
Omega Selection Center
Presentation transcript:

All ground where the feet of the N-Rack are to go must be levelled and concreted. This must be done in advance to allow the concrete to set. There are a few ways to do this: N-Rack Installation – Part 1 Concrete Footings The foundations must be big enough to allow at least 100mm on every side from the screws (85mm long) that will be bolted down through the feet SunGift Trade, 2 Christow Road, Exeter EX2 8QP ● ● 1)Lay a concrete base covering the whole footprint of the array: 2)Dig two strip horizontally, for the feet of the array: 3) Dig strips vertically for the fee of the array:

N-Rack Installation – Part 2 Building the Frame N racks only allows panels to be mounted in portrait and they have to be in two rows. The ‘N’ on the N-rack comes as four bars and two feet. All bars and feet have pre-drilled holed where they overlap with each other An allen bolt, washer and nut are put through the overlapping sections to hold together the structure Each ‘N’ is sold as one piece, and we sell at £ VAT U Shape Bar (V. Long) Small L Bar Large L Bar Pointy Connector Feet SunGift Trade, 2 Christow Road, Exeter EX2 8QP ● ●

N-Rack Installation – Part 3 Completing the Frame Once the ‘N’s are made, they are screwed into the pre-levelled concrete floor, 1.4m apart: The U-shaped bar (V Long) has pre-drilled holes which the medium rail can be put on top of and secured with a T-nut and bolt. This process is repeated and rail connector sets used if needed. Whether rail connectors are needed will depend on the size of the N-rack. In the middle section of the N Rack a wind brace must be installed. This is essentially a cross brace which runs across the back of the array (as shown below). It is important to make sure that the ‘N’’s are 1.4m apart so that the wind brace fits. A wind brace must be fitted across the back and the front of the array, in the central part of the array. 1.4m Medium Rail SunGift Trade, 2 Christow Road, Exeter EX2 8QP ● ● Wind Braces

Panels are placed on top of the medium rail and clamped into position using mid and end clamps, much like a roof mounted installations. N-Rack Installation – Part 4 Putting on panels How to design an N-Rack System 1)Work out the dimensions of the array, i.e. Work out how many panels you will be installing and the size of the combined array. 2) Work out how many ‘N’s you will need, i.e. Divide the length of the array by 1.4m. On a typical 4kW installation, using panels which are roughly 1m wide you will need six ‘N’s. 3)Work out which rail fittings you need to mount the panels, always using medium rail to make sure rail tolerances are adhered to. Again, on a typical 4kW installation, with two rows of eight panels in portrait, you will need 8 lengths of medium rail. 4)Get a quote from SunGift Trade! Call or A Typical 4kW system will require: 6 x N’s, 8 x Medium rail 4.35m, 4 x medium connector sets, 24 x T nut + bolt set, 8 x end clamps, 39-41mm, 28 x mid clamp sets 34-41mm SunGift Trade, 2 Christow Road, Exeter EX2 8QP ● ●