ALOKRAJ. V - NA07B004. General  All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.

Slides:



Advertisements
Similar presentations
Inspected in port Shanghai from 26th to 28th Sept by NCL
Advertisements

BeginningNext SlideBack End Program AVADAL 1 of 21 SK-1 Roller Apron Segment Overview.
Types of Merchant Ships - Introduction-
M760 TOWER CRANES ERECTION
Engineer Training XL1200 Mechanics. Engineer Training XL1200 Mechanics Confidential 2 The XL1200 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Hydraulics hy·drau·lics [h drólliks ] noun study of fluids:  the study of water or other fluids at rest or in motion, especially with respect to engineering.
Nautical terms & vessel terminology
Essential reading: SPINČIĆ, A., An English Textbook For Marine Engineers I., Pomorski fakultet, Rijeka LUZER, J., SPINČIĆ, A., Gramatička vježbenica.
Boating is fun… we’ll show you how America’s Boating Course 3 rd Edition 1Trailering Chapter 4 Section 14 >>
2.5.2 Student Book © 2004 Propane Education & Research CouncilPage Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.
LESSON TWO BEFORE YOU GET UNDERWAY. Key Topics Vessel’s capacity Vessel’s capacity Float plans Float plans Fueling a vessel Fueling a vessel Trailering.
General Arrangement Plan
General Arrangement Plan
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
Crane Operations Objective
Marine Auxiliary Machinery Chapter 9 Lesson 5 Deck Machinery Cargo Handling By Professor Zhao Zai Li
Fall Protection and Ladder Safety Training. Course Outline  Introduction  Fall Protection  Ladder Safety  Wrap-up.
ISM Code Training Material
Cargo Gear Survey … …………………......……………... ILO 32 ………………….…..……………………………. ILO ………………………………... TNS 15 Regulations.
Aerial Apparatus Operator Types and Construction of Aerial Apparatus.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
Anchor Handling Tug Supply Vessel
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Sea Water Scrubber. INTRODUCTION Crystallox has developed a new generation of horizontal and vertical scrubbers for marine and land based applications.
The Development of Specialized Skills Ship-Handling & Navigation Operation of Deck Equipment, ie. Anchors, Knot Tying, Line Handling Dealing with Emergencies,
General Arrangement Plan
EMERGENCY TOWING PROCEDURE
1. KEY FEATURES VESSEL IS OCCUPIED WITH FULLY AUTOMATIC SYSTEM IN SUCH A WAY THAT 4 CREW CAN OPERATE THE VESSEL MANEUVERING AND CARGO LOADING/DISCHARGING.
Dewatering Equipment.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
ALOKRAJ. V - NA07B004. High Pressure Water Jet Blasting Machine  One Electric driven water blasting machine  2 water jet guns, hoses 400 feet each as.
Installation. Indoor Unit Installation Typical Installation.
Floors and Double Bottoms
MANAGEMENT CULTURE ISM 2.0 YOU ARE THE BOSSES, ACT LIKE THAT!! SAFETY CULTURE HAS TO BE IMPROVED ZERO TOLERANCE ON SAFETY VIOLATIONS ONBOARD MANAGEMENT.
MARITIME SCHOOL ASSESMENT PROGRAM REVIEW
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Lesson Five Bulkheads and Pillars.
WBRS in Operation. Solution: utilize deckhead mounted handling hardware developed for seismic survey vessels. Many of these vessels have 2 mission bays.
SHIPS, SHIP ROUTINE AND CONSTRACTION. 1. The pillar shape that gives the greatest strength for the least weight is the _______. A. circular type pillar.
STBD. BOAT DECK MONITOR HEAVY CORROSION FOUND INSIDE ELECTRICAL MOTORS RENDERING THE MONITOR NON-OPERATIONAL.
Deck Crane.
Fire Fighting Systems Fi Fi Mains ●White System: This system has a lower output as far as volume goes. This main supplies 3x Eductor/Hydrants (500 gpm).
Power Distribution System General Location. Power Distribution The Main Switchboard is the hub of the electrical distribution system. Everything ties.
Red/Green Fire Fighting Systems Fi Fi Mains ●Red System: Port Side Fire Main supplies two Monitors. M7 (6000) gpm on centerline on the fwd Wheelhouse top.
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
Bilge Pumping Systems General Locations.
The EPHS = Electrically Powered Hydraulic Steering is familiar from the Lupo FSI. This system is supplied by TRW and by KOYO. The steering system offers.
Roll up Door CHECK GEAR OIL CAPACITY MAINTAIN AT FILLER PLUG LEVEL
Forward & Aft Searchlight Operate Forward & Aft Searchlight.
Ships Service Air System
ALOKRAJ. V - NA07B004. General All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
November 2013 Institution update
Engineer Training XL1500 Mechanics. Engineer Training XL1500 Mechanics Confidential 2 The XL1500 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Deck Equipment AGOR 27. Deck Crane: TK Deck aft Portable Crane: TK Deck fwd Per Design Specification (J-1) Cranes Shall be capable of:
 Is the room or platform from which the ship can be commanded. When a ship is underway the bridge is manned by an OWO (officer of the watch) aided usually.
Planned Maintenance 1. locations of maintenance EngineDeckCateringNavigation Life safety appliances.
Module 3 – Naval Skills Section 2 – Ship Structure Chapter 1 – Ship Construction Unit 1 - Ship Construction and Damage Control.
Module 3 – Naval Skills Unit 3 - Basic Seamanship
Nautical terms AND MORE….
Auxiliary Engines Pumps Winches Steering engine Boilers Generators
SBN Far Detector Installation & Integration
ANCHORING & MOORING An anchor is used to attach a ship to the seabed at a specific point. The primary function of an anchor is to hold the ship againts.
Hydraulics hy·drau·lics [h drólliks ] noun study of fluids:  the study of water or other fluids at rest or in motion, especially with respect to engineering.
C.K. Pithawala College of Engg & Tech.
RESCUE BOAT DAVIT CME Models: D & D
Firefighting equipment
Arch205 building construction vertical elevators
LIFT,ESCALATOR AND MOVING WALKS
SEAMANSHIP
Presentation transcript:

