The story of Preactor at Universal Products Tim Buck Steve Littlewood Contact: SUN Meeting Dec 9 th.

Slides:



Advertisements
Similar presentations
International Alert Users Association Conference November 10-12, 2011 Jeffrey Knoepke Preventive Maintenance System.
Advertisements

order management software for web, mail order & b2b sales Integrated B2B Sales & Mail Order Software Enter sales, quotation, e-commerce.
ITSF STORE BUSINESS SOLUTION PRESENTATION. STORE MODULE INCLUDES: Material Management Purchasing Components Handling Shipments Receiving of parts Store.
Micro Control Solutions Stability System II rev. 6.4
Sunday Business Systems Asset Tracking Database Control Calibrated Equipment Manage Preventive Maintenance Maintenance Tracking.
Using XA Browser/Power-Link Preferences to Improve Efficiency
09/04/2015Unit 2 (b) Back-Office processes Unit 2 Assessment Criteria (b) 10 marks.
REP: Reports and Enquiries Pack for Sage Line 500 & 1000 User Guide Version Supply – Demand & MRP PFS WO Trial Kit – Single WO WO Trial Kit Shortages.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
SalesPad SalesPad delivers an all-in-one order entry, inventory and sales management solution integrate seamlessly with Dynamics GP SalesPad simplifies.
Inventory, job costing, manufacturing service and distribution Ostendo® adds advanced Add-on solution for MYOB, Quickbooks and Sage OSTENDO.
ServiceLink Direct From Walker Martyn Software Ltd.
SQL Reporting Services SSRS Presentation for Sage User Network Sept 11 th 2008.
SuttonDirect Sutton Planner Version 2.0. Sutton Planner Primarily designed for make to order / engineer to order environments Benefits ANY environment.
Slack, Chambers and Johnston, Operations Management, 6 th Edition, © Nigel Slack, Stuart Chambers, and Robert Johnston Chapter 10 The nature.
The Production Process
High Lights of SAP Business One for Manufacturing.
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Module 10 Setup for Production.
9 C H A P T E R Transaction Processing and Enterprise Resource Planning Systems.
Increase Your Manufacturing Efficiency with QAD’s Planning and Scheduling Workbenches Gary Wasserman – Applications Specialist.
Production Scheduling: What Tool is Right for You?
Accelerated Computer Technologies Company Overview.
November 11 th 2013 Preactor and Sage ERP integrated as never before. Defacto Solutions Limited sl-ect Limited.
Geosoft Systems Ltd. KITARON ERP&MES WISE MANAGEMENT
13 APS. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any.
Sage User Network Sage Auditing Presentation September 17 th
Gaining World Class Competitiveness In Mfg. Using SAP’s Mfg. Integration & Intelligence Platform Metals Mfg. Demo.
Starter Kit. Starter kit Production : Cut operations receiving ECN (Eng. Change Notice) Auto copy to prod orders details Shop floor reporting Generic.
Integrate your people maximize your knowledge Tel SalesBase Customer.
1 Part III Performance evaluation and design of manufacturing systems.
SAGE USER ODI MAY 15 TH 2013 Defacto Solutions Limited sl-ect Limited.
Production and supply chain process MIS2101: Management Information Systems Based on material developed by C.J. Marselis.
Introduction to our On-Line Self Service Center at
New Tools to Increase Sales And to Enhance The User Experience.
2014 Reliance Manufacturers Rep Meeting AGENDA: Customer Relations Overview Manufacturers Rep Expectations Overview Quarterly Review Discussion Commission.
Chapter 4. Chapter 4 Learning Objectives Describe steps in the production planning process of a high volume manufacturer like Fitter Snacker Describe.
Master Scheduling Chapter 3.
Operational Excellence Demand Management and Master Scheduling.
Collaboration among sales, production, planning, purchasing, maintenance and management to positively impact the bottom line.
©2008 TTW Where “Lean” principles are considered common sense and are implemented with a passion! Product Training Inventory Transactions.
How to Sell Manufacturing Foundation Presenter. Agenda What is Microsoft Navision Manufacturing Foundation? Naming Positioning Why We Enhanced Our Manufacturing.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
A tour of the integration between Macola ES / Progression and Preactor V11 Preactor.
© The Delos Partnership 2007 page 1 Supply Chain Techniques Getting the plan executed.
Sage User Network The Sage February 22nd
Activity Scheduling and Control
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
©2008 TTW Where “Lean” principles are considered common sense and are implemented with a passion! Product Training Manufacturing Orders.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Master Production Scheduling (MPS) Slide Set #9.
Material Requirements Planning
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Upturn Consulting 27, March 2017.
AXUG Partner Showcase – Introducing Preactor
Wholesale Distributors Campaign Briefing
Make-to-Stock Scenario Overview
MRP: Material Resource Planning
Facility Portal and Work Order Manager
About Xperdyte Xperdyte, the software solution tailor-made for the South African Manufacturer. This comprehensive solution addresses all the critical.
Make-to-Stock Scenario Overview
When You Can See It, You Can Believe It.
Reserved for Intro Picture
Material Requirements Planning (MRP)
Kanban Replenishment for All Types of Industries
K3 Logistics Extensions K3 Production Extensions
MS Dynamics NAV – nothing simpler
Purge-it! USP's, pre-sales process & helping the customer to decide
Using SHOPFLOOR to PLAN and EXECUTE PAPERLESS
King Saud University College of Engineering IE – 462: “Industrial Information Systems” Fall – 2018 (1st Sem H) Introduction (Chapter 1) part.
Set Up For Success : Reviewing Manufacturing Best Practices
Presentation transcript:

The story of Preactor at Universal Products Tim Buck Steve Littlewood Contact: SUN Meeting Dec 9 th 2008

Contract manufacturer of Liquid Pharmaceuticals and Toiletries. Shampoos, Shower Gels and Cough Mixtures. Make to order. Customers often supply packaging materials and labels. So it is important to tell our customers 2 things: 1.Delivery dates for the finished goods 2.Dates when the packaging is required 2 processes. Bulk Liquid  Filling Lines. The factory is planned for internal efficiencies and customer satisfaction. The factory plan is made and passed to the purchasing department who are expected to source the materials to match the plan. What do we do at UPL?

