BML chamber assembly Maria Curatolo LNF/INFN. Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Granite Table Granite table (on.

Slides:



Advertisements
Similar presentations
Dubna report. January 28 - Programme Advisory Committee approved JINR participation plan in the ATLAS upgrade, which was presented by A.Cheplakov.
Advertisements

Manual Flo-tap Installation Instructions
Manufacturing Processes
Status of the ATLAS MM project
Projective platforms gluing for ATLAS chambers J.-Ch. Barrière, V. Gautard, P. Ponsot, Y. Reinert, Ph. Schune for the Saclay muon hardware group CEA Saclay.
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 Stave.
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Drift tube wiring Chamber assembly X-ray scan of BOL-0 at CERN Status and Plans The Making of ATLAS Muon.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
University of Athens ATLAS BIS MDT assembly HEP 2001 Presented by Heraklion, 6-8 April 2001 D. Fassouliotis D. Fassouliotis.
CERN PH/DT 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Platform positioning during MDT construction Tool for the platform positioning Ph. Schune J.-Ch. Barrière P RAXIAL A LIGNMENT S YSTEM (barrel) positioning.
Lesson No. 11 Week No. 07 Name of lesson Marking Tools
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
The barrel reference system1 THE BARREL REFERENCE SYSTEM C.Guyot (Saclay) Goal: Provide a geometrical survey of the whole barrel muon spectrometer.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
FAIR MT/Cryogenics, Seong Yeub Shim Beam-Tube Eddy Loss S. Y. Shim.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
A.Ostaptchouk AMS Meeting at CERN, 16 July Measurements of Octagon Walls with 3D CMM Characteristics of 3D CMM Measurement program Results of insert.
Muon-raying the ATLAS Detector
MM detector construction One or several modules per sector considerations.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Bianco On behalf of the ATLAS Collaboration
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Lav meeting F. Raffaelli INFN – Sezione di Pisa C. Capoccia LNF, A. Cecchetti INFN – Sezione di Frascati CERN, Dec13 th, Feet friction studies. -Installation.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
IRMOS Diffraction Grating Integral Tab Design  Performance of an optical system is highly sensitive to the surface distortion of the optics in the system.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Precision Drift Chambers for the ATLAS Muon Spectrometer
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Simon Calibration Instructions Main Antenna Jig Peter Karlsson V2.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
Plots of RPC performance G. Cattani, University of Rome “Tor Vergata” & INFN Roma 2 on behalf of ATLAS Muon Collaboration.
THE LASER FOR EVERYONE fiber. Lamiera Platino fiber Page: 2 PLATINO® fiber laser system objectives include : Reliability Accessibility Productivity.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Chamber assembly Assembly QA Assembly QC Summary, Status and Plans The Assembly of ATLAS Muon chambers.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Pierre-François Giraud, Muon Alignment Meeting1 Status of the barrel alignment system Pierre-François Giraud CERN.
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
“CENTRAL SUPPORT FRAME” -
HLTS Kickoff Presentation Derek Bridges Bobby Moore July 7, 2011
A. Mikhailichenko, D. Rubin
nSW Alignment Installation
Production & QA of BOL chambers
Overview of the Frascati Production Facilities
Alignment of Main Linac Cryomodule (MLC)
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Simplified Procedure Draft
Presentation transcript:

BML chamber assembly Maria Curatolo LNF/INFN

Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Granite Table Granite table (on 3 feet) flatness  20  m over the total surface(4500*2500 mm 2 ) Temperature controlled (8 sensors attached to the granite) T=23.5  1  C (room) Humidity control (room) H=(50  5)%

Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Granite table map

Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Jig measurements Combs measurement summary Av. pitch (all combs):  (RMS) mm RMS of Residuals (with Av. Grid): 2.9  m (all combs)  1.9  m (best 7) Av. Y-coord. (all combs)  (RMS) mm  2.7  m (best 7) Precision tower (with interfaces) measurement summary (see table)

Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Combs

Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Precision towers

Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Precision towers

Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Jig assembly procedure Granite ruler for correct alignment of the reference side towers and comb reference blocks Shimming  30  m under all the intermediate comb feet for compensation of difference in diameter of tubes and endplug reference surface Orthogonality of outer comb side B to the line of the reference side towers  granite ruler and square

Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Jig assembly procedure Parallelism of outer comb side A to outer comb side B  equal distance between them at the two extremities, near ref towers and near non-ref towers Same method for the intermediate combs

Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Jig fixation to the granite table Comb fixations to the granite table allow for sliding in z-direction (fixed point at the ref side extremity) Comb movement in x-direction limited to  50  m in case of accidental clash

Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Vacuum system realized in separate sectors (3 for every comb) Very simple gluing machine (industrially treated for ant adherence) Very finely adjustable speed crane Sequence of gluing steps minimizing the number of tower interface changes

Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Assembly steps

Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Assembly steps

Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Assembly table