ALOKRAJ. V - NA07B004

General  All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational & owner’s requirement.

Anchors & Mooring Equipment  An anchor is a heavy object, often made out of metal, that is used to attach a ship to the sea bottom and prevent the ship from moving.  Two bow anchors (each of 1920 kg) with high holding force together with shackle and stud link chain cable are to be installed in accordance with the rules.One spare anchor to be provided and stored on board

BOW ANCHOR

AJAI KURIAN MATHEW - NA07B002 ALOKRAJ. V - NA07B004

General  All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational & owner’s requirement.

Anchors & Mooring Equipment  An anchor is a heavy object, often made out of metal, that is used to attach a ship to the sea bottom and prevent the ship from moving.  Two bow anchors (each of 1920 kg) with high holding force together with shackle and stud link chain cable are to be installed in accordance with the rules.One spare anchor to be provided and stored on board

BOW ANCHOR

Anchor Windlass-cum- Mooring winch.  An anchor windlass is a machine that restrains and manipulates the anchor chain and/or rope on a boat, allowing the anchor to be raised and lowered.  Electro-hydraulic Drive.  Each windlass cum winch with two cable lifter & two warping drum and one central drum to be provided.  Capacity of cable lifter : 9 12 meter/min or as per classification requirement which ever is higher.

Capstans  Two electro-hydraulic capstans.  An apparatus used for hoisting weights, consisting of a vertical spool-shaped cylinder that is rotated manually or by machine and around which a cable is wound.  Pulling force of 5 15m/min.

Tugger Winch.  A small drum winch designed to assist the crew in manipulating the heavy pieces of towing gear such as chain bridles, towing plates and large towing wires used in anchor-handling or ship- handling work  Commonly fitted in offshore vessels at the cargo deck area behind the superstructure

HYDRAULIC TUGGER WINCH

 Capacity 10 tonnes at 15m/min.  The winch is to be complete with one wire drum and one inboard warping head, complete with 250mx22mm dia wire.

