FOR REMOVAL OF COLLAPSED PORTION AT SHERSHAH BRIDGE SITE

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Training
Advertisements

HMD SIERRA LEONE (Heavy Machinery Dealership Sierra Leone Ltd.) managed by AIG (Africa International Group) is the new leading machinery and equipment.
BOX PUSHING TECHNOLOGY
Surface Sr. Design Week 7. What You Should Have Distances to Mill and Leach as a Function of Depth Cycle Time Calculations for Proposed Truck Fleets.
HYDROELECTRIC PROJECT
Transportation Systems Highway Transportation Characteristics.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
1 1 NHDP Benefits & Economic Stimulus. 2 2 NHDP Benefits Major economic & social benefits Vehicle operating cost saving Travel time saving Fuel saving.
CAREERS IN MINING. It’s an exciting time to be involved in the minerals industry.
Skyscraper Construction
Luas Cross City Main Infrastructure Works April 2015.
Chapter 5 Construction Tools and Equipment. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Differentiate.
Construction Noise.
The Al Huwailah Link Road Project (P021)
Unit 3: Command & Control IC/IMT Interface
Environmental Noise Impact Assessment Brett Williams.
CIVIL ENGINEERING.
Presentation By Dr.Muhammad Salim Site Incharge Underground Coal Gasification, Project Thar.
Principles in Pre-Positioning Transportation Equipment & Materials for Emergency Response Herby Lissade, P.E. Chief, Office of Emergency Management.
Presented by: Ms. Le Thi Lan Bizdev.asia MODELLING VIETNAM’S EXPRESSWAY NETWORK.
Civil engineering branches & scopes
Institut IGH d.d. 5. Construction. Institut IGH d.d. 5. Construction.
POST CRISIS NEEDS ASSESSMENT (PCNA) MDTF 4 th STEERING COMMITTEE MEETING PROGRESS REVIEW ISU Planning & Development Department Government of Khyber Pakhtunkhwa.
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
CAREERS IN MINING Rubin Pajoohan Fartak International Engineering co.
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY AGNICO-EAGLE MINES CHESTERFIELD INLET MEADOWBANK SHIPPING PROGRAM 2007.
ONSITE EMERGENCY MANAGEMENT PLAN. DISASTER Disaster in industry may be defined as one or more emergencies which can affect several or all plants / departments,
External Noise Regulation Update
"Aviation Safety through International Leadership, Education, and Marketing"
Sectoral Coverage – Construction and related services Workshop on Scheduling Specific Commitments for Construction and related engineering services and.
2012 On track for more!. Ministry of Transport and Communications Avinor AS (airports) Public Road Administration Norwegian Coastal Administration Train.
Managing Council’s Road Network for Better Outcomes Storm Damage Experience Ian de Bruyne Manager Program Planning & Delivery IPWEA Regional Forum 15 May.
ITA Croatia TÜLİN SOLAK Temelsu International Engineering Services Inc. Congress centre “Lacroma”, Dubrovnik April, 7-9, 2011 ITA Croatia “TUNNELING ACTIVITIES.
RIVERS OF PAKISTAN INDUS JHELUM CHENAB RAVI SUTLEJ BEAS WESTERN RIVERS EASTERN RIVERS AFGHANISTAN INDIA IRAN.
高等职业技术教育教材 English for Construction Engineering 建筑工程专业英语 主 编:陆伟成 副 主 编:付 奕 尹春霞.
Message of the Managing Director EXCELLENT TRANSPORT NETWORK(ETN) is established in 2007 as one of the specialized Services providing company to Oil and.
Construction Conference Construction Conference NDDOT’s: NDDOT’s: Future Federal Funding Future Federal Funding State Legislative & Budget issues.
Progress on Strengthening Teacher Education in Pakistan (STEP) 7 th November, 2008 Steering Committee Meeting, MoE.
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
Road Construction Technology
Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
All About Civil Engineers Career Information UNT in partnership with TEA, Copyright © All rights reserved.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Bridge Maintenance and Inspection Responsibilities Technical.
Facts About the Energy Industry  By 2015, 35 percent of the workforce (approximately 200,000 high-skill, high- wage workers) may need to be replaced.
L04: Understand the implications of the issues and constraints on building construction Lesson Objective To be able to explain the different plant required.
Roads and Transport Limpopo 02 August Infrastructure Budget allocation for 2011/12 Upgrading of roads=R770,273m Preventative maintenance= R375,
The National Strategy of Slovak Republic
The National Strategy of Slovak Republic Ing. Iveta Kubasáková, PhD.- Ing. Ivana Šimková University of Zilina, Faculty of Operation and Economics of Transport.
Innovation in Demolition: A Case Study from the Cleanup of Ground Zero Arthur Hendela, David Mendonça Information Systems Department New Jersey Institute.
DEPARTMENT OF ROADS AND TRANSPORT LIMPOPO PROVINCE INFRASTRUCTURE.
980th Engineer Battalion LTC Jeffrey Hartsell CSM Thomas Champion
PROJECT REPORT On REPLACEMENT OF BED BLOCKS ON
Flood Response and Recovery Tony Hanson Environmental Protection Manager Jarrow and Boldon Community Area Forum Thursday 25 th October 2012.
Infrastructure Management Location Referencing Management System Project LRMS Infrastructure Management Regional Presentations Update on.
Fact Sheet CTT Moscow th International Show of Construction Equipment and Technologies Issued in: 09/2007 Key data Premier event:1999.
АРАЛЬСК АЙТЕКЕ-БИ БАЙКОНУР ЖОСАЛЫ
Paul D. Degges, P.E. Chief Engineer & Deputy Commissioner
Highveld Industrial Park Workshop No. 2 Information Memorandum
Highveld Industrial Park Workshop No. 3 Information Memorandum
Heavy Equipment Suppliers in UAE
Building Construction Equipment in Dubai
1. Civil Engineering Practice: Visit to a Corporate Office (SARCO)
PUNJAB BIO ENERGY COMPANY (Bio Mass Supply Chain Management) www. pbe
A. Datum Corporation Bid package overview
Simple Machines: Jackhammer
City of Clarksville Fleet Maintenance Division City Garage
SDEM ROADS AND INFRASTRUCTURE LIMITED
PRESENTATION OVERVIEW
Presentation transcript:

FOR REMOVAL OF COLLAPSED PORTION AT SHERSHAH BRIDGE SITE MAKRAN COASTAL HIGHWAY MAI KOLACHI NDMA RAN PATHANI LYARI EXPRESSWAY WORK METHODOLOGY FOR REMOVAL OF COLLAPSED PORTION AT SHERSHAH BRIDGE SITE RBOD - II 25 Jun 2007 SUKKUR BARRAGE

NHA ACHIEVEMENTS PSDP FUNDING FOR THE YEAR 2007 – 2008 RS 29 BILLION NHA NETWORK – CUSTODIAN OF 30 NATIONAL HIGHWAYS, MOTORWAYS, EXPRESSWAYS AND STRATEGIC ROADS – TOTAL LENGTH 11485 KM * PUNJAB - 26459 KM - 23.16 % * SINDH - 1604 KM - 13.96 % * NWFP - 1651 KM - 14.38 % * BALOCHISTAN - 4629 KM - 40.30 % * NAs / AK - 0942 KM - 8.20 % BRIDGES - 4662 CULVERTS - 15043 CURRENT PORTFOLIO - 129 PROJECTS 510 BILLION REPAIR & MAINTENANCE * 2006 – 2007 6050 M TOLL 1488 M MAINTENANCE ALLOCATION * 2006 – 2007 6839 M

MAJOR ACHIEVEMENTS OF FWO KARAKORAM HIGHWAY (806 KM) KKH – SKURDU ROAD MAKRAN COASTAL HIGHWAY TORKHUM – JALALABAD ROAD RUNN PATHANI RAILWAY BRIDGE RUNWAY SKARDU AIRPORT MANGLA HYDEL POWER STATION LODHRAN – KHANEWAL RAILWAY DOUBLE TRACK REHABILITATION OF SUKKUR BARRIAGE LAHORE – SHEIKHUPURA – FAISALABAD DUAL CARRIAGEWAY SIMLY DAM AKRA KAUR DAM MANSEHRA – NARAN – JHALKAD ROAD GIZIRVALLI ROAD AZAD PATTAN – RAWALA KOT ROAD RATTO DERO – SHAHDAD PUR ROAD GHOTKI – UBARO ROAD LYARI EXPRESSWAY (ONGOING) RBOD – II (ONGOING)

AIM TO PRESENT WORK METHODOLOGY FOR REMOVAL OF COLLAPSED PORTION AT SHERSHAH BRIDGE SITE

KNB PROJECT DATA SALIENTS TOTAL LENGTH - 56 KM COST 3.2 BILLION NLC 32 KM (2.4 BILLION) ECIL 24 KM (0.8 BILLION) BRIDGE COST (600 m) 320 MILLION BRIDGE PORTION (120 m) WHICH IS FELL 90 MILLION DELAY 2003 – 2005 TWO YEARS WORK STARTED MAY 2005 MAR 2006 FAULT DEVELOPED OCT 2006 WORK STARTED AGAIN (AFTER REDESIGNING OF FOREIGN CONSULTANTS) OPENED FOR TRAFFIC 10 MAY 2007

