Sacramento District Regional Vegetation Variance Paige Caldwell, P.E. Emergency Manager.

Slides:



Advertisements
Similar presentations
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Advertisements

SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
US Army Corps of Engineers BUILDING STRONG ® Public Law 84-99, Rehabilitation and Inspection Program Mike deMasi Chief Emergency Management, PL Program.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
National Bridge Inspection Standards (NBIS)
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Recently Issued OHRP Documents: Guidance on Subject Withdrawal and Draft Revised FWA Secretary’s Advisory Committee on Human Research Protections October.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
NFIP ESA ComplianceImplementing a Reasonable and Prudent Alternative – FEMA Region 10 ESA and the National Flood Insurance Program Implementing a salmon.
Engineer Circular Requests to Alter USACE Projects
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
Protection Against Occupational Exposure
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Sector Planning Process Alachua County Commission July 8 th,
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration Review Processes Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration.
Driving Indiana’s Economic Growth. Management and Preservation of Indiana's Historic Bridges: A Programmatic Approach Thanks to Mead & Hunt & FHWA-IN.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
Module 7: Construction Phase
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
NIST Special Publication Revision 1
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Patient Protection and Affordable Care Act March 23, 2010.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
We have reviewed this material in accordance with U.S. Copyright Law and have tried to maximize your ability to use, share, and adapt it. The citation.
SUMMARY OF INFORMAL COMMENTS Temporary Waiver of Terms Regulations May 2006.
Corps of Engineers Levee Safety Program Levee Safety Program Manager
US Army Corps of Engineers BUILDING STRONG ® PLANNING GUIDANCE Planning Principles & Procedures – FY11.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Endangered Species Act Counterpart Regulations for National Fire Plan Projects Bureau of Land Management Forest Service June 9, 2004.
Programmatic Regulations PDT Workshop COMPREHENSIVE EVERGLADES RESTORATION PLAN April 18, 2002.
Responses to Levee Certification Requests 1.Closures 2.Maintenance Plans 3.U/S and D/S Levee Tie-ins.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
National Levee Safety Act, Title IX, WRDA 2007 Update for Levee Summit Eric Halpin, P.E. Special Assistant for Dam and Levee Safety Headquarters, US Army.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
LEVEE PERMIT SUBMITTAL & REVIEW PROCESS. Federal Law CODE OF FEDERAL REGULATIONS TITLE CHAPTER II -- CORPS OF ENGINEERS, DEPT OF THE ARMY, PART.
Condition Assessment Of The Hurricane Protection System Larry B. Ardoin, P.E. DIRECTOR, HURRICANE PROTECTION OPERATIONS.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
ECOS Information Session Draft EPA Quality Documents February 13, 2013 Presented by EPA Quality Staff, Office of Environmental Information For meeting.
National Public Health Performance Standards Local Assessment Instrument Essential Service:6 Enforce Laws and Regulations that Protect Health and Ensure.
Presented to: Central Valley Flood Protection Board August 23, 2013 Sacramento Area Levee Accreditation Key Results from Encroachment Analysis.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
BUILDING STRONG ® Levee Safety Program  Levee Safety Program Implementation Guidance provided by HQUSACE in 2007 (Post Hurricane Katrina) ► Designate.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
VETERANS HEALTH ADMINISTRATION SLIDE 0 New Requirements for VA ORD Investigators: Implementation of Data Management and Access Plans.
Director’s Order 12 contains information concerning review of other agency proposals.
GBLWMP-SLUP Integration February 5, 2010 Deline. Ecological Integrity Policy GBLWMPSLUP (a): All activities in the GBLW must be consistent with.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Shariq Husain, PE INDOT Roadway Review Engineer Highway Design and Technical Support Proprietary Materials – Approval Process.
US Army Corps of Engineers BUILDING STRONG ® Flood Fighting and Planning US Army Corps of Engineers Omaha District Joel Ames Tribal Liaison.
K1 Proposed National Levee Safety Program An Introduction for the Tribal Assistance Coordination Group May 12, 2011.
Draft Central Valley Flood Protection Plan Investment Strategy
Submittal And Review Of New And Revised Water Quality Standards
Continuing Authorities Program
Flooding Walkdown Guidance
Revolutionize USACE Civil Works
SPR-B Research Coordination Webinar
EPA’S ROLE IN APPROVING BASIN PLAN AMENDMENTS
New Special Education Teacher Webinar Series
Presentation transcript:

Sacramento District Regional Vegetation Variance Paige Caldwell, P.E. Emergency Manager

Sacramento District Overview –Key points from the ETL guidance –Vegetation variance authority and background –Key points of variance guidance –Next Steps

Sacramento District Key points from the newly revised ETL guidance: –Public safety is the number one priority of the USACE Levee Safety Program. –This ETL does not establish new standards, but clarifies, and supersedes, those formerly presented in EM (Jan. 1, 2000). –An Independent External Peer Review, conducted in 2008, and Independent Technical Review validated the ETL based upon existing and available engineering and scientific data. –USACE is currently undertaking a two-year research program to enable reassessment of its engineering-based understanding of the public safety consequences of vegetation on FDR projects.

Sacramento District Key points (continued) –It is essential that FDR systems retain structural integrity, functionality, and safety; it is also necessary to be able to inspect, monitor, and flood-fight the projects. –The local sponsor may request a variance from the standard vegetation guidelines as presented in the ETL. –Fifteen feet, or to existing project easement, is the minimally accepted vegetation free zone (VFZ). To date, no research exists to justify a reduction to existing standards. –The ETL discusses a limited range of conditions under which a variance to vegetation standards may be granted.

Sacramento District Key points (continued) –Any addition of landscape plantings to existing FDR systems must comply with the project’s Operations and Maintenance manual. New plantings with an engineering evaluation may be approved on a case by case basis. –Once new projects are completed, O&M manuals will be updated to reflect requirements for vegetation maintenance. –Planned research is intended to compliment the ETL guidance. –The use of suitable vegetation, such as shrub forms of willows, riverward of the vegetation-free zone is encouraged as an environmentally beneficial means to moderate erosion potential of water currents and wave action.

Sacramento District Levee Section - Basic

Sacramento District Levee Section with Ordinary High Water Mark above the Riverside Toe

Sacramento District Regional Vegetation Variance – Authority and Background Section 202(g) of WRDA 96 Required the Corps to undertake a comprehensive review of its levee vegetation policy to address regional variations in levee management and resource needs Review included: – Examining current policies in view of the varied interests in providing flood control –Preserving, protecting, and enhancing natural resources –Protecting the rights of Native Americans pursuant to treaty and statute Policy Guidance Letter will supersede ER & EP vegetation variance procedures

Sacramento District Regional Vegetation Variance Requirements Preserve, protect, and/or enhance natural resources, and/or protect rights of Native Americans Maintain the safety, structural integrity, and functionality of the levee Retain accessibility for inspection and flood fighting purposes

Sacramento District Regional Vegetation Variance – Contents General description of the levee system Detailed and annotated plans and section drawings Explanation of reasons the proposed changes are necessary to preserve, protect, and enhance natural resources and/or protect the rights of Native Americans pursuant to treaty and statute. What alternatives to a vegetation variance were considered and why the proposed changes were the only feasible means to provide the benefits to natural resources and/or to protect the rights of Native Americans. An engineering analysis showing that the changes proposed will ensure that safety, structural integrity and functionality are retained and accessibility for maintenance, inspection, monitoring and flood fighting are retained. The most recent Routine Inspection Report and Periodic Inspection Report completed by the USACE district. Summary of system performance history for any and all significant flood events. Any National Environmental Policy Act (NEPA), Endangered Species Act (ESA), and any other environmental compliance documentation that the district determines are required in order to conduct the review.

Sacramento District Regional Vegetation Variance Geographic Limits –Variances will be considered only for individual levee systems or portions thereof. A levee system consists of one or more segments and associated features which collectively provide flood, storm, or hurricane damage reduction to a defined area. Failure of one feature or segment within a levee system may result in failure of the entire system. Levee systems may consist of embankment sections, floodwall sections, closure structures, pumping stations, interior drainage works, and flood damage reduction channels.

Sacