John Breslin Celtic Explorer - Generating Engine Alignment Problems John Breslin.

Slides:



Advertisements
Similar presentations
Tie rods or Tie bolts To understand the role played by tie rods, it is necessary to appreciate what is happening inside the cylinder of the engine. When.
Advertisements

F&T Inc. OVERHEAD CRANE SAFETY.
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
1.Quality-“a characteristic or attribute of something.” As an attribute of an item, quality refers to measurable characteristics— things we are able to.
Speech by Chinese Shipbuilding Industry ( CSNAME &CANSI ) Contents 1. The acceptation of IMO PSPC standard 2. Preparation done by Chinese shipbuilding.
Motor Leveling MECH 1200 Soft foot Condition: One or more of the mounting feet is not level with the others. Nuts loosen, vibration, misalignment Metal.
Security of Payment workshop Andrew Robertson Important Disclaimer: The material contained in this publication is comment of a general nature only and.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Motorized Tongue Jack Owners Manual Model SAFETY WARNINGS * Read, understand and follow all instructions before installing and/or using product.
SAFETY ALERT GIN WHEEL FAILURE 52m Gin Wheel A Gin wheel failed and fell from 52m. No property damage or Injuries were Sustained The following pictures.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
MAIN ELECTRICAL SURVEY ITEMS, GENERATORS AND GOVERNORS,, CIRCUIT BREAKERS, SWITCHBOARDS AND FITTINGS (Adapted from:D.T. Hall:Practical Marine Electrical.
How students check the progress of their applications Applicants can follow their progress by using Track. When each university or college makes a decision.
Ron DeJuliis, Commissioner of Labor and Industry Rob McGeeney, Program Manager Larry Kreseski, Chief inspector Department of Labor, Licensing, and Regulation.
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Proper Pump Installation Practices
BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Assignment#01: Literature Survey on Sensors and Actuators ECE5320 Mechatronics Assignment#01: Literature Survey on Sensors and Actuators Topic: Hydraulic.
Class and Statutory Surveys
Inspection and Maintenance of Isotope Radiography Systems
SHEAR AND MOMENT DIAGRAMS WITH APPLICATIONS IN TWO ORTHOGONAL PLANES
Quality Assurance/Quality Control Policy
IR-CAP Condition Assessment Program Indian Register of Shipping.
Rolling element bearings A. Lozzi 09
SystematicSystematic process that translates quality policy into measurable objectives and requirements, and lays down a sequence of steps for realizing.
Chain Inspection & Maintenance TM. If Chains Are Not Carefully Inspected for Wear And Properly Maintained, Ultimately They Will Fail.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD SFP Page 1 Design,
Essential reading: SPINČIĆ, A., PRITCHARD, B., An English Textbook For Marine Engineers 2, Pomorski fakultet, Rijeka LUZER, J., SPINČIĆ, A., Gramatička.
Receiving Inspection This is the inspection of the engine as it is removed from the aircraft and received at the overhaul site The purpose of the.
Optical Manufacturing Solutions 1 FOLLOW THE DIRECTIONS BELOW AFTER INSTALLING A NEW CUTTER BODY WITH POLISHING WHEELS INTO THE 7E TYPE MACHINES. IT IS.
MARINE CLAIMS Vidar Solemdal Senior Claims Executive, Gard AS January 15 th, 2014 The Nordic Association of Marine Insurers 1.
1 Analyisis application Incoterms EXW – Ex Works General notes  The seller delivers the goods at the moment that he places the goods at the disposal.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
CRANKSHAFT,MAIN BEARINGS & SHAFT ALIGNMENT
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
COMPOSITE TRANSPORT WORKSHOP ON DAMAGE TOLERANCE AND MAINTENANCE The information presented in this presentation is designated as proprietary to Air Flight.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Status of North Area Target (TCC2) & prospects EATM 28/07/2015D. Grenier1 Targets (T2, T4, T6 and T10) replaced in 2014 during LS1 (+ 4 spares) Previous.
Marine scientific and technical consultants and surveyors Providing comprehensive services in the marine and energy world Brookes Bell Group IMCC 2015.
Holding Down and Chocking The engine must be securely fixed to the ship. For this the engine is mounted on resin or cast iron chocks and bolted to the.
Project management Topic 7 Controls. What is a control? Decision making activities – Planning – Monitor progress – Compare achievement with plan – Detect.
HM Specialist Inspector of Health and Safety – Mechanical Engineering.
EliminationSubstitutionEngineeringAdministrationPPE Workplace Health & Safety.
CRITICAL THINKING AND THE NURSING PROCESS Entry Into Professional Nursing NRS 101.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
SHIP DAMAGE CLAIM. SHIP DAMAGE CLAIM Constructive Total Loss A situation where the actual total loss appears unavoidable or a partial loss has.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
CRANKSHAFT, MAIN BEARINGS & SHAFT ALIGNMENT. 1.CRANKSHAFT,MAIN BEARINGS & SHAFT ALIGNMENT 1.1 DEFINITION OF A CRANKSHAFT The crankshaft converts reciprocating.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Blocking a b c d.
Professor Alkis John Corres Ship Sale and Purchase.
Lifting with Equipment During assembly operations it may be necessary to lift or move heavy equipment. The equipment used to achieve this is covered by.
Income recognition. Exchange/Non-Exchange Transactions Income received or due to the University will either be part of an Exchange Transaction or a Non-Exchange.
Level 1 Diploma in Electrical Installation © 2014 City and Guilds of London Institute. All rights reserved. 1 of 7 PowerPoint presentation Supporting information.
Jacking The aviation technician must be familiar with the jacking of aircraft in order to perform maintenance and inspection. Jacking procedure is vary.
Building Planning and Drawing
A Sectional View shows what is going on inside an object
Landing gear systems.
DESCRIPTION AND GUIDE TO OPERATIONS
AIRWORTHINESS OF AIRCRAFT
TIPS TO MAINTAIN YOUR NEW AUDI CAR. THESE ARE THE THINGS TO BE TAKEN CARE TO AVOID DAMAGES FOR YOUR HEAVY INVESTMENT CAR, PEOPLE SEARCH MORE USED AUDI.
SAFE WORK INSTRUCTIONS
F&T Inc. OVERHEAD CRANE SAFETY.
Correct Procedures for Changing, Storing, and Maintaining Saw Blades
Presentation transcript:

