Developing Evacuation Model using Dynamic Traffic Assignment ChiPing Lam, Houston-Galveston Area Council Dr. Jim Benson, Texas Transportation Institute.

Slides:



Advertisements
Similar presentations
A PERSPECTIVE ON APPLICATION OF A PAIR OF PLANNING AND MICRO SIMULATION MODELS: EXPERIENCE FROM I-405 CORRIDOR STUDY PROGRAM Murli K. Adury Youssef Dehghani.
Advertisements

Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
Getting on the MOVES: Using Dynameq and the US EPA MOVES Model to Measure the Air Pollution Emissions TRPC – Smart Corridors Project Chris Breiland Fehr.
Determining the Free-Flow Speeds in a Regional Travel Demand Model based on the Highway Capacity Manual Chao Wang Joseph Huegy Institute for Transportation.
TRB Planning Applications Conference Development of Hurricane Rita Evacuation Trip Tables for the Houston-Galveston Region Jim D. Benson, Texas Transportation.
Dynamic Traffic Assignment: Integrating Dynameq into Long Range Planning Studies Model City 2011 – Portland, Oregon Richard Walker - Portland Metro Scott.
GREATER NEW YORK A GREENER Travel Demand Modeling for analysis of Congestion Mitigation policies October 24, 2007.
Applying DynusT to the I-10 Corridor Study, Tucson, AZ ITE Western District Meeting Santa Barbara June 26th, 2012 Jim Schoen, PE, Kittelson & Assoc. Khang.
12th TRB National Transportation Planning Applications Conference
What is the Model??? A Primer on Transportation Demand Forecasting Models Shawn Turner Theo Petritsch Keith Lovan Lisa Aultman-Hall.
SCAG Region Heavy Duty Truck Model Southern California Region Heavy Duty Truck Model.
Session C2: Promising Research Roundtable An Integrated Work-Zone Computer System For Capacity Estimation, Cost/Benefit Analysis, and Design Of Control.
Session 11: Model Calibration, Validation, and Reasonableness Checks
Evaluation Tools to Support ITS Planning Process FDOT Research #BD presented to Model Advancement Committee presented by Mohammed Hadi, Ph.D., PE.
Automatic loading of inputs for Real Time Evacuation Scenario Simulations: evaluation using mesoscopic models Josep M. Aymamí 15th TRB National Transportation.
An Experimental Procedure for Mid Block-Based Traffic Assignment on Sub-area with Detailed Road Network Tao Ye M.A.Sc Candidate University of Toronto MCRI.
Challenge 2: Spatial Aggregation Level Multi-tier Modeling in Ohio Attempts to Balance Run Time and Forecast Granularity Gregory Giaimo, PE The Ohio Department.
Presented to presented by Cambridge Systematics, Inc. Transportation leadership you can trust. An Integrated Travel Demand, Mesoscopic and Microscopic.
Validate - A Nationwide Dynamic Travel Demand Model for Germany Peter Vortisch, Volker Waßmuth, PTV AG, Germany.
Applied Transportation Analysis ITS Application SCATS.
©2009 Proprietary and Confidential DTA in practice: Modeling dynamic networks in the real world Michael Mahut, Ph.D. INRO Montreal, Canada.
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
Developing Statewide Evacuation Model Chi Ping Lam, Houston-Galveston Area Council Chris Van Slyke, Houston-Galveston Area Council Heng Wang, Houston-Galveston.
Considerations when applying Paramics to Strategic Traffic Models Paramics User Group Meeting October 9 th, 2009 Presented Matthew.
Keir Opie National Center for Transportation and Industrial Productivity (NCTIP) New Jersey Institute of Technology (NJIT) Paramics North American User.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
June 15, 2010 For the Missoula Metropolitan Planning Organization Travel Modeling
A Simple Framework to Access Potential Impact of Regional Toll System on Environmental Justice Population Chi Ping Lam, Houston-Galveston Area Council.
Lynn Peterson Secretary of Transportation Combining Macro Scopic and Meso Scopic Models in Toll and Traffic Revenue Forecasting SR 167 Corridor Completion.
© 2014 HDR, Inc., all rights reserved. COUNCIL BLUFFS INTERSTATE SYSTEM MODEL Jon Markt Source: FHWA.
2007 TRB Planning Application Conference D ELDOT S TATEWIDE E VACUATION M ODEL.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
Analysis of a Multimodal Light Rail Corridor using an Activity-Based Microsimulation Framework S. Ellie Volosin & Ram M. Pendyala, Arizona State University,
April 2010 Scott Smith Volpe Center / RITA / U.S. DOT Transportation Border Working Group Meeting Boston, MA An Integrated Regional Planning / Microsimulation.
Update on Developing Evacuation Model using Dynamic Traffic Assignment ChiPing Lam, Houston-Galveston Area Council Matthew Martimo, Citilabs.
Integration of Transportation System Analyses in Cube Wade L. White, AICP Citilabs Inc.
NTERFACING THE MORPC REGIONAL MODEL WITH DYNAMIC TRAFFIC SIMULATION INTERFACING THE MORPC REGIONAL MODEL WITH DYNAMIC TRAFFIC SIMULATION David Roden (AECOM)
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY San Francisco’s Dynamic Traffic Assignment Model Background SFCTA DTA Model Peer Review Panel Meeting July.
2007 TRB Transportation Planning Applications Conference – Daytona Beach, Florida Pseudo Dynamic Traffic Assignment A Duration Based Static Assignment.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
Major Transportation Corridor Studies Using an EMME/2 Travel Demand Forecasting Model: The Trans-Lake Washington Study Carlos Espindola, Youssef Dehghani.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY San Francisco DTA Model: Working Model Calibration Part 1: Process Greg Erhardt Dan Tischler Neema Nassir.
S. Erdogan 1, K. Patnam 2, X. Zhou 3, F.D. Ducca 4, S. Mahapatra 5, Z. Deng 6, J. Liu 7 1, 4, 6 University of Maryland, National Center for Smart Growth.
February 8, 2008 SERPM65 vs. SERPM6-Corradino 1 SERPM-6.5 & SERPM-6: Differences & Future Directions Southeast Florida FSUTMS Users Group Meeting Ft. Lauderdale,
Network effects from improved traffic signals Kristina Schmidt Transek AB.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
MATRIX ADJUSTMENT MACRO (DEMADJ.MAC AND DEMADJT.MAC) APPLICATIONS: SEATTLE EXPERIENCE Murli K. Adury Youssef Dehghani Sujay Davuluri Parsons Brinckerhoff.
Transportation leadership you can trust. presented to TRB 11 th Conference on Transportation Planning Applications presented by Dan Goldfarb, P.E. Cambridge.
Integrated Travel Demand Model Challenges and Successes Tim Padgett, P.E., Kimley-Horn Scott Thomson, P.E., KYTC Saleem Salameh, Ph.D., P.E., KYOVA IPC.
Bharath Paladugu TRPC Clyde Scott Independent Consultant
A Dynamic Traffic Simulation Model on Planning Networks Qi Yang Caliper Corporation TRB Planning Application Conference Houston, May 20, 2009.
DVRPC TMIP Peer Review Dynamic Traffic Assignment (DTA) Oct. 29 th, 2014.
June 14th, 2006 Henk Taale Regional Traffic Management Method and Tool.
Comparative Analysis of Traffic and Revenue Risks Associated with Priced Facilities 14 th TRB National Transportation Planning Applications Conference.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Applying Meso-scopic Simulation to Evacuation Planning for the Houston Region Chi Ping Lam, Houston-Galveston Area Council Colby Brown, Citilabs Chris.
SHRP2 Project C05: Final Report to TCC Understanding the Contribution of Operations, Technology, and Design to Meeting Highway Capacity Needs Wayne Kittelson.
CE Urban Transportation Planning and Management Iowa State University Calibration and Adjustment Techniques, Part 1 Source: Calibration and Adjustment.
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
1 Forecasting Traffic for a Start-Up Toll Road 12 th TRB National Transportation Planning Application Conference May 18, 2009 David Schellinger, P.E. Vice.
Transportation Modeling – Opening the Black Box. Agenda 6:00 - 6:05Welcome by Brant Liebmann 6:05 - 6:10 Introductory Context by Mayor Will Toor and Tracy.
METRO Dynamic Traffic Assignment in Action COST Presentation ODOT Region 4 April 1,
Evaluation of Hard Shoulder vs
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
Network Attributes Calculator
Estimating the Traffic Flow Impact of Pedestrians With Limited Data
Jim Henricksen, MnDOT Steve Ruegg, WSP
Presented to 2017 TRB Planning Applications Conference
Ventura County Traffic Model (VCTM) VCTC Update
Jim Lam, Caliper Corporation Guoxiong Huang, SCAG Mark Bradley, BB&C
Presentation transcript:

Developing Evacuation Model using Dynamic Traffic Assignment ChiPing Lam, Houston-Galveston Area Council Dr. Jim Benson, Texas Transportation Institute Peter Mazurek, Citilabs

Motivation  In September 2005, Hurricane Rita landed east of Houston  Well over 1 million people attempted to evacuate from the eight county region  Severe congestion as a results

Retreat!  Evacuation routes became “parking lots”.  Some people spent more than 18 hours on the evacuation routes  Fatal accidents, abandoned cars, and other safety issues

Crawling Speed

In response…  H-GAC coordinated with various governmental agencies to develop a hurricane evacuation plan.  H-GAC was asked to develop a tool for evacuation planning.

Goal of this model  Re-generate the Rita evacuations  Provide evacuation demands  Estimate traffic volumes and delays  Sensitive to various scenarios and plans  Apply to non-evacuation planning (corridor, sub-area, ITS, etc)

Challenge - Model Size  8-county region with 4.7 million population in 2000 and is expected to grow to over 7.7 million by  3000 zones and 43,000 links  7,700 Square miles from CBD to rural area  Around 14,000,000 daily trips modeled  Long trip: average work trip length over 20 minutes, with almost 10% over 40 minutes

Challenge - Demands  Little Survey data for Rita event  Future evacuation demands could be varied in –Time period –Response rate and number of trips –Origin and Destination  Interaction between evacuation, normal daily, and non-evacuation traffic

Challenge - Network  Network change during evacuation  Sensitive to Policy Factors –Contra-flow lane –Shoulder lane use –HOV lane opens to public –Ramp closure –Signal timing  Facilities become unavailable due to flooding, high wind, or other disasters

H-GAC Expectation  Validation –Normal Day Traffic –Rita –Year 2010 Scenario  Able to adjust evacuation trip tables for different situations  Sensitive to policy factors  Allow road changes within evacuation

Estimation Of Hurricane Evacuation Demand Models Jim Benson Texas Transportation Institute

Today’s Presentation  Study Area And Data Base  Trip Generation Models  Trip Distribution Models  Time-of-day Factors

H-GAC Study Area

Houston TranStar Rita Evacuation Survey  Solicited participation on website  Participants responded to questions online  6,570 respondents  6,286 usable household responses  3,886 households evacuated by car or truck

Evacuation Generation Models  Models developed for Rita event  Structured to facilitate exploring different evacuation scenarios

APPROACH  Six-day event modeled  Cross-classification variables: –6 geographical districts –5 household size groups  Production models: –Probability of evacuating –Vehicle trips/evacuation household –Trip purpose split  Simple attraction models  Non-resident trip models

Six Districts

Internal Evacuation Attractions Households83.3% Hotels & Motels8.4% Public Shelter2.0% Other6.3%

External Station Evacuation Attractions  Distributed attractions to other urban areas based on their population and relative accessibility  Allocated results to external stations

Rita Evacuation Generation Results Internal-Internal218,785 Internal-External1,040,936 External-Internal (non-residents) 5,406 External-External (non-residents) 21,617

Two Trip Distribution Models  Evacuation trips to internal zones  Evacuation trips to external stations

Distribution Model For Internal Attractions  Essentially a “constrained interactance” model  No friction factors  No iterative process  Constrained to productions  Interaction constraint  Productions allocated to eligible attraction zones based on relative attractiveness

Interaction Constraint  No attractions to zones in the 3 mandatory evacuation areas  Eligible attraction zones must be either: –Further from the coast, OR –80+ miles from the coast

Zones By Distance From Coast

Distribution Model For External Station Attractions  Similar to traditional external-local models using a gravity model  Primary difference is that the external stations are treated the attractions  Somewhat relaxed version of the normal external-local friction factors used

TRIP DISTRIBUTION RESULTS (normal off-peak speed travel time minutes) Trip Purpose Trips Average Trip Length 90 th %-tile Trip Length Max Trip Length Trips to Internal Zones 224, Trips to External Stations 1,062, All Evacuation Trips 1,286,

Time-of-day Factors  Estimated from survey data  Developed for each of the six districts  Hourly Distribution for 6-day Event

Developing Alternative Scenarios  Consider adjustments to % households evacuating by district  Consider adjusting hourly distributions by district  Consider adjusting vehicle trip rates to reflect taking fewer vehicles by district

Next Step is Assignment….

Evacuation Model Development using Cube Avenue Pete Mazurek Director of Consulting Services Citilabs, Inc.

Input Parameter Types  Tool for Evacuation/Event Planning  Needs to be sensitive to variations in THREE distinct types of inputs: –Situational (Event-Specific) parameters –Policy Change Inputs –System and Background Inputs

Two Stages of The Evacuation Model Tool

System Demand Profile  Background Demand –Everyday, regular “average weekday” trips –Stratified by hour for a 24-hour period –3 successive weekday periods to comprise 72-hours prior to storm landfall –Progressively attenuated because regular trips are not taken once people evacuate  Evacuation Demand –The primary trip out of the storm’s path –Stratified by hour for 72 hours prior to landfall

Dynamic Traffic Assignment (DTA)  Method of system-level (regional) assignment analysis which seeks to track the progress of a trip through the regional network over time  Accounts for buildup of queues due to congestion and/or incidents  A bridge between traditional region-level static assignment and corridor-level micro- simulation

Why use DTA?  Why NOT use traditional (Static) assignment? –No impact of queues –No ability to deal with upstream impacts –Links do not directly affect each other –Not conducive to time-series analysis  Why NOT use traffic micro-simulation? –Study area of interest too large and complex –Too much data and memory required –Too many uncertainties to model accurately

Cube Avenue (DTA Module)  Add-on module to provide DTA capability for the Cube/ Cube Voyager model environment  Cube User Interface  Works with regional network in Cube Voyager  Common scripting language and data requirements  First full release of Cube Avenue works with latest version of Cube Voyager (4.1)

Cube Avenue Technical Facts  Unit of travel is the “packet” –Represents some number of vehicles traveling from same Origin to same Destination  Link travel time/speed is a function of –Link capacity –Queue storage capacity –Whether downstream links “block back” their queues  Link volumes are counted in the time period when a packet leaves the link

Houston Evacuation DTA: Existing models and data  Tool is an add-on to existing H-GAC travel demand model in Cube –Basic highway networks from regional model –Adjustments to network based on event parameters –Network modifications may vary across time horizon of event Flooding of low-lying links Failure/closure of facilities Reversal of freeway lanes

Houston Evacuation DTA Networks  Network from regional model  Coding adjustments –Centroid adjustment in downtown –Capacity and Storage Adjustment –Network Simplification Link Reduction Centroid Connectors –Turning Movements/Prohibitions –Intersection definition

72 x 1-hour Assignments?  Entire 3-day storm approach window  Individual 1-hour slices allows network changes  What do we mean by 1-hour slice? –1-hour period of “analysis” from which results are reported –Additional 1+ hour period of warmup (“pre-load”) whereby trips are loaded onto the network –Ensures that trips in analysis period see and respond to full-load conditions

Houston Evacuation DTA Challenges  Long trip lengths  Memory Limitation  Ramp and freeway coding  Long Running Time

Challenges: Long Trip Lengths  Houston is a huge region  Background trips >1 hour not uncommon  In evacuation conditions, –~95% of trips are longer than 1 hour –~45% of trips are longer than 3 hours  Longer “pre-load” to ensure maximum number of trips have a chance to complete their trip in the analysis period.

Long Evacuation Trip Lengths

Challenges: Memory Limitations  Large dimensions of problem size  Windows XP maximum memory for a single process is 2GB  Limits the number of pre-load hours and iterations possible  Network Simplification, reduce pre-load period and iterations  Wait for Windows “Vista” 64-bit

Challenges: Ramp and Freeway Coding  Texas style slip-ramps  Networks are coded with Freeways and Frontage roads separated  Link coding codes through lanes but not accel/decel lanes  Storage capacity not accurately reflected by default coding

Ramp and Freeway Coding

Challenges: Ramp and Freeway Coding  Ramp storage capacity as-coded was minimal  Queues from downstream intersections  Queues block back onto mainline freeway lanes too frequently  All mainline lanes have equal impact upon queue blockback  Make ramp storage capacity large

Challenges: Long Running Times  Simulations take hours to run one hour of simulation (with pre-load)  X hours x 72 time periods => Long time  Makes it difficult to test different tweaks  Faster computer (processor/memory/hard drive)  Wait for Windows “Vista” (64-bit)  Capability to run selected hours only  Cube Cluster distributed processing (future)

Next Steps/Still to Do  Refine application and verify software performance  Code intersections more explicitly  Integrate attenuation of background demand  Integrate evacuation demand  Validate against known event speed/time data  Re-visit time-of-day factors

Thank You Peter Mazurek Director of Consulting Services Citilabs, Inc 222 Prince George St, Suite 100 Annapolis, MD (410)

Current Progress  Developed hourly trip tables for normal daily traffic  Developed Rita evacuation demand trip table for entire 72-hours period  Validating normal daily scenarios –Show directional speed difference in peak period –VMT and speeds  Simplified network

Future Steps  Modify trip generation and distribution models to adopt different evacuation scenarios  Integrate normal daily and evacuation traffic to replicate Rita scenario  Coding traffic signals and other traffic control devices  Allow policy and environmental factors to change the network at specified time  Randomly generate accidents

Questions ??????

END