1 Project Smart Metering Portfolio Foundation Updates June 2013.

Slides:



Advertisements
Similar presentations
Third Energy Package for Change of Supplier 2009/73/EC.
Advertisements

1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
Implementation of Non Effective Days Nexus Workgroup – March
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
1 Smart Metering Portfolio DCC Day 1 Project Smart Metering Portfolio Focus Group Project Update Thursday 06 th June 2013.
Establishing a baseline of the seven day services clinical standards in acute care ‘A how to guide’ To activate the links in this slide set please view.
Shipperless & Unregistered Workgroup Monday 1 st July 2013.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Nexus Workgroup CSEP Transition Topic June
Shipperless & Unregistered site working group Recommendations to address the Unregistered Sites Collectively establish & execute activities to correct.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
PN UNC Workgroup iGT Services 7 th February 2012.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
1 Modification 437 – Blank MAM Identities Distribution Workgroup December 2012.
Annie Griffith & Chris Fears September 2007 UK Link Technology Refresh.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Cutover & Implementation Aggregated Programme RAG
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Agency Charging Statement Overview of Consultation 11 th February 2008.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
1 Smart Metering Foundation Stage February Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.
1 Industry Shipperless &Unregistered Working Group Wednesday 8th September 10.00am at xoserve.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 June 2012 COR1000 Telecoms Project UK Link Committee.
DCA timeline and ROM Overview 12 October Smart Metering Indicative Timeline Evaluation Service (EVS) 2528 received / Rough Order of Magnitude.
User Pays User Committee 12th November 2013
Distribution Workgroup 24/11/16
UK Link Technology Refresh
XRN4361 – UK Link Release 2 Data Migration Plan for XRN /03/18
Market Trials ChMC 8th August 2018.
Amendment Invoice Task Force Progress Report
Agenda Action Review Update on IX and iGT access Testing strategy
Change Management Committee – June 2019 Update
UNC Modification – Non Effective Days
Cutover & Implementation Aggregated Programme RAG
Distribution Workstream UNC Modification 0224 Draft UKLink Implementation Summary Responses 26th February 2009.
Change Management Committee – June 2019 Update
DSC Change Committee Summary – 11th July
DSC Change Committee Summary – 10th October
UNC Modification 0531 Provision of Industry Testing System
Smart Metering Portfolio DCC Day 1 UK Link Committee DCC Day 1 Shipper File Format Representation Thursday 08th August 2013.
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
June 2019 Release Scope DSC Change Management Committee
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
Amendment Invoice Task Force Progress Report
XRN4249 – Part B Data Migration Plan
PN UNC Workgroup (Settlement topic)
UK Link Replacement Programme additional supporting UNC modifications
Deferral of Retrospective Updates Functionality
Lessons Learnt UKLC - November 2015
Overall Project RAG Status
Smart Metering Implementation Programme January 2013
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
UNC Modification 0634 (Urgent) – Post Implementation Assessment
Implementation Approach Distribution Workgroup – June 2014
Meter Read Rejections ..
Meter Reads.
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
DSC Change Committee Update
0688 Workgroup Xoserve Actions
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Further Considerations
Enabling Large Scale Utilisation of Class 3
DSC Change Committee Update
REC Data Specification and UK Link File Formats
Presentation transcript:

1 Project Smart Metering Portfolio Foundation Updates June 2013

2 Agenda Smart Switching File Format Validation Shipper Trials for Smart Switching Implementation Date for Smart Switching Effective Switching - Back Population Approach Smart Switching - Back Population Approach

3 Smart Switching File Format Validation As communicated in the April/May Change Pack. There are four new validation conditions that are required for the GEA / GEO file type Each record in the GEA file will be validated against the following new conditions: –ORG00029 (“Organisation provided does not fulfil Organisation Role”). –ORG00030 (“Organisation already exists with a more recent date”). The following 2 error codes pertain to validations when submitting an ‘end dated’ update –ORG00031 (“Organisation does not match existing record for this meter point”). –ORG00032 (“Organisation end date is before the original start date at this meter point”)

4 Shipper Trials of GEA & GEO File Formats Shipper Trials of the new GEA & GEO file formats planned for: –23 rd July 2013 – 13 th August 2013 Project Team extended window to Shippers to express interest to participate in the testing to 7 th June 2013 Full details of approach to be submitted to the UK Link Committee in June Participating Shippers will be asked to confirm: –Details ( and phone number) of the primary contact within their organisation for this testing and agree dates for file submission

5 Implementation Date for Smart Switching As per last month’s update the position remains as: Proposed ‘Notional’ Implementation Date of 1st October 2013 SPAA Schedule 23 Change raised to reflect this date Due to proximity to AQ Review and constrained processing period, actual implementation date is likely to be prior to 1st October Xoserve are currently assessing dates in August / September but may elect an alternative date. Implementation Plan Summary will show the base-lined ‘notional’ implementation date – i.e. 1st October 2013 Intention is that the Committee will be informed of progress and planned implementation via updates through UK Link Committee As this implementation does not impact existing file flows, but creates a new flow it is expected that the actual implementation date being earlier should NOT impact Users.

6 Effective Switching Back Population Approach Each Shipper with a portfolio of Smart Meters has confirmed their intention to participate in this process, and provide the expected volume of meter points impacted by 10 th June 2013 Process to run from 15 th July 2013 – 31 st August 2013

7 Effective Switching Back Population Approach Once the files are received Xoserve will identify if the meterpoint has transferred ownership and will generate a Data Output File to enable the Shippers to perform a completeness check: Data Output File – This file shall be provided to the Registered System User, whether they have provided the original input file or not. Exception Process – It is likely that data that is provided to Xoserve may generate exceptions. Xoserve shall not try to resolve those exceptions. It is incumbent upon the providing Shipper to provide appropriately robust data. Reporting. It is expected that Xoserve shall be asked to provide a summary level Monthly report to SPAA Executive Committee on the number of meter points that have been successfully updated on UK Link Systems. Population Process via ONUPD – Xoserve shall use the information and volumes to schedule the receipt of ONUPDs from the Registered System Users.

8 Smart Switching Back Population Approach As per last month’s update the position is: Reminder of the registration SMSO retrospective update As part of UNC Modification 430, the Smart Metering System Operator Identity must be provided to incoming Shippers by the Transporter. This information must be provided to the Transporter by the incumbent Shipper and retained for onward provision at a Change of Shipper. No mechanism exists for these to be formally recognised currently. It is proposed that the SMSOs register in the first instance with the Transporters Agent, Xoserve, who following allocation of the three character short code shall raise the relevant change to MDD for SPAA to recognise the organisation. Back Population approach to be agreed in full with Shippers but will require the GEA file to be provide all updates Xoserve have written to Shippers for Effective Switching to ascertain the volume of Smart Meters in each Suppliers Portfolio that will be used to analyse the impacts. Analysis will look at the volumes acceptable through the GEA file to back populate the SMSO for all Smart Meters