John Breslin Celtic Explorer - Generating Engine Alignment Problems John Breslin

The Problem   While carrying out a starboard generating engine scheduled 20,000 hour overhaul and Class survey at the A&P Shipyard, Falmouth, what appeared to be a small area of de-lamination was discovered in the main journal/thrust.   Further examination of the crankshaft in the workshop found the journal not to be delaminated but layered with white metal in one area near the oil hole.   Following re-assembly, the engine could not be aligned with the alternator. Further investigation on 23 January 2008 found that the transportation plates had not been removed from the engine movement limiters at the time of new building.   Study of the port and centre engines also revealed that the transportation plates were still fitted.

Condition of Class   The engine manufacturer Wartsila forbade any further operation of the engines until rectification work had been carried out and Lloyd’s Register placed a Condition of Class upon the vessel.   Examination of the flexi-mounts on all engines found them to be suffering from a high level of creep/settlement, having been subjected to an abnormal operating environment. The attending Metallistic (Trelleborg) specialist advised that although good enough to remain in operation for the short term, they should all be renewed. Unfortunately, new flexi-mounts could not be obtained at short notice.

Condition of Class Cont. Lloyds requiring that certain criteria be met prior to lifting the condition, of class as follows:- 1. All flexi-mounts to be examined/replaced as required. 2. All travel chocks to be removed and engines restored to correct running criteria. 3. Engine alignment to be checked and restored to recommended running parameters. 4. Crankshaft deflections to be returned to recommended running parameters. 5. Engine blocks to be inspected. 6. Engine bed frame to be examined. 7. All bolts and bolt holes to be inspected. 8. All main bearings to be inspected. 9. Vulkan coupling between engine and alternator to be inspected/replaced. 10. All alternator bearings to be inspected/replaced as required. 11. Electrical status of alternators inspected and checked. 12. Wartsila must sanction unrestricted use and operation of all engines prior to operation.

