The South Florida Watershed

Slides:



Advertisements
Similar presentations
Everglades Restoration A Program for Integrated Regional Management
Advertisements

Flood the Sugar Cane Farms Now to Save the Estuaries: Is This Feasible ? Water Resources Advisory Commission January 5, 2006 Meeting.
The Central and Southern Florida Project Conceived by Florida Built by the Corps Integrates a Large Dynamic Economy and Multiple Valuable Ecosystems How.
US Army Corps of Engineers BUILDING STRONG ® SAME Tampa Post - JOINT TRAINING and EDUCATION DAY Alan M. Dodd District Commander US Army Corps of Engineers,
Don Edwards San Francisco Bay National Wildlife Refuge Where Wildlife Comes First!
Florida Water Forum Everglades Restoration June 3, 2011.
Preparing for the Rainy Season SFWMD Operations & Actions.
South Florida Ecosystem Restoration Task Force Strategic Goals and Objectives Update Presentation to the Water Resources Advisory Commission Strategic.
Estimated Length: 2 Hours Introduction Study Area and Environmental Issues Relating Land Use and Water Quality Exercise A Brainstorm Data Exercise B Choose.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
Imperial River: Water Quality Status and Basin Management Action Plan.
C51 RESERVOIR PROJECT UPDATE Design, Permitting and Coordination NOVEMBER 10, 2014.
Comprehensive Everglades Restoration Plan Picayune Strand Restoration Project Janet Starnes, Principal Project Manager Office of Everglades Policy and.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
National Park Service - DOI Everglades National Park Everglades Restoration Update: Water Quality, Central Everglades and Tamiami Trail Next Steps Project.
Kissimmee-Okeechobee Everglades (KOE) Watershed
Naples Bay Surface Water Improvement and Management (SWIM) Plan
Historical Context: How has the Caloosahatchee River/Estuary been altered? How does it fit within the broader system? Michael L. Parsons Coastal Watershed.
Drought and the Central Valley Project August 2014.
Florida Department of Environmental Protection Watershed Assessment 2015 Strategic Monitoring in the Florida Keys DEAR- Water Quality Assessment Program.
Of America’s Everglades & the South Florida Ecosystem the Restoration.
WaterSMART Basin Study Program. SECURE Water Act Section 9503 Directs the Secretary to establish a climate change adaptation program which includes –Assess.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
Acme Basin B Discharge Public Workshop May 22, 2002 COMPREHENSIVE EVERGLADES RESTORATION PLAN.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
St. Lucie and Indian River Counties Water Resource Study Mark Elsner, P.E., Director Water Supply Development Division Mark Elsner, P.E., Director Water.
The South Florida Region and its Water Management System Linda Lindstrom, P.G. Director Environmental Resource Assessment Department South Florida Water.
U.S. Army Corps of Engineers In partnership with the South Florida Water Management District Water Management in South Florida.
Water Resources Advisory Commission January 5, 2006.
“Getting the Funding Right” Kim Koleos Juris Doctor, University of Florida.
Everglades Land Acquisition Project Carol Ann Wehle SFWMD Executive Director.
Loxahatchee River Watershed Overview 1 st river in Florida designated as a National Wild & Scenic River 1 st river in Florida designated as a National.
WRAC Issues Workshop EAA/STA-2 Expansion Cell 4 April 11, 2005 Acceler8 Overview.
South Florida Everglades Historically: Free-flowing ‘river of grass’ extending from the Kissimmee chain of lakes to Florida Bay. Since late 1800s: Construction.
Water Resources Advisory Commission Lake Okeechobee Committee January 25, 2006 Susan Gray, Ph.D.
Summary of Everglades Restoration NoteLocation Emvalue (Billions Em$/yr) 1 Annual total Em$ Everglades System Net increase in emergy value of Env.
PICAYUNE STRAND RESTORATION PROJECT PUMP STATIONS PRELIMINARY DESIGN South Florida Water Management District Water Resources Advisory Committee April 6,
Climate Change and Water Resources Planning Kim Shugar Department Director Intergovernmental Programs Kim Shugar Department Director Intergovernmental.
Click to edit section. Needs for a Stormwater Management Program NFIP/CRS Emergency Response Flood Protection TMDLs Water Quality NPDES Development Review.
A Vision for the Future Presented to the North Bay Watershed Association by the Sonoma County Water Agency and Zone 7 Water Agency.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Everglades Land Acquisition Project Michael Sole - Carol Wehle - Dale Brill.
Lake Jesup BMAP Adoption Environmental Protection Division February 23, 2010.
Regional Water Availability Rulemaking Chip Merriam Water Resources Advisory Commission February 8, 2007 Chip Merriam Water Resources Advisory Commission.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
WRAC Acme Basin B Discharge Project February 2, 2006.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Total Maximum Daily Load (TMDL) Program Lake Jesup Basin Management Action Plan (BMAP) Environmental Protection Division September 1, 2009.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Proposed Revisions to the Long-Term Plan Long-Term Plan Communications Meeting August 25, 2004 Gary Goforth Chief Consulting Engineer South Florida Water.
September 18, 2002 Master Recreation Plan Team Kick-Off Meeting Comprehensive Everglades Restoration Plan.
The Lake Okeechobee Protection Plan Evaluation Update, 2007 The Lake Okeechobee Protection Plan Evaluation Update February 8, 2007.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
South Florida Ecosystem Restoration Projects 1. Seminole Big Cypress 3. Modified Water Deliveries 5. C-111 South Dade 10. C-111 Spreader Canal 13. Broward.
Central Florida Water Initiative 6 recommendations for getting the water right.
Nutrients and the Next Generation of Conservation Presented by: Tom Porta, P.E. Deputy Administrator Nevada Division of Environmental Protection President,
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
“ To provide leadership to help people conserve, improve, and sustain the natural resources and environment of Highlands County”
Upper St. Johns River Basin Project US Army Corps of Engineers A joint project between the St. Johns River Water Management District and the Jacksonville.
Lessons Learned from Everglades Restoration Julie A. Hill Everglades Policy Associate.
NACD 2010 Orlando Everglades Restoration: Plans, Progress, and Partnerships3.
C ALOOSAHATCHEE & E VERGLADES R ESTORATION Jennifer Hecker, Director of Natural Resource Policy.
Water Resource Management Planning Update
Florida Water Forum Springs and Estuaries Drew Bartlett
Water Resource Management Planning Update
Best Management Practices (BMP) Program
Central District overview and the 2016 Water Bill
Presentation transcript:

The South Florida Watershed Kevin Carter, Office of Everglades Policy and Coordination, South Florida Water Management District kecarter@sfwmd.gov, phone: 561-682-6949 Our Florida Reefs Community Working Group Meetings April 22nd and April 28th, 2014

Presentation Overview Central & South Florida Flood Control System (CS+F): History, Scale, and Complexity Restoration at the Watershed Scale: CERP, Comprehensive Everglades Restoration Plan CEPP, Central Everglades Planning Project RS, Restoration Strategies NEEPP, Northern Everglades + Estuaries Protection Program (hint: you will learn these acronyms, test at the end )

What does the term Watershed mean to you? “In the continental US, there are 2,110 watersheds; including Hawaii Alaska, and Puerto Rico, there are 2,267 watersheds” http://water.epa.gov/type/watersheds/whatis.cfm Photo from http://www.nsrwa.org/Page.121.html

The South Florida Watershed Current The South Florida Watershed Historic

Historical Events Leading to Construction of C&SF Project Hurricanes in 1926 and 1928 resulted in failure of the levee around Lake Okeechobee Lower East Coast drought (1931 – 1945) and saltwater intrusion threat Hurricane in 1947 resulted in wide-spread flooding throughout South Florida State of Florida requested Federal assistance in 1947 Congress authorized the C&SF Project in 1948 Areas Flooded in the 1947 Storm

Today’s SFWMD Lands stretch 240 miles from Orlando to the Keys 18,000 sq. miles, encompassing one of the most diverse ecosystems in the world ~2,000 miles of canals ~2,800 miles of levees More than 650 water control structures and 700 project culverts Nearly 70 pump stations 7.7 million residents More than 3 million acres of agriculture Protected/Managed natural areas www.sfwmd.gov

