REGULATORY ACCEPTANCE OF POST-CLOSURE CARE INNOVATION Mr. Charles G. Johnson Colorado Department of Public Health and Environment Hazardous Material and.

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

DEQ Mission By the end of the decade, Virginians will enjoy cleaner water available for all uses, improved air quality that supports communities and ecosystems,
NC SWANA FALL 2014 MEETING Presented by Ed Mussler P.E., Wilmington, NC October 2014 DWM Post-Closure Landfill Use Concepts and Considerations.
PA One Cleanup and Land Use Controls The “Business of Brownfields” Conference April 17, 2008 Terri Smith Environmental Liability Management, Inc.
The Process of Siting and Approving a New Landfill in Ontario
Disposal of Unused or Expired Drugs Attorneys General Education Program Public Policy Conference THE PHARMACEUTICAL INDUSTRY: ECONOMICS, REGULATION, AND.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
PUBLIC INFORMATION SESSION: Old Fall River Road Landfill Dartmouth, MA Massachusetts Unlined Landfill Closure Policy March 28, 2013 Mark Dakers, Acting.
Connecticut Remediation Programs Elsie Patton Connecticut Department of Environmental Protection.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF DOE POLICY -- USE OF INSTITUTIONAL CONTROLS COLLEEN OSTROWSKI (202)
Performance-Based System for Post-Closure Care at MSW Landfills California Integrated Waste Management Board Post-Closure Maintenance Period and Financial.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
ENVIRONMENTAL MANAGEMENT PLAN
LEA Conference, Autumn 2007 Joseph Mello, Land Disposal Program Manager 1 WATER BOARD FINANCIAL ASSURANCE FOR KRFR.
Purpose of the Standards
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
Okanagan Basin Conservation Programs (SOSCP and OCCP) 80+ organizations (government and non-government) working together to achieve shared conservation.
Appendix 8.1 – Waste Management Plan Oil Spill Contingency Plan – Land Document Number: KOC.SA.020 Incident Name: Incident Date/Time: Incident Location:
Icfi.com © 2006 ICF International. All rights reserved. “Study to Identify Potential Long-Term Threats and Financial Assurance Mechanisms for Long-Term.
September 16, SWANA 2005 COLORADO CHARLES JOHNSON SOLID WASTE UNIT LEADER.
Update on progress with development of DS459
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Patient Protection and Affordable Care Act March 23, 2010.
2006 Colorado SWANA Charles G. Johnson Colorado Department of Public Health and Environment October 6, 2006.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
Multimedia Assessment for New Fuels: Stakeholders’ Meeting September 13, 2005 Sacramento, CA Dean Simeroth, California Air Resources Board Dave Rice, Lawrence.
1 of 21 Introduction to the EPA 7-Step DQO Process DQO Training Course Day 1 Module 7 (30 minutes) Steps Presenter: Sebastian Tindall.
Welcome – Thanks for joining us.
Michael Webster (Cameco Corporation) Tamara Yankovich (IAEA, Formerly Saskatchewan Research Council) Martin Klukas (Atomic Energy of Canada Limited) IAEA.
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
California Integrated Waste Management Board November 10, 2008 Item #2 Discussion And Request For Direction Regarding The Board's Fulfillment Of The Requirements.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines June 17, 2009 Mark Dakers, Environmental Analyst Massachusetts.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Presumptive MACT For Municipal Solid Waste Landfills July 1999 Emission Standards Division US Environmental Protection Agency.
Sessions VI and VII Conclusions and summary Francois Besnus Session Chair Cape Town July 6, 2007.
Ch WAC Geologic Sequestration of Carbon dioxide John Stormon Hydrogeologist Washington Department of Ecology Seattle, WA October.
Lynne Welsh Massachusetts Department of Environmental Protection.
Regulatory Framework for Uranium Production Facilities in the U.S.
River Corridor Closure Project Safety People Results End State and Final Closure Jeff A Lerch Manager, Long Term Stewardship June 1 and 2, 2006.
California Integrated Waste Management Board Update On Long-Term Postclosure Maintenance And Corrective Action Financial Assurances Activities Permitting.
1 Bioreactor Landfill Operations Regulatory Perspective Considerations ASTSWMO Conference July 23, 2003 Scott Walker, PE, CEG California EPA Integrated.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
DOE ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP BIOTA PROTECTION Stephen L. Domotor (202)
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
Status Report On Staff Review Of Board Regulations For Alternative Daily Cover, Food And Green Waste Composting, Farm And Ranch Composting, Compostable.
Date Planning for Compliance with the Final 316(b) Phase II Regulations For APPA – March 8, 2004 David E. Bailey EPRIsolutions.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
Swedish Risk Management System Internal management and control Aiming to Transport Administration with reasonable certainty to.
Item 21 May 11-12, 2004 CIWMB Meeting Discussion And Request For Rulemaking Direction To Formally Notice Proposed Regulations For RCRA Subtitle D Program.
December 6, 2004CIWMB P&E Committee Workshop1 Postclosure Maintenance Postclosure Maintenance Beyond the Initial 30 Years and Financial Assurance Demonstrations.
Cal/EPA Building Room 550 Postclosure Maintenance Workshop March 10, :00 am to 12:00 pm Postclosure Maintenance Workshop March 10, :00 am to.
MICHAEL E. SCOTT, DEPUTY DIRECTOR DIVISION OF WASTE MANAGEMENT Available Information on the Beneficial Reuse of Coal Combustion Products 1.
A Sustainable Tourism Framework for the Caribbean Mercedes Silva Sustainable Tourism Specialist Caribbean Tourism Organization “Ma Pampo” World Ecotourism.
3 R’s of Sustainability SESSION 1: The What, Why and How of Sustainability PREVIEW ONLY.
Department of Water and Environmental Regulation
Long-Term Care After 30-Year Post-Closure Period
Fall Low Level Waste Forum Meeting
Environmental Quality Program Strategy
Georgia Update Jeff Cown Land Protection Branch
Municipal Solid Wastes (continued)
Landfill of waste WASTE MANAGEMENT AND TECHNOLOGY František Straka
KIRIBATI IW R2R PROJECT OUTLINE OF PRESENTATION: PROGRESS
OECD good practices for setting up an RIA system Regional Capacity-Building Seminar on Regulatory Impact Assessment Istanbul, Turkey 20 November 2007.
Branch Organization Chuck Mueller, Branch Chief
TOOLS FOR HIGH QUALITY APPLICATIONS (AKA “Streamlining”)
Management of Pollution Risks at Activity Cessation GROUP HSE RULE (CR-GR-HSE-421) EXECUTIVE SUMMARY This rule sets the HSE requirements for the management.
Presentation transcript:

REGULATORY ACCEPTANCE OF POST-CLOSURE CARE INNOVATION Mr. Charles G. Johnson Colorado Department of Public Health and Environment Hazardous Material and Waste Management Division

20062 Innovation Who Needs It

20063 Rich History Of Innovation “Innovation is the ability to see change as an opportunity - not a threat” Imagination is more important than knowledge... Albert EinsteinAlbert Einstein

20064 What is a Bioreactor? EPA’s ORD proposed the following definition: “A landfill designed and operated in a controlled manner with the express purpose of accelerating the degradation of MSW inside a landfill containment system.” 2

20065 Teamwork And Innovation

20066 ITRC A Tool of Innovation Improve state permitting processes and Speed successful implementation of innovation environmental technologies From Desk to Dirt. ITRC is a state-led, national coalition of regulators and others working to:

20067 Total Active Members: 18 7 Alternative Landfill Technology Team Composition

20068 Innovative Approaches to Ending Post-Closure Care Regulatory Flexibility Section Post-Closure Care Requirements (a) Following closure of each MSWLF unit, the owner or operator must conduct post-closure care. Post- closure care must be conducted for 30 years, except as provided under paragraph (b) of this section, ………

20069 Post-Closure Care Questionnaire Does your State have statutes, regulations, policies, guidance or business practices that pertain to Post Closure Care?

Regulatory Flexibility (1) Maintaining the integrity and effectiveness of any final cover, ……… ; (2) Maintaining and operating the leachate collection system …… if applicable. The Director of an approved State may allow the owner or operator to stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to human health and the environment; (3) Monitoring the ground water in accordance with the requirements of subpart E of this part, …… if applicable;

Post-Closure Care Questionnaire

Regulatory Flexibility (b) The length of the post-closure care period may be: 1) Decreased by the Director of an approved State if the owner or operator demonstrates that the reduced period is sufficient to protect human health and the environment and this demonstration is approved by the Director of an approved State; or (2) Increased by the Director of an approved State if the Director of an approved State determines that the lengthened period is necessary to protect human health and the environment.

Post-Closure Care Questionnaire

Post-Closure Care Elements

Guidance Post-Closure Care Goals Protection of human health and the environment Provide clear, consistent guidance on the need for and duration of PCC Promote proactive management and assessment of the risks associated with landfills that should reduce the need for PCC Create decision points to shorten or lengthen PCC Identifying stressors on the landfill, potential failure modes, corrective action activities, and operating and management practices that meet this goal

Guidance Post-Closure Care Goals Means of evaluating the effect of changes in PCC on the cost or duration of PCC. Present a performance-based approach to post- closure care can meet these goals. Managing the threat (i.e., unacceptable risk) associated with a closed landfill on either an active or passive basis. Premise: the remaining contents of the landfill do not pose a threat to human health and the environment.

Performance evaluation of PCC Characterize site setting and service capacity Establish land use strategies Evaluate residual threat integrating future land use & stakeholder input Evaluate stressors and potential failure modes on and potential land reuse

Advantages of Innovation Understand surroundings & perspective Understand other opportunities for innovation Create momentum for others Understand integration opportunities

Integration