Smit bracket  Fitting welded on deck to enable towing connections to be made quickly and securely.  The vessel shall be equipped with a 150 tonnes SWL ‘Smit bracket’ on the fox’le deck.

Lashing Lugs & Dummy Capstans  20 numbers of 5T SWL lugs are to be arranged on main deck / Cargo Rail.  Sufficient (8 Nos.) numbers of dummy capstans each are to be fitted on the supports of the cargo rails / main deck suitably at the port & stbd. LUG

Bollard  Around 12 bollards of 12” NB on board vessel.  Mooring pipes or chocks for the above bollards are to be fitted to the bulwark as required.

Davit Used to lower things over an edge of a long drop off such as lowering a maintenance trapeze down a building or launching a lifeboat over the side of a ship.

 One davit along with an electric operated winch of 1 Ton SWL is to be provided on the stbd side on the forecastle deck mounted close to or on the bulwark.

National Colours  "Staff" to be installed at mast for national colours. Escape Hatches  Watertight hatches, with counter weights in:  Engine room  Aft Thruster Compartment.  Construction Equipment Room  Bow thruster room.

 Rungs or vertical ladder are to be fitted for each escape hatch and area to be illuminated by emergency light.

Storm Rails  A support brace is provided for structurally linking a sliding door to a surrounding structure. The support brace includes an elongate rail having a first end and a second end.  Storm rails and grab rails to be fitted all round deckhouse and wheelhouse and on exterior bulkheads.  Storm rails also to be fitted in convenient positions in toilets, engine room and thruster compartments.

Drainage for Decks  Suitable scupper pipes minimum 50mm to be positioned in funnels, along the main deck, forecastle deck and wheelhouse top to facilitate deck drainage.  Drains are to discharge overboard through a storm valve. Covers for Deck Equipment  Suitable strong PVC / Canvas covers for deck equipment such as compass, searchlight, speaker, signal lights, anchor windlass, etc are to be provided.

Deck Crane  Two electro hydraulic telescopic type marine crane is to be fitted on the main deck.  Both the cranes to be continuous slewing type.  Main Crane  The Main crane to have a telescopic boom with 3 or 4 extensions, which can be extended at least to 55 meters.  SWL of 20 metric 20 meter radius and to be able to lift the load to a height of 30 meters above waterline.  The crane to be fitted with a safe load indicator and air- conditioned operator’s cabin  Aux. Crane  The Aux. crane to have a telescopic boom with 1 extension which can be extended at least 12 meters.  The SWL of crane top be 3 metric 12 meter radius.  The crane to be fitted with a operator chair.

Crash bar/Cargo Rails :  Cargo rails made of 8" N.B.,Sch(Nominal Bore, Schedule).  80 pipes to sustain minimum 100 T compressive strength are to be fitted longitudinally along the main deck for the stowage of pipes, etc. on P+S to be fitted around cargo area of main deck.  The height of cargo rail/crash bar is to be 1.5 m. Work Deck  The aft working deck area of about 325 m 2 suitably sheathed with hard wood is to be provided.  The deck loading is 5 T/m 2.

Working Air System.  Compressor: The Vessel shall be equipped with one permanently installed Electric driven working air compressor connected to working air supply system  Outlet points include the clear open deck on both sides at the stern, workshop, covered fabrication area and construction equipment room.  Refrigerated Air Dryer: Refrigerated air dryer to be provided to handle the above mentioned compressor.  The dryer shall ensure that the air is dry in all ambient temperature & humidity conditions in the Arabian Gulf.

Marine Air Compressor Refrigerated Air Dryer

Chemical Dosing pump  One electric driven chemical dosing pump is installed.  Dosing pump unit to be complete with reservoir tanks and dosing manifold required to inject corrosion inhibitor into oil flow lines temporarily out of service.  The chemical dosing pump is connected to the flushing pump. Specifications include:  Flow rate : variable to suit the flushing pump, injection rate control range from 50ppm to 1000ppm  Discharge pressure : 0 to 30 bar.  Type of Chemical : Surflo B17, Nalco Visco 3656, Baroid coat 777, Cronox 669, and other flow line additives as required.

Chemical Dosing Pump