SHERSHAH BRIDGE SALIENTS LENGTH OF CONCRETE STRUCTURE - 496 m LENGTH OF REINFORCED EARTH RAMP – 1 390 m LENGTH OF REINFORCED EARTH RAMP – 2 314 m NO OF SPANS 16 30 m 11 22.5 m 02 60 m (INNER BOX GIRDER) 120 m (OUTER CONTINUOUS BOX GIRDER) 01 DAMAGED PORTION (INITIAL ASSESMENT) 120 m

REMOVAL OF COLLAPSED PORTION OF SHERSHAH BRIDGE ASSESMENT OF TASK DEMOLITION OF 2x60 m INNER BOX GIRDERS RESTING ON COLUMNS DEMOLITION OF 1x120 m COLLAPSED OUTER BOX GIRDER REMOVAL OF INNER AND OUTER DAMAGED GIRDERS REMOVAL OF COLUMNS AND OTHER COMPONENTS CORDONING OF AFFECTED AREA TRAFFIC DIVERSION DISPOSAL OF DEBRIS

SHERSHAH BRIDGE WORKING METHODOLOGY WORKING ORGANIZATION DEMOLITION METHODOLOGY PROPOSED LIST OF PLANT / EQUIPMENT

SHERSHAH BRIDGE WORKING ORGANIZATION TOTAL 60 – 70 PERSONS FIELD CONTROL CENTRE (GROUP COMMANDER) COL BASIM (NLC) COORD OFFICER DEMOLITION GROUP – I (LT COL SAEED) DEMOLITION GROUP – II (LT COL TAHIR) SUPPORT GROUP (LT COL MANSOOR) DEMOLITION TEAM – A (IC – JCO) (2 x NCOs, 10 x OR) DEMOLITION TEAM – C (IC – JCO) (2 x NCOs, 10 x OR) COORD TEAM (IC - JCO) DEMOLITION TEAM – B (IC – JCO) (2 x NCOs, 10 x OR) DEMOLITION TEAM – D (IC – JCO) (2 x NCOs, 10 x OR) TPT / PLANT MGMT TEAM (IC – JCO) (3 x NCOs, REQ OP) TOTAL 60 – 70 PERSONS

DEMOLITION METHODOLOGY SHERSHAH BRIDGE DEMOLITION METHODOLOGY DEMOLITION OF 120 m FALLEN BOX GIRDER THROUGH EXPLOSIVE / MECHANICAL MEANS DEMOLITION OF 2x60 m INNER BOX GIRDERS THROUGH DEMOLITION OF COLUMNS WITH EXPLOSIVE / MECHANICAL MEANS CUTTING OF 2x60 m INNER BOX GIRDERS INTO PORTABLE PIECES DISPOSING OFF DEBRIS AND CONCRETE PIECES AT PRESELECTED PLACE USING CRANES, DUMP TRUCKS AND TRANSPORTERS ESTABLISHMENT OF LOGISTIC BASE AT LOCATION OF 756 CONSTRUCTION TEAM ENGINEERS (MAURIPUR INTERCHANGE)

DEMOLITION METHODOLOGY SHERSHAH BRIDGE DEMOLITION METHODOLOGY

DEMOLITION METHODOLOGY SHERSHAH BRIDGE DEMOLITION METHODOLOGY

DEMOLITION METHODOLOGY SHERSHAH BRIDGE DEMOLITION METHODOLOGY

DEMOLITION METHODOLOGY SHERSHAH BRIDGE DEMOLITION METHODOLOGY

DEMOLITION METHODOLOGY SHERSHAH BRIDGE DEMOLITION METHODOLOGY

PROPOSED LIST OF PLANT / EQUIPTMENT SHERSHAH BRIDGE PROPOSED LIST OF PLANT / EQUIPTMENT DEMOLITION TEAM FOR ONE TEAM FOR 4xTEAMS JACK HAMMERS - 3 Nos 12 Nos EXCAVATORS 2 Nos 8 Nos FE LOADER 1 No 4 No DOZER SIZE – II CRANE HEAVY DUTY CONCRETE CUTTER FORK LIFTER COMPRESSOR GAS CUTTER 5 (1 x RESERVE) 20 PNEUMATIC DRILL MACHINE 4 (1 x RESERVE) 16 GENERATORS (300 – 500 KVA) 3 (1 x RESERVE) 12 SWR AS REQUIRED EXPLOSIVE / ACCESSORIES

SHERSHAH BRIDGE SUPPORT GROUP ARRANGEMENT OF PLANT / EQUIPMENT / EXPLOSIVE / POL etc. REPAIR OF PLANT / EQUIPMENT ESTABLISHMENT OF FIELD CONTROL CENTRE REPORTS AND RETURNS SECURITY COMMUNICATION MEDICAL COVER COORDINATE TRAFFIC PLAN MEDIA MANAGEMENT

THANKS