Rubber Seal Estimated Time for Completion: 30 minutes Experience Level: Lower MSC.Marc 2005r2 MSC.Patran 2005r2.

Slides:



Advertisements
Similar presentations
Drinking Straw Estimated Time for Completion: ~45min Experience Level: Lower MSC.Patran 2005 r2 MSC.Marc 2005 r2.
Advertisements

O-Ring Estimated Time for Completion: 30 minutes Experience Level: Lower MSC.Marc 2005r2 MSC.Patran 2005r2.
Can Bottom Snap-through
1 Impulsive Force GUI Familiarity Level Required: Lower Estimated Time Required: 20 minutes MSC.ADAMS 2005 r2.
Define a Composite Material
Controls Toolkit in ADAMS/View
1 Simple Pendulum Estimated time required: 20 min GUI familiarity level required: Lower MSC.ADAMS 2005 r2.
Tube Insertion Estimated Time for Completion: 8 minutes Experience Level: Higher MSC.Marc 2005r2 MSC.Patran 2005r2.
Spring Design using Parametric Modeling
WORKSHOP 8 NONLINEAR CONTACT
Creep of Tube Estimated Time for Completion: 5 minutes Experience Level: Higher MSC.Marc 2005r2 MSC.Patran 2005r2.
WORKSHOP 7 TAPERED PLATE WS7-1 NAS120, Workshop 7, November 2003.
Estimated Time for Completion: 30 minutes Experience Level: Lower Compliant Stroke Amplifier MSC.Marc 2005r2 MSC.Patran 2005r2.
Anisotropic Sheet Drawing Estimated Time for Completion: 10 minutes Experience Level: Higher MSC.Marc 2005r2 MSC.Patran 2005r2.
1 Pulley System GUI Familiarity Level Required: Lower Estimated Time Required: 40 minutes MSC.ADAMS 2005 r2.
WS Mar120 - Patran Day 1 Overview - Meshing FINITE ELEMENT MODEL OF A 3-D CLEVIS AND PROPERTY ASSIGNMENT.
Using MD Nastran/Patran and MSC.Adams together
INTERFERENCE FITS MAR Interference Fits.
CONTACT ANALYSIS USING 3D BOLTS
Gear Train MSC.ADAMS 2005 r2 GUI Familiarity Level Required: Low
WORKSHOP 11 SPACECRAFT FAIRING
1 F F Double-Cantilevered Bar Estimated time for completion: ~20 min Experience Level: Lower MSC.Patran 2005 r2.
Staple Pin Simulation Estimated Time for Completion: ~35min Experience Level: Lower MSC.Patran 2005 r2 MSC.Marc 2005 r2.
Crush Pipe Problem Estimated Time for Completion: ~35min Experience Level: Lower MSC.Patran 2005 r2 MSC.Marc 2005 r2.
1 Projectile Estimated time required: 20 min GUI familiarity level required: Higher MSC.ADAMS 2005 r2.
1 MSC ADAMS 2005 r2 Crank Slider Mechanism on Incline Plane GUI Familiarity Level Required: Lower Estimated Time Required: 1 hour.
1 Short-Long Arm Suspension GUI Familiarity Level Required: Lower Estimated Time Required: 40 minutes MSC.ADAMS 2005 r2.
Torque Controlled Dies with Twist Transfer Estimated Time for Completion: 5 minutes Experience Level: Higher MSC.Marc 2005r2 MSC.Patran 2005r2.
Modal Analysis of a Simple Cantilever
1 Extrusion GUI Familiarity Level Required: Lower Estimated Time Required: 30 minutes MSC.ADAMS 2005 r2.
Hertz Contact Estimated Time for Completion: 30 minutes Experience Level: Lower MSC.Marc 2005r2 MSC.Patran 2005r2.
WORKSHOP 1 STEADY STATE HEAT TRANSFER WORKSHOP 1 STEADY STATE HEAT TRANSFER.
1 Oscillating Slider Estimated time required: 25 min GUI familiarity level required: Higher MSC.ADAMS 2005 r2.
9.0 New Features Metal Shaft with Rubber Boot Workshop 7 Load Steps in Workbench.
1 Bridge Truss Structure Estimated time required: ~30 min Experience level: Lower MSC.Patran 2005 r2.
BREAK FORMING MAR Break Forming Exercise. WS MAR 120, Break Forming, June 2004MAR Break Forming Exercise Model Description: A flat sheet.
LANDING GEAR STRUT ANALYSIS
Micro-valve Estimated Time for Completion: ~30min Experience Level: Lower MSC.Patran 2005 r2 MSC.Marc 2005 r2.
WS8C-1 WORKSHOP 8C TENSION COUPON NAS120, Workshop 8C, November 2003.
Mar120, Workshop 7, December 2001 WORKSHOP 7 METAL FORMING A PAPER CLIP WORKSHOP 7 METAL FORMING A PAPER CLIP.
WORKSHOP 4 TRANSIENT HEAT TRANSFER ANALYSIS. WS4-2.
WS Mar120 - Patran Day 1 Overview - Results POST PROCESSING OF STRESS RESULTS.
WS-1 WORKSHOP Define Equivalent Section Plate Properties NAS121, Workshop, May 6, 2002.
BALL JOINT ANALYSIS F=600 lbf MAR 120 – Ball Joint Analysis.
1 Stadium Display Truss – Troubleshooting Estimated time required: 35 min Experience level: Higher MD Patran 2005 r2.
WS6-1 WORKSHOP 6 BRIDGE TRUSS NAS120, Workshop 6, November 2003.
GEOMETRY MODEL OF A 3-D CLEVIS
ANALYSIS OF A CANTILEVER BEAM
1 Assemble Exploded Model GUI Familiarity Level Required: Lower Estimated Time Required: 30 minutes MSC.ADAMS 2005 r2.
Workshop 5-1 NAS101 Workshops Copyright  2001 MSC.Software Corporation WORKSHOP 5 Stiffened Plate Subjected to Pressure Load.
WS8B-1 WORKSHOP 8B TENSION COUPON NAS120, Workshop 8B, November 2003.
Coupled Transient Cooling Fin Estimated Time for Completion: 5 minutes Experience Level: Higher MSC.Marc 2005r2 MSC.Patran 2005r2.
WS4-1 WORKSHOP 4 Stadium Truss NAS120, Workshop 4, November 2003.
WS9A-1 WORKSHOP 9A 2½ D CLAMP – SWEEP MESHER NAS120, Workshop 9A, November 2003.
Dynamics with Friction Heating Estimated Time for Completion: 5 minutes Experience Level: Higher MSC.Marc 2005r2 MSC.Patran 2005r2.
1 Forklift Estimated time required: 20 min GUI familiarity level required: Higher MSC.ADAMS 2005 r2.
WORKSHOP 15 PARASOLID MODELING NAS120, Workshop 15, November 2003 WS15-1.
Can Opener Estimated Time for Completion: 20 minutes Experience Level: Higher MSC.Marc 2005r2 MSC.Patran 2005r2.
Workshop 9-1 NAS101 Workshops Copyright  2001 MSC.Software Corporation WORKSHOP 9 Buckling Analysis of Plate.
WS8A-1 WORKSHOP 8A TENSION COUPON NAS120, Workshop 8A, November 2003.
Mar120 - Test Specimen Necking NECKING OF A TEST SPECIMEN Symmetry Plane.
NAS133, Workshop 2, August 2011 Copyright© 2011 MSC.Software Corporation WS2 - 1 WORKSHOP 2 SOLID-TO-SOLID CONTACT.
MAR120, Workshop 1, December 2001 WORKSHOP 01 LINEAR AND NONLINEAR ANALYSIS OF A CANTILEVER BEAM.
REFERENCE: Training Manual Friction (4-18) Planar Seal (part 2) Workshop 2 Contact with Friction Constant Friction Coefficient.
WS16-1 MAR120, Workshop 16, December 2001 WORKSHOP 16 SPECTRUM RESPONSE ANALYSIS OF A TRANSMISSION TOWER
Workshop 7B-1 NAS101 Workshops Copyright  2001 MSC.Software Corporation WORKSHOP 7B Structure With Spring Support.
Workshop 4-1 NAS101 Workshops Copyright  2001 MSC.Software Corporation WORKSHOP 4 Structure Subjected to Enforced Displacement at an incline.
FREQUENCY RESPONSE ANALYSIS OF TRANSMISSION TOWER
ANALYSIS OF A RUBBER SEAL
ENFORCED MOTION IN TRANSIENT ANALYSIS
Presentation transcript:

Rubber Seal Estimated Time for Completion: 30 minutes Experience Level: Lower MSC.Marc 2005r2 MSC.Patran 2005r2

2 Topics Covered Using large displacement large strain analysis Defining rigid contact boundary condition for translational and rotational motion Creating multiple step analysis Using Mooney-Rivlin material model

3 In the design of a door seal, it is important to determine the maximum stresses experienced by the seal when the door is closed. This information can be used to estimate a life of the component under stresses. The door is assumed rigid compared to the seal. It is first translated without rotation toward the seal 0.3” and then rotated 30 degrees counterclockwise. The seal is made of rubber whose behavior can be modeled using a Mooney-Rivlin model. We will use Patran to complete the problem description from a given 2D meshed model and analyze it by using Marc. Problem Description

4 Summary of Model Constrain vertical and horizontal directions on all bottom nodes Rigid contact with 2 control nodes Deformable contact Material using Mooney-Rivlin model C10 = 80 C01 = 20 Door Seal First node is to control translation Second node is to control rotation

5 Goal In this Example, we analyze a door seal. The purpose of the analysis is to examine the stresses and deflections created during the closing of a door. The door is considered very stiff relative to the rubber seal and can be modeled using a rigid body.

6 Expected Results Maximum compressive stress is 176 psi. Maximum tensile stress is 158 psi.

7 Create Database a.Click File menu / Select New b.In File Name enter seal.db c.Click OK d.Select Analysis Code to be MSC. Marc e.Click OK a bcde

8 Import Model a.Click File menu / Select Import b.Select Source to be MSC. Patran DB c.Locate and select file seal_model.db d.Click Apply a b c d

9 Create Control Nodes a a.Click Elements icon b.Click Node Size icon to see all nodes c.Select Action to be Create d.Select Object to be Node e.Select Method to be Edit f.In Node Location List, enter [-0.6,0.8,0] g.Click Apply h.In Node Location List, enter [0.06,0.8,0] i.Click Apply b cde fghi Notes: These two nodes will be used to control the translation and rotation of the door

10 Create Fixed Displacements a.Click Loads/BCs icon b.Select Action to be Create c.Select Object to be Displacement d.Select Type to be Nodal e.In New Set Name, enter fixed f.Click Input Data g.In Translations, enter h.Click OK i.Click Select Application Region j.Select Geometry Filter to be FEM k.Select all nodes at bottom of seal l.Click Add m.Click OK n.Click Apply abcd ef g hijklmn

11 Create Deformable Contacts a a.Select Object to be Contact b.Select Option to be Deformable Body c.In New Set Name, enter seal_contact d.Select Target Element Type to be 2D e.Click Select Application Region f.Select Geometry Filter to be Geometry g.Select all surfaces of the seal on screen or enter Surface 1:7 h.Click Add i.Click OK j.Click Apply b cde f ghij

12 Create Rigid Contacts a bcd e fghijklm a.Select Option to be Rigid Body b.In New Set Name, enter door_contact c.Select Target Element Type to be 1D d.Click Input Data e.Select Motion Control to be Force/Moment f.In First Control Node, select the node at the center of the door or enter Node 2000 g.In Second Control Node, select the node on the left of the door or enter Node 1999 h.Click OK i.Click Select Application Region j.Select Geometry Filter to be Geometry k.Select all curves of the door on screen or enter Curve 1 2 l.Click Add m.Click OK n.Click Apply n

13 Create Displacements a.Select Object to be Displacement b.In New Set Name, enter translate1 c.Click Input Data d.In Translations, enter e.Click OK f.Click Select Application Region g.Select Geometry Filter to be FEM h.In Select Nodes, select the node at the center of the door or enter Node 2000 i.Click Add j.Click OK Repeat (b) – (j) for the following: New Set NameTranslationsSelect Nodes rotate1 Node 1999 translate2 Node 2000 rotate2 Node 1999 a bc d efghij The second control node defined in rigid contact is used to control rotation in radian (positive counterclockwise). This rotation is specified by T1 component in translation textbox.

14 Create Load Cases a.Click Load Cases icon b.Select Action to be Create c.In Load Case Name, enter translate d.Click Input Data e.Select fixed, rotate1, translate1, seal_contact, and door_contact f.Click OK g.Click Apply Repeat (c) – (g) for the following: a Load Case NameAssigned Loads/BC’ rotatefixed rotate2 translate2 seal_contact door_contact b cdefg

15 Define Material a.Click Materials icon b.In Material Name, enter rubber c.Click Input Properties d.Select Constitutive Model to be Hyperelastic e.Select Model to be Mooney-Rivlin f.In Strain Energy Function, C10, enter 80 g.In Strain Energy Function, C01, enter 20 h.Click OK i.Click Apply a bcdefghi

16 a.Click Properties icon b.Select Object to be 2D c.Select Type to be 2D Solid d.In Property Set Name, enter seal_prop e.Select Options to be Plain Strain and Standard Formulation f.Click Input Properties g.Click Mat Prop Name icon and select rubber h.In [Thickness], enter 1 i.Click OK j.In Select Members, select all surfaces of the seal on screen or enter Surface 1:7 k.Click Add l.Click Apply Define Element Properties abcd efghijkl

17 Create Load Steps a bc d efghij a.Click Analysis icon b.Click Load Step Creation c.In Load Step Name, enter translate step d.Click Select Load Case e.Select translate f.Click OK g.Click Apply Repeat (c) – (g) for the following: Load Step NameLoad Case rotate steprotate

18 Run Analysis and Read Results File abcd e fghi Select load step a.Click Load Step Selection b.In Step Select, select translate step, rotate step, and unselect Default Static Step c.Click OK d.Click Apply ** Wait until analysis is completed ** Read results file e.Select Action to be Read Results f.Click Select Results File g.Locate file seal.t16 h.Click OK i.Click Apply

19 Plot Results a.Click Results icon b.In Select Result Cases, select the last increment c.In Select Fringe Result, select Stress, Global System d.Select Quantity to be Max Principal e.In Select Deformation Result, select Displacement, Translation f.Click Apply Repeat (d) – (f) for Min Principal ab cdef Maximum compressive stress is 176 psi.Maximum tensile stress is 158 psi.