Tremco’s Sacramento & Reno Team Don Metzger Field Advisor Bill Burke Field Advisor Dan Hanley Tech Serv. Mgr. 20+ Tech Service Representatives.

Slides:



Advertisements
Similar presentations
SoCo Roofing Services 1397 Duncan Lane Suite D Auburn, Ga (Fax) Were Fixing Your Leaks Across the South East!!
Advertisements

Lee County Electric Cooperative 2006 Hurricane Preparedness Plan.
Where do you go from here? There are many opportunities awaiting you – but it is all up to you! There are many opportunities awaiting you – but it is all.
Delivering Successful Facility Projects It Starts and Ends with You!
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Your Intelligent Robotics Partner Adept Service & Support Design Us In CD 2007 Design Us In CD 2007.
Project Delivery Methods. Traditional Owner Design/ Design/Bid/Construction Selection Build Owner’s Vision Owner’s Vision Owner’s Vision Complete Design.
Placer County Joint GRC 1 3/20/13 | SCOE | CRANE CA Career Pathways Trust $250 million grant pool 10 awards at $15 million 15 awards at $6 million 15 awards.
COUNTY OF SAN DIEGO DEPARTMENT OF PUBLIC WORKS County of Los Angeles Public works 2015 Sustainable Pavement Round Table February 10, 2015.
PAVEMENT REPAIR METHODS
Mecklenburg County – Code Enforcement Land Use & Environmental Services Agency.
Roof Analysis Summary (online view). Roof Drawing (online view with priority color & penetrations)
3/27/2015 NE Region Trails Coordinator Update. WSTA, Snowmobile Patrols and Riding Time Vail Pass, Grand Lake, Tiger Run, and Jones Pass Grand Lake –
Design Aspects of the Arboretum Green Roof Green Roof Symposium.
ePermitting Roofing System Boris Sursky LEED AP BD + C
Project Close Out CTC-470.
Stone Lake Condominium Association Annual Co-Owner Meeting Thursday, May 18, 2006 The Hannah Center, East Lansing.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Saint Charles, IL IASBO Facilities Management Committee Presentation 1 What Don’t I Know About Facility Management ? 60 th Annual Conference.
Discussion of RACTC Evaluation Report and Request for Direction for Promoting the Use of RAC.
New Procedures for Sourcing Public Works Construction Webinar Presentors: Richard Sawyer / GSFIC Darryl Mitchell / SPD.
Construction Administration & Project Acceptance Welcome Scott Kirchner, Altus Architectural Studio Jon Hilton, Farris Engineering Jason Studt, JE Dunn.
Bridge Engineering Section Bridge Rehabilitation.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed.
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects 1.
ENERGY EFFICIENCY AND ROOFING. ROOFING 101 – AN OVERVIEW.
Flood Emergency Preparedness Darren Suen, PE, MBA, PMP Chief, Flood Operations Center Hydrology and Flood Operations Division of Flood Management Preseason.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
The Owner’s Perspective
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
We’re Fixing Your Leaks Across the South East!!
Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc.
Building Project Milestone December 16, Lantana Road, Lake Worth, FL
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
Waste Tire Enforcement Grant Program Integrated Waste Management Board –Georgianne Turner (916) $30 Million Waste Tire Recycling Fund –$1.75 per.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
About SRG Founded in the year 2003 Provides commercial, industrial and multifamily roofing services in the state of Texasmultifamily roofing services.
Expert Roofing Contractor in AdelaideRoofing Contractor in Adelaide.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
BOARD AGENDARegular Reconvened Meeting PULASKI COUNTYThursday, May 14, l998 BOARD OF SUPERVISORS6:30 p.m. TIME & ITEMPRESENTED BY 6:30 p.m. 1. Joint Meeting.
SB411 (2015): Public School Overcrowding and Repair Needs Committee Presentation to the Reno City Council October 7, 2015 Dylan Shaver.
Overview WMU – Case Study Software Demonstration Best Practices
Capital Facilities Program Update San Rafael City Schools
Westshore Exterior Renovation Project 02/16/17.
Software Quality Control and Quality Assurance: Introduction
MnDOT Budget Overview House Transportation Finance Committee Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer February.
Implementation of Computer Maintenance Management system - CMMS
Legal requirements and contractual duties
Glenn County August 1, 2017 Andy Roth, Director of Energy Services
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects & the Roles and Responsibilities.
Grant Orientation Session
ChE 473K Plant Design R. Bruce Eldridge.
Thank you to our Sponsors
Pre-contract Planning and Practice
CDBG and HOME Program Efficiencies – Thoughts on Current Events
ePermitting Roofing System
ISO-9001 Quality Management System
Grant Orientation Session
Sacramento District Church of the Nazarene
SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE
M E A S U R E ‘G’ P R O G R A M U P D A T E
Construction Management Services April 16, 2018
Presentation transcript:

Tremco’s Sacramento & Reno Team Don Metzger Field Advisor Bill Burke Field Advisor Dan Hanley Tech Serv. Mgr. 20+ Tech Service Representatives

Local Tremco Projects

Hot applied BUR

Cold applied BUR

SBS Modified Roof System

Single-ply in progress

Single-ply completed

Metal in progress

Metal completed

Restoration in process

Restoration completed

Services Included…  Inspection of the roof before the project.  Coring and repairing the roof to verify construction.  Assisting Owner with roof selection, options, and budgets.  Assistance to architect, consultant, or staff engineer to develop specs and details for the project.  Approved Contractor base that are familiar with Tremco’s high standards for quality.  Attendance at pre-bid meeting, pre-con meeting, progress meetings, etc…  Jobsite inspection and reporting.  Final inspection and warranty.  Warranty that provides for inspections and preventative maintenance several times over the warranty period.

Tremco Contracting Services

Roof Inventory & Condition Assessment Roof Inventory & Condition Assessment

Roof Maintenance Programs

Patch & Repair / Emergency Leak Services Patch & Repair / Emergency Leak Services

Diagnostic Services Diagnostic Services

Satisfied Tremco Customers Nevada JUHSD Rio Linda USD Roseville City USD Elk Grove USD Sacramento City USD Yolo County City of Yuba City Butte County CSUS – Housing Lake Tahoe USD Cal-Trans, Marysville East Nicolaus JUSD City of Sacramento Amador County Schools NEC Electronics Intel Marshall Hospital City of Roseville Buckeye USD Sierra Nevada Memorial Hosp. Del Paso Heights Schools Paradise USD State of CA – DGS Beale AFB

Thank You! Bill Burke cell fax Don Metzger cell fax