MICE 23.02.2007 1 Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.

Slides:



Advertisements
Similar presentations
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
Advertisements

Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
THE MICE RF SYSTEM J.F.Orrett* A.J.Moss, ASTeC, Daresbury Laboratory, WA4 4AD, UK Accelerator Science and Technology Centre
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
D. Li – RF Session Summary at CM17, CERN, Switzerland (25 February 2007) 1 Summary of RF Sessions Derun Li Center for Beam Physics Lawrence Berkeley National.
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
Status of the MICE Amplifier
H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 1 RF & RF power H. Haseroth CERN  Situation of 88 MHz test cavity  Availability of amplifiers.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Potential improvements of the PS 10 MHz cavities driving amplifier G. Favia Acknowledgments: V. Desquiens, F. Di Lorenzo S. Energico, M. Morvillo, C.
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Proton driver front end test stand Plans and organisation for 2004–05 David Findlay ISIS Accelerator Division STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
1 paul drumm, 19 th May 2004 MICE RF By Phone at 16:00 FNAL: Al Moretti LBNL: Derun Li
Electrical & Control Power Supplies Trevor Hartnett.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
XII-th Collaboration MeetingJan 18, House1 LOI PROGRESS: JANUARY 2008 AT THE HALL 2 Yoshiro Irie, KEK for the LOI/SH collaboration.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
High Gradient RF Issues and 88 MHz test results M. Vretenar for the 88 MHz team: R. Garoby, F. Gerigk, J. Marques, C. Rossi, M. Vretenar -The.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Status of the 1.2 MW MB-IOT for ESS Morten Jensen CLIC Workshop 2016, January, CERN.
RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes.
POPS: Power for PS A novel 60 MW Pulsed Power System based on Capacitive Energy Storage Jean-Paul Burnet June 2010.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
DESIGN STUDY November 28 th - 30 th 2005First EURISOL Design Study TOWN MEETING High Power RF Amplifiers Development at LNL Fabio Scarpa - INFN LNL.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Areal RF Station A. Vardanyan
Challenges of Dual Harmonic RF Systems
MICE RF System Power Supplies, Control and Monitoring Status report
Visit for more Learning Resources
Construction and Commissioning of Electronic Test Benches
Construction and Commissioning of Electronic Test Benches
RF operation of REX-ISOLDE
RF Status 1 4 High Power Amplifier circuits available CERN(2)
Klystron Power Supplies for ILC
CEPC RF Power Sources System
The 9th Collaboration Meeting
IOT operation in the SPS Long term experience TWC 800 MHz
Presentation transcript:

MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF

MICE The CERN Linac1 Amplifiers Developed in (photo of 1959) for the old Linac1. Frequency MHz, equipped with the TH170R triode, can deliver a maximum of 2.5 MW with an anode voltage of 40 kV. The tube is water cooled, and can operate at a maximum of 0.3% duty cycle. The unit is about 3.6 m high, 1m x 1m base.

MICE Linac1 amplifiers history  From the very beginning, these amplifiers experienced problems in reaching the peak power of 2.5 MW: breakdowns in the power extraction system (later modified to a single loop and used up to ~1.5 MW) and in the anode resonator. Linac1 (protons, heavy ions) was decommissioned in After Linac1 decommissioning a standard “modernization kit” (series of mechanical modifications intended to improve reliability and easy operation) has been developed for these units. Most of the Linac1 amplifiers have been modernized and reused in other installations: spare for Linac3 (400 kW), 1 for Linac2 RFQ (1 MW), 2 at the AD-RFQ (0.3 and 1.6 MW).

MICE What is left of the Linac1 amplifiers? Only 2 units left, one was modified for 101 MHz and then 88 MHz (gradient test for bunch rotation cavities in NF), the other is a cannibalised spare, stored in a hall for 50 years.

MICE Maximum Power for Linac1 amplifiers F The maximum power achieved recently (1996) on these units was 1.7 MW (AD-RFQ final amplifier, power limited by sparking and matching of the output loop). The first demand from MICE was for 4 MW out of a single unit equipped with TH116. Discarded because required an expensive radical reconstruction of the amplifier (anode blocker capacitor, HOM suppression, double output, increased resonator diameter) and no guarantee of success (bad experiences in the past at CERN with pushing TH116 to its limits). Instead, preferred to prepare the 2 remaining amplifiers for 2 MW each. Only minor modifications (together with standard upgrade kits) should be required to go from the 1.7 MW measured in 1996 to 2 MW.

MICE Caveats F The refurbishment of the linac amplifiers for MICE has been authorized by the AB Department (Nov. 06), but there are still some doubts concerning the level of UK support to CLIC… F The CERN Linac RF team is heavily involved in Linac4 and from next year will work 100% on this project  it is now or never, this year we still have a window for at least starting refurbishing the amplifiers, from next year it will be very difficult.

MICE Refurbishing details 2 “standard” upgrade kits will be applied to the amplifiers: 1.Add neutralization circuit, improve RF contacts and socket. 2.Modernize electronics: add industrial filament regulator controlled by PLC, new circuitry for transformer feeding. + replace the output loop with a “tapping”, which should allow increasing power from 1.7 to 2 MW. Work not going to be easy… many pieces have to be remade, and few drawings exist! We have to copy from our spare unit.

MICE What exactly we will do It is not possible to test the amplifiers with RF power at CERN (no anode supply, no RF drive). They will be tested at CERN up to the “filament” level: filament heating, test of cooling circuits. The RF part (input matching, resonator tuning, output matching) will be done to the “theoretical” calculated values. Input-outputs: - 3 1/8” input connector - 6 1/8” output connector (a bit at the limit for 2 MW…) - RG220/U cable for HV connection - electrical and water connections Note that for a DC power supply, these unit need a cathode switch circuit (not provided by CERN)

MICE Organisation of work Principle: the reconstruction is done at CERN, up to the testing of filament. Then, the amplifier is transferred to RAL or Daresbury for the RF tests. At CERN: 1.Collect drawings, and design modified parts. 2.Make inventory of existing and missing parts. 3.Machine mechanical parts. 4.Dismount, clean, reconstruct amplifiers. 5.Assemble ventilation circuitry. 6.Assemble filament circuit and filament regulation (PLC based, CERN standard) 7.Test filament and ventilation These activities can be realized with minimum support of CERN staff if temporary labor is used for: draftsman/designer, mechanic, wireman. At MICE: 1.Install cathode switch circuit (eventually also HOM suppressors). 2.Connect HV and RF loads. 3.Test with RF power.

MICE Status The 2 units for MICE (blue) and the spare CERN unit used as example (green)

MICE Other available RF equipment We have 2 old Linac1 Modulators (=pulsed anode supplies) for kV, ~80 A, 1 Hz, 200  s that we need to clear in order to free space. If they can be useful, please show up, otherwise at the beginning of March we will scrap them.