2009 Hurricane Prep (What's The Same) Generator tests Personnel lists Fuel Emergency Equipment.

Slides:



Advertisements
Similar presentations
Lee County Electric Cooperative 2006 Hurricane Preparedness Plan.
Advertisements

Birdfield Building Services is an institution that has an experience as commercial building contractor, specializing in construction, property maintenance.
Hurricane Sandy. Sandy was the second-largest Atlantic storm on record Storm surge reached over 13 feet in coastal areas of New York and New Jersey The.
Preventing Equipment Failures
Environmental Science Chapter 11 Notes #2. Review Nonrenewable resources Renewable Resources Fossil Fuels The energy of fossil fuels is most commonly.
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Utility Management Providence Health System - Oregon Environment of Care.
Mark Williams Facilities Engineering Manger Mike Joyner Project Manager - Power Services.
Facilities Management Post Hurricane Building Assessment and Recovery June 28, 2007.
Join the conference call by dialing the conference number in your Invitation or Reminder s. Please put your phone on mute. Please stand by! The webinar.
Bruce H. Lee Project Director Joint Venture: Silicon Valley Network.
Disaster Scenario Exercise for Organizational Planning Major Hurricane w/ Coastal and Inland Flooding & Tornadoes FEMA 2010 EXERCISE EXERCISE EXERCISE.
Safety on Campus Roy Schifilliti
Achieving Greater Success in Emergency Management by Preparing & Planning with Public Works.
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
©2012 Doble Engineering Company. All Rights Reserved Transformer Life Extension and Adaptation to New Uses 2013 Power Forum Istanbul October 2013.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
Cooling Contingency Planning. What is Contingency Planning At its core contingency planning is about identifying risk and finding ways to mitigate it…
Implementing HAZUS-MH in Pre-Disaster Mitigation
ELECTRICAL CRITICAL INFRASTRUCTURE SECURITY Charles Hookham, P.E., M.ASCE, VP, Utility Projects HDR Engineering 1.
© Business & Legal Reports, Inc Alabama Retail is committed to partnering with our members to create and keep safe workplaces. Be sure to check out.
BLACKOUT POWER OUTAGE By Masih Madayeni Class 3/6 English Presentation.
Air Pollution Sources: Coal-Fired Power Plants April 13, 2011.
FY Budget Presentation to Board of Finance March 17, 2014 Maintenance Division Kevin Murray, Operations Manager Parks & Facilities.
CUSTOM CLIENT COVER. The Situation Rapid Establishment of Command, Control and Communications (C3) Supports: Life Safety Incident Stabilization Protection.
Department of Homeland Security Federal Emergency Management Agency Region II - Caribbean Area Division.
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
What can be done to increase the use of solar cells in Japan? Kazuhei Matsubara.
ESF #3 – Public Works and Engineering IS-803 – February 2009 Visual 1 Public Works and Engineering ESF #3.
Catastrophe Readiness and Response Session 7b 1 Session 7b Critical Infrastructure Drew Bumbak.
1 CRITICAL ROTATING EQUIPMENT CRITICAL ROTATING EQUIPMENT PACKAGES – 12 FOR POWER GENERATION INCLUDING STEAM TURBINES and 14 FOR GAS COMPRESSION.
The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.
Bay Area Earthquake Impacts and Earthquake Impacts on Utilities and Transportation Systems Infrastructure Interdependencies Workshop I – Utilities and.
RESILIENCY IN TIMES OF DISASTER William M. Lokey Program Director Witt Associates Strengthening Community Resilience.
By Josh J. In order to generate electricity we have to make a turbine spin. To do that we need to extract super-heated.
FLOODING OVERVIEW FLOWCHART
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
1 Session 7, Section 2 Critical Infrastructure Drew Bumbak.
NFPA 704 Fire Diamond signs-labels.html.
Diesel Emissions Regulation and Control Impact of ARB Regulation.
Red Simpson, Inc. - who are we? Powerline Contractors – build & maintain high Powerline Contractors – build & maintain high voltage lines, overhead & underground.
Module 3: Planning and Response. 2 Objective Upon the successful completion of this module, participants will be able to develop strategies for preplanning.
EE4503 Electrical Systems Design
Continuity of Operations (COOP) Planning Guidelines for Dukes County.
What is Emergency ?. A serious situation or occurrence that happens unexpectedly and demands immediate action.
CURRENT CONDITION HURCON 1 ****PREPPED FOR HURRICANE**** Destructive Winds of 50 Knots (58mph) or greater are possible within 12 hours. BRIEF UNIT PERSONNEL.
Power Plant Construction and QA/QC Section 5.3 – Turbine and Engine Governors Engineering Technology Division.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
EXERCISE SEP 2015 Jakarta, Indonesia
2015 Hurricane Season Preparedness Briefing Jorge Puentes Engineering Manager – Northeast and Northwest Divisions March 18, 2015.
August 21, hrs. SEOC LEVEL 1 Activation.
Lesson 10: The National Grid.  MUST understand that electricity is transmitted through the National Grid  SHOULD understand why electricity is transmitted.
SITE EMERGENCY RESPONSE All sites are different. Different chemicals. Different configurations. Advance planning and training is necessary to protect worker.
Personal details: ENG.Iqbal AL-tayyar Bachelor in Mechanical Engineering from Kuwait university. Director of Technical Supervision Department. Applied.
Houston Area: Baltimore (81) Baltimore (81) Boston (48) Boston (48) Pittsburgh (56) Pittsburgh (56) San Francisco (47) San Francisco (47) Denver (153)
Logo Here 1 This slide deck has been designed for the Rhode Island Department of Health as apart of the Senior Resiliency Project. The intent of this training.
Central Houston, Inc. Houston Downtown Management District 909 Fanin, Suite 1650 Houston, Texas / Operations
Pipeline Safety Management Systems
UTILITIES MANAGEMENT.
SERVICES, LLC 1 1.
HAZWOPER Operations Level.
2016 Mutual Aid Drill August 30 - September 1, 2016
Progress Energy Florida 2006 Hurricane Preparedness Florida PSC Internal Affairs Meeting June 5, 2006.
COMPANY NAME Business Continuity Plan Date Presented by.
Disaster Preparedness

Effects of Disasters on Wastewater Treatment and Collection Systems
NAJMA AL KARAMA ELECTRICAL EQUIPMENT REPAIRING DUBAI
Presentation transcript:

2009 Hurricane Prep (What's The Same) Generator tests Personnel lists Fuel Emergency Equipment

2009 Hurricane Prep (What We learned) Staged equipment is at risk We need basic services for first responders We need to be able to move water and fuel We need Staging areas for equipment and contractors

2009 Hurricane Prep (Where we Are) Main systems restored in a temporary manner, mitigation planning in progress. Steam 70 % Chilled Water 80% Electrical Distribution 100% (Subject to latent failures and reduced capability) Plug in only what is absolutely necessary to emergency power Failures to these systems this year will be much more catastrophic in nature lasting longer and temporary repairs will be much more difficult.