SFWMD Core Mission Five Water Management Districts were created by 1972 Water Resources Act: Flood Control Operate & maintain largest water management system in the world Water Supply Ensure sustainable water resources for South Florida’s environment and economy Natural Systems Protect and restore the Northern and Southern Everglades Water Quality Improve water quality in the Everglades 7

Future South Florida Watershed: Increasing Flows to the South Managed Flows (circa 2010) Pre-drainage Flows

Future South Florida Watershed: Increasing Flows to South (cont.) Quality Quantity Timing Distribution

CERP: A Very Brief Background 1999 – Florida Legislature gives SFWMD authority to act as local sponsor for all portions of C&SF 1999: The C+SF Restudy submitted to Congress; comprehensive plan with more than 60 components 2000: Florida Legislature passes act to fund the state’s 50% cost-share 2000: Federal Water Resources Development Act 2000: Approves CERP as a framework for modifying the C&SF project Authorizes 50-50 cost-share for CERP implementation and O&M Requires approval of Project Implementation Report for each project Rescuing an Endangered Ecosystem: The Plan to Restore America’s Everglades July 1999 The Central and Southern Florida Project Comprehensive Review Study (The Restudy)

CERP Projects Pre-CERP Foundation Projects 1st Generation CERP Picayune Strand IRL-South Site 1 Impoundment Pre-CERP Foundation Projects Kissimmee River C-111 South Dade Modified Water Deliveries 2nd Generation CERP C-43 Reservoir Broward County WPA C-111 Spreader Canal Biscayne Bay Coastal Wetlands Nearing Completion Under Construction Pending Congressional Authorization 3rd Generation CERP Central Everglades Planning Project Loxahatchee River Watershed Restoration Project Project Planning http://www.evergladesplan.org/

Central Everglades Planning Project (CEPP) Increases storage, treatment and conveyance of water south of Lake Okeechobee Sends ~200,000 ac-ft of water south from the Lake Removes and/or plugs canals and levees within the central Everglades Improves hydroperiod and flow through Everglades National Park while protecting urban and agricultural areas to the east from flooding 12

http://www.sfwmd.gov/portal/page/portal/xweb%20protecting%20and%20restoring/restoration%20strategies 13

Northern Everglades & Estuaries Protection Program (NEEPP) Foundation for the Northern Everglades and Estuaries Protection Program (NEEPP, 373.4595 Florida Statutes): Defines the three Coordinating Agencies: SFWMD, Florida Department of Agriculture and Consumer Services (FDACS), and Florida Department of Environmental Protection (FDEP) Watershed Protection Plans: Holistic watershed approach to restoration Suite of projects and programs to improve the quality of water discharged from the watersheds and minimize undesirable flows 14

NEEPP: Example Projects Kissimmee River Restoration Lake Okeechobee Watershed IRL-S Project St. Lucie Watershed C-43 West Basin Storage Reservoir Caloosahatchee Watershed Dispersed Water Management 15 http://my.sfwmd.gov/portal/page/portal/xweb%20protecting%20and%20restoring/other%20everglades

NEEPP and Water Quality Restoration FDEP leads water quality restoration with its Total Maximum Daily Load Program (TMDL) FDEP collaborates with SFWMD, FDACS and local stakeholders Basin Management Action Plans (BMAPs) map the path forward for TMDL implementation: St. Lucie and Caloosahatchee Estuaries, 1st phase BMAPs underway Lake Okeechobee BMAP in planning phase http://www.dep.state.fl.us/water/watersheds/bmap.htm

Florida Senate Select Committee on Indian River Lagoon and Lake Okeechobee Basin The Committee, created on July 10, 2013 and led by Senator Joe Negron, has conducted hearings to: Review water management policies and activities Assess the impact of Lake releases on the St. Lucie Estuary Identify options to improve basin wide water management, including alternatives to Lake discharges Develop recommendations (short and long term) for improved water management A Committee report was submitted November 4, 2013, to the Senate Committees on Appropriations, Environmental Preservation, and Agriculture http://www.flsenate.gov/Media/Topics/irllob

Office of Everglades Policy and Coordination Discussion and Contact Information Kevin Carter, Office of Everglades Policy and Coordination South Florida Water Management District kecarter@sfwmd.gov, phone: 561-682-6949