Originally we used Excel. This had its limitations. Then we used MS Project, but this had no links to Sage so we were duplicating data entry. And we had one project document for bulk liquid manufacture and one for the filling lines, so it was difficult to see if the overall plan was valid. So we felt that it wasn’t the right tool for the job. It is more suited to engineering projects etc. The purchasing department were really struggling to know when materials were really needed, so they had to keep high buffer stocks. MRP for purchasing could only use the manufacturing lead times from the stock file. The following slides illustrate this problem..... The Problems

MRP says “Raise New PO” here The MRP and Lead Times Problem MC1 MC2 Late WO1 WO2 In the real world the PO is needed here The existing work load shows a bottleneck Mfg Lead Time= 7 days WO1WO2 Order Due 30/1/9 Mfg Lead Time= 14 days Start 23/1/9 Start 9/1/9 New Sales Order with 2 x BOM levels SO Hours Work

So the solution is that from Preactor we update the WO Lines with the realistic planned start dates, and then run a purchasing MRP. The buyers tell production if they can’t achieve the requirements. Yes we look to be bringing stock in earlier and it may end up sat in WIP or in the FG warehouse waiting to be despatched. But there will also be other orders that may be planned to start later than the lead times would suggest, so the purchased stock is more “just in time” than it would be using simple lead times. It all depends on whether our planning policy is to reduce WIP or to satisfy customers. Both would be nice! This process is in fact used to set the initial promise dates to the customer in the first place. Realistic promises based on finite capacity plans maximise the chance of being on time. The MRP and Lead Times Problem

Live demo We heard about Preactor via a meeting of ISTUG! We had a reference site visit to another (happy) user of Preactor with Sage Line 500. We implemented Preactor 5 years ago Decided to go ahead with a standalone Preactor P300 FCS system and bespoke interface to and from Sage. We have a dedicated planner who relies totally on the Preactor system. We do NOT have the Routings and WIP Tracking modules. Process information is stored on the BOM in Sage. (Slides to follow) How Preactor Helped

Works Order Header fields – pulled in from the BOM Process Times and Machines Resource Group Run Rate – Bottles Per Minute

Preactor Benefits Preactor planned dates for Works Orders are updated back to Sage and then the purchasing MRP is driven by realistic dates rather than the manufacturing lead times in a standard Sage system. This results in the confidence to reduce buffer stock levels. The same applies to Works Order Trial Kitting – when looking to see which jobs can be started we are using real planning dates. The company is better able to react more quickly to changes in demand from customers, failures to supply by suppliers, or unexpected events in the factory that result in downtime or the need to re-arrange the plan for any other reasons. A copy of the system can be taken at any time and used to do “What-If” scenarios. For instance to look at the effects of adding or removing a machine or of applying an extra night shift and so on. Forward scheduling can be used to answer the question of “How long can we keep the machines running based on the supply of items from previous operations or works orders?”. The system can predict future lateness of orders in advance, while there is still time to do something about it. More accurate promises can be given for new sales orders. We even publish the latest expected dates onto our customer portal website, direct from Preactor so that the customer can see the latest situation.

Customers can view the latest planned dates via the UPL website. UPL Web

1.Work To Lists for each machine. 2.Capacity Vs Loading reports. 3.Job History – audit of the changes to the planned dates for any job. 4.Target Dates Report – for high priority jobs, set target dates and manage by exception. Examples Reporting

Work To Lists for each machine. Reporting

Capacity Vs Loading report. Reporting Unavailable = Off Shift Therefore for 1 machine on 1 day this adds to 24 hours

Job History. Reporting We can trace how this job has been moved between different planned dates

Target Dates. Reporting We need to track this job because the customer is visiting on the 25 th and we have promised that it will be running then....

We intend use Preactor as a way of monitoring the actual adherence to plan by taking shop floor data into Preactor at regular intervals. We have an Access database system in each of the filling rooms. Every time a pallet is completed we enter the quantity / lot number in order to produce a label. And we are expanding our barcoding systems so that we get more real time data on the completions of liquid from the mixing rooms. This data will be imported into Preactor. So Preactor effectively becomes a graphical production monitoring system because the Gantt chart bars can be partially coloured out to represent progress. Future Developments

Preactor Live Demo Slides: Appendix

Menu System – Data Interface sub menu

Main Scheduling screen Machines Linked WOs – producing bulk liquid and consuming it on the filling lines Red indicates to the planner that this operation needs a “Hot Fill”

Main Scheduling screen – Drill to full Operation details Required Date Preactor actual planned dates, with 6 hours setup needed Process time data. Bulk liquid so the time is Hours Per Batch. For the filling lines it will be Bottles Per Minute

Main Scheduling screen Yellow edging means the job is within it’s Delivery Buffer – so it is in danger of being late This job is planned to end later then it is required, hence the red edging Setup time

Shift Pattern Entry Outlook style – only available in Preactor V10+

Shift Patterns Viewd in the Scheduler (Jobs hidden temporarily) Production day, No Break Efficiency = 100% Off Shift Efficiency = 0%

Work Centres or Resource Groups Group G_MR1/2/4T contains these 3 resources