What is Green Button All About? Making metered data available to consumers. All electric users have meters that are used to measure how much energy.

Slides:



Advertisements
Similar presentations
Oncors Advanced Meter System (AMS) Enabling Demand Response for Retail Electric Providers in Texas Mark Carpenter June 24, 2010.
Advertisements

Smart Grid: an Ontario Perspective Brian Hewson, Senior Manager Regulatory Policy Hamilton May 8, 2013.
1 NAESB Data Privacy Task Force February 16, 2011.
North American Energy Standards Board Standards Development for Demand Side Management / Energy Efficiency September 30, 2009 Eric Winkler, Ph.D. Project.
Configuration Management
Impact of Smart Grid, ICT on Environment and Climate Change David Su Advanced Network Technologies National Institute of Standards and Technology ITU Symposium.
Revision Date October 16, 2012 Advanced Metering Implementation Team Projects Completion Road Map Discussion Through 2013 and Transitional Steady State.
AMI Home Area Network Update SAG Meeting March 18, 2014.
Collect and Validate Data (Daily) Summarize and Validate Deliver Data Data Warehouse CUSTOMER BILLING CYCLE Day 1 Day 30 Day-after Green Button data retrieved.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview November.
NAESB REQ.21 Update Dr. Martin J. Burns, Hypertek Inc. for NIST February 21, 2014.
1 NAESB Data Privacy Task Force January Data Access and Privacy Access to customer usage information has national attention and implications ENERGY.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview.
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
SMART GRID: Privacy Awareness and Training – A Starting Point for Utilities October 2011 SGIP-CSWG Privacy Group 1.
SMART GRID: Privacy Awareness and Training – for PUCs/PSCs A Starting Point December 2011 SGIP-CSWG Privacy Group 1 DRAFT.
© 2007 Cisco Systems, Inc. All rights reserved.ICND1 v1.0—1-1 Building a Simple Network Understanding the Host-to-Host Communications Model.
Health IT RESTful Application Programming Interface (API) Security Considerations Transport & Security Standards Workgroup March 18, 2015.
Smart Metering in ERCOT: Implementation Update CCET Board of Directors Meeting August 3, 2011 Presented by Christine Wright, Competitive Markets Division.
1 Connectivity Week 2010 How Can Standards Be Regulated? Thursday May 27 10:30AM-Noon Zahra Makoui.
SCCAP is a program of Strategic Energy Innovations “PG&E” refers to Pacific Gas and Electric Company. A subsidiary of PG&E Corporation. © 2012 Pacific.
Confidential and proprietary material for authorized Verizon Wireless personnel only. Use, disclosure or distribution of this material is not permitted.
Masud Hasan Secue VS Hushmail Project 2.
Green Button Initiative GREEN BUTTON DOWNLOAD MY DATA CERTIFICATION DRY RUN Marty Burns, John Teeter for NIST, Kay Clinard UCAIug.
Facility Smart Grid Information Model
Multiple List Service and The Green Button Initiative Greg Manship, CEO Intermountain MLS, John.
EXCiPACT TM EXCiPACT TM International Pharmaceutical Excipients Certification Minimize risks – maximize benefits.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
Advanced Metering Implementation Team Update Christine Wright Public Utility Commission of Texas October 2008.
Lecture 7: Requirements Engineering
TEXAS NODAL Board of Directors Austin, Texas July 15, 2003.
IRIS - International Railway Industry Standard The Quality Standard for the Railway Industry ACRI Prague, 2nd April 2008 Angela de Heymer Manager Quality.
1 SMT Format Short Story April 24, 2012 ‘Access, Control & Convenience’
Advanced Meter Settlement Background and NPRR. Overview PUC Rule (wholesale settlement) Project – Wholesale Settlement Project Filed Deployment.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
April 8, 2011Page 1 April 8, 2011 The University of Texas Interdisciplinary Energy Conference Overcoming Barriers to Smart Grid & New Energy Services Panel.
OpenADE: OpenADE, ESPI, OpenADE 2.0 Scope November 2, 2010 David Mollerstuen, OpenADE TF Co-Chair Steve Van Ausdall, OpenADE TF Co-Chair.
Customer Data Access -The New Ground Floor Christopher Irwin US Department of Energy – Office of Electricity Oct 16, 2015.
Rule 24 DRP/Aggregator informational Workshop December 2 nd 2015.
Balancing Privacy, Security, and Access Presented by Chris Villarreal Minnesota Public Utilities Commission October 16, 2015.
Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Jerry Melcher Onsite facilitator for this meeting.
Privacy of Customer Energy Usage Data: Protecting Consumers and Giving Them the Tools with which to Protect Themselves Aryeh B. Fishman Director, Regulatory.
TSO Interoperability and the CIM
Texas Competitive Market & Governance October 4, 2015.
Retail Market Subcommittee (RMS) Update Kathy Scott April 9, 2013Commercial Operations Subcommittee 1.
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
© 2012 IBM Corporation 3 rd Party Registration & Account Management 1 1 SMT Post R 4.3 Potential Enhancements.
OpenADE November 17, 2011 PM2 David Mollerstuen, OpenADE TF Chair Steve Van Ausdall, OpenADE TF Vice-Chair.
WIPO-INSME International Training Program An Introduction to the Field of Collective Marks and Certification Marks for SMEs Geneva - May, 2005 Martin Senftleben,
Future Usage Environments and System Integration Issues David Forslund Cognition Group, Inc. HCMDSS Workshop November 16, 2004.
© 2015 Open Grid Forum ETSI CSC activities Wolfgang Ziegler Area Director Applications, OGF Fraunhofer Institute SCAI Open Grid Forum 44, May 21-22, 2015.
DM Collaboration – OMA & BBF: Deployment Scenarios Group Name: WG5 - MAS Source: Tim Carey, ALU, Meeting Date:
1 Third Party Data Access December 16, Third Party Data Access Green Button Connect My Data (CMD) Con Edison and O&R support third party data accessibility.
1 Distribution Resources Plan [R ] Data Workshop California Public Utilities Commission May 23, 2016 Rulemaking R Pursuant to Public.
December 16, 2015 New York Public Service Commission Technical Conference Customer & Aggregated Data.
McGraw-Hill©The McGraw-Hill Companies, Inc., 2000 Lecture 3 : Network Architectures 1.
Direct Participation Enrollment Process for 2017 DRAM
North American Energy Standards Board Standards Development for Demand Side Management / Energy Efficiency September 14, 2009 Eric Winkler, Ph.D. Project.
Configuration Management
[WP1] T1.2 User and Business Requirements
Green Button Connect My Data
SMT Format Short Story ‘Access, Control & Convenience’ SMT Format Short Story April 24, 2012.
EnerNOC Customer Data Presentation July 13, 2016
Configuration Management
HOSTED BY IN PARTNERSHIP WITH SUPPORTED BY Barcelona iCapital 2015.
E-Lock ProSigner ProSigner means “Professional Signer” signifying the software that can apply legally enforceable Advanced electronic signatures to electronic.
North Carolina State University Cash Receipt Certification
Roger Marks (Huawei) capable 15 July 2019
Renewable Energy Certificate Process Review and Recommendations
Presentation transcript:

What is Green Button All About? Making metered data available to consumers. All electric users have meters that are used to measure how much energy they use. This metered data has been used by the energy service provider to calculate how much that energy will cost you, the consumer. Green Button is all about making that data available to you - for planning - for analysis - for your benefit! Green Button data contains no Personal Identifiable Information (PII) Your privacy is ensured when you are using Green Button! There is no PII contained within the standard Green Button data, it contains only measured interval usage information. The data representation has been fully reviewed by the cyber-security teams at the National Institute of Standards and Technology from this perspective. You should ensure your service provider (Data Custodian) is a certified Green Button provider. Interoperable Standards Green Button data is represented in standard formats so that many stakeholders may use the data without the burden of proprietary data conversion technologies. Green Button Data Formats Are Based Upon International Standards. Energy Service Providers Interface Standard The North American Energy Standards Board (NAESB) REQ 21 standard provides the basis for the Green Button representation. It uses a defined set of resources, along with an industry and internet standard representation to allow implementers to build applications that cooperate to provide services to consumers. Validation of Data Format Early implementations of the Green Button standard were not necessarily common in their application of the standard to their specific deployment. That resulted in the clear identification of the need for validation of these implementations. So all Green Button files are not necessarily interoperable. The Green Button Testing and Certification authority is currently being stood up to address this problem and lead to a higher level of consumer confidence. An Overview of the Green Button Initiative

Green Button Download My Data (DMD) DMD is the simple starting point. Many service providers (or utilities) have provided access to your usage data through their consumer portals. Generally, these portals provide a way to view historical usage data and to, in some cases, download that data for further analysis. Generally, the format used when the download capability was provided, was a comma separated value (CSC) format that was different for each provider. DMD provides more general format to represent the same data, and does so in structure that is standardized for all services providers. Green Button Connect My Data (CMD) CMD is all about machines talking to machines! The consumer is involved in approving access to the data, but is not (necessarily) involved in the movement of the data from the Data Custodian, or holder of the data, to a third party service provider. Using standard authorization processes All access to Green Button data is fully controlled by the consumer! Green Button Connect My Data uses authorization standards defined by the Internet Engineering Task force (IETF) to ensure the participants in the Green Button initiative are aligned with the mainstream of internet evolution. An Overview of the Green Button Initiative For More Information, Visit: