December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.

Slides:



Advertisements
Similar presentations
Meridian Road Interchange Rebuild ITD Board Meeting June 18, 2009.
Advertisements

Hazel Grove Car Park Proposals Overview Transport for Greater Manchester (TfGM) is developing plans to provide over 100 additional car parking spaces at.
Salt River Pima-Maricopa Indian Community Community Development Department ZONING ORDINANCE AND DESIGN UPDATE (ZODU) Sustainable Land Use, Culturally Influenced.
Ladd Arboretum Multiuse Trail Council Presentation Monday, March 10, 2014 Suzette Robinson, Director of Public Works Homayoon Pirooz, P.E., Assistant Director.
Pittsford :: Erie Canal Area Master Plan Public Workshop Welcome! Thank you for being here May 26, 2010 This presentation was prepared for the New York.
Examples of Context Sensitive Solutions in an Urban Environment ITD Project Development Conference April 7, 2005 Doug Camenisch, P.E. Parametrix.
WHAT IS A RIVER? A river is a natural watercourse, usually freshwater, flowing towards an ocean, a lake, a sea, or another river.
An Urban Desert Park Tucson, Az Lee Eubank, Fall 2013 Broadway Euclid N.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
York Region’s Pedestrian and Cycling Municipal Partnership Program Presentation to 2014 Sustainable Mobility and Healthy Communities Summit ACT Canada.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
The Great Rivers Greenway District.
COCONINO PARKS AND OPEN SPACE PROGRAM Presented by Coconino County Parks and Recreation.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Bike Routes and Pedestrian Routes. Bike Route Goals Create a safe route through the city Connecting parks, schools, and subdivisions Raise awareness of.
CFTE Transit Initiatives Conference: What We Can Learn From Recent Campaigns Tempe, AZ December 8, 2003.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
City of Salem Streets and Bridges 539 miles of paved streets 53 bridges 263 signalized intersections 195 school zone flashers 7,100 street lights 125,000.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
11/01/04 - DRAFT1 King Bridge Partnership A partnership of The Kingfield and Bryant Neighborhood Organizations.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
CITY COUNCIL GOALS & OBJECTIVES. TOP PRIORITY Street Valley Gutters 33 installed by Public Works 35 installed by contractor Pipe Replacement Program.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
In association with: 73 rd Street to Indian Bend Wash Bridge THOMAS ROAD STREETSCAPE 73 RD STREET TO INDIAN BEND WASH BRIDGE PROJECT NO. T0606 City of.
Councilmember Dave Richins Mesa, Arizona.  The Central Mesa Extension of the Light Rail is a 3.1 mile extension that will run from the Sycamore Station.
Andrea Sauer, Project Coordinator Healthy Kids, Healthy Communities Grant County, New Mexico.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
Community Development Department Construction Phase.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
Phase 2: 30% Design Plans September 4 th, 2012.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Planning for the Waller Creek District Oklahoma City Chamber of Commerce Delegation April 4, 2013.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
E.B. 2,3 de Mundão Made by: - Patrícia Loureiro nº16 - Sara Coelho nº18 9ºD Places.
Grand Canalscape Phase I and II General Update October 30, 2015.
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
McKellar Park Information Session
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
MED SR 18 Corridor Project MED PID October 13, 2015.
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
Valley Metro Update Open House and Public Hearing March 9, 2007.
Indian Bend Wash Extension and Connection Trail Presented by Doug Sydnor and Jason Rose.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
A DD AND N OT S UBTRACT The Story of Sunnyside Pedestrian Mall Rae Mindock, EHS Support A ND A GAIN.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
River Walk & Water Transportation System Imagination – Innovation - Creation November 2, 2011 Wasser Strasse & Transportainment TM.
Arizona Forward Update
Healthy Communities & Sustainable Growth
Council for Quality Growth North Fulton Advisory Meeting
Connecting the City: Building the Dallas Trail Network
Project Status & Right-of-Way Acquisition
Arizona State song: The Arizona March Song State flower: Saguaro
Campus Construction Projects
Texas Department of Transportation
Early Voting Starts Oct. 20 | Election Day Nov
Woodinville-Duvall Road Widening Project Update
Good afternoon. Thank you for attending the 2013 Arizona Transit Association conference. I hope that you found the sessions valuable and have enjoyed your.
NCDA Winter Legislative & Policy Meeting January 20, 2016
Chain Of Lakes Running Trails Directions You are here
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Commissioners Presentation
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

December 6, 2012 Public Meeting

AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to the Indian Bend Wash  Project also includes:  Pedestrian Bridges  Neighborhood Connections  Landscaping  Lighting  Public Art

AZ Canal Multiuse Path  Enhance mobility for bicyclists and pedestrians throughout the region  Provide connectivity to Papago Park, the Phoenix Zoo, the Desert Botanical Gardens, Tempe Town Lake and the Indian Bend Wash path system  The cities of Tempe, Phoenix and Scottsdale have been working to complete a 17-mile regional pathway system  Once constructed, this project will complete Scottsdale’s portion of the 17-mile loop  Total Project Budget of approximately $4M

 Project Team  Olsson Associates and Jody Pinto  Partnership between the City of Scottsdale, Salt River Project and Scottsdale Public Art  Includes Federally Funding  Congestion Mitigation and Air Quality Funds  Follow the Federal Process  Required Clearances  Min. 2 year Design Process AZ Canal Multiuse Path

 Next Steps  Develop Master Plan and Artist concepts  Second Public Meeting – Winter 2013  Design Review Board – Winter/Spring 2013  Project Schedule  Complete design – Summer 2014  Start construction – Fall 2014 AZ Canal Multiuse Path