Back in Class   In order to comply with the above criteria, Wartsila technicians attended and removed all transportation plates prior to examining the bearings and re-aligning all three engines to the alternators.   With the exception item 1, the above work was carried out to the satisfaction of Lloyd’s attending surveyor, who lifted the initial Condition and imposed a further Condition of Class, recommending that all flexi-mounts were to be renewed within three months, extended only after further survey if the delivery time is delayed.

Transportation Plates or Engine Movement Limiters   The photograph below shows an engine limiter of which there are two fitted to each side of each engine.

Transportation Plates or Engine Movement Limiters   Transportation plates hold the engine rigidly for transportation purposes and should be removed when fitting into the vessel to give a limiter clearance of 6 mm. Thus the engines rest on the resilient mounts and are free to move within the specified clearances.   The above photograph is of one limiter on the “Celtic Explorer” and clearly indicates the lack of any clearance due to the transportation plates being still in place and which are effectively holding the engine in a rigid position, vertically, axially and laterally.   The above condition was common to all limiters on all three generating engines.

Transportation Plates or Engine Movement Limiters   The drawing below is a side elevation showing the resilient mounts and limiters. Engine movement limiters

The photograph below shows the Vulkan coupling rubber element taken from the starboard engine which has suffered fatigue and ultimate cracking due to abnormal operating conditions. The port engine coupling also suffered from fatigue and cracking to a lesser extent.

The photograph below is of a bedplate mounting Metalistic series super ‘D’ flexi-mount which clearly shows fracturing at the ends caused by abnormal high stress due to an incorrect working environment.

This next photograph is of an engine mounting metalistic series’D’ flexi- mount showing tearing of the rubber under load. Condition of all super ‘D’ and ‘D’ types was found on the occasion of previous survey to be similar and obviously requiring renewal.

The photograph below show one engine limiter. Following removal of transportation plates, the 6 mm clearance can be clearly seen in all planes.

Manufacturers Instructions   Wartsila Installation procedure advises that additional distance plates are installed behind the rubber elements in the limiters for transportation. Remove the additional distance plates and adjust all clearances to 6 mm. The clearance is adjusted by adding or removing distance plates of different thickness, delivered in 1 mm, 5 mm and 6 mm thicknesses.   The above would indicate that it is the responsibility of the shipyard to ensure that correct clearances are obtained. However, commissioning of engines is more often than not the responsibility of the engine builder.   In any event, Owners could not possibly have known about the transportation plates, engines having been installed and commissioned prior to delivery as the initial Wartsila maintenance manual issued to Owners makes no mention of limiters, only stating that the flexi-mounts are to be inspected at 24,000 hours and replaced if necessary.

Current Situation   Wartsila confirmed that the transportation plates were still in place at Falmouth following the 20,000 hours overhaul in December 2007/January 2008 and most definitely should be removed prior to operation. They have also agreed that the transportation plates were not removed prior to commissioning in   Following exhaustive investigation and in light of findings MI alleged that damage sustained in way of the port and starboard generating engine crankshafts and the ensuing abnormal conditions found in way of all three generating engines is as a result of shipbuilders and/or engine manufacturers negligence by way of not removing the transportation plates from the engine limiters prior to installation and commissioning in   The case has now gone to arbitration; however the Marine Institute has decided not continue its involvement in the arbitration and so the engine damage claim is now being pursued by the underwriters.

Final Thoughts   Costs for all of the repair works are subject to a claim under the owners H&M policy and this claim is progressing well.   A 20% loading on the policy for 2009 will come into effect pending the outcome of the arbitration process.   Insurance – If the MI were self insured pursuit of this claim through arbitration would be unavoidable to recover of costs.   Damage resulted in the charter of the Thalassa; however, the MI decided not to pursue a claim for consequential losses.   Food for thought - ICES 209 achieved even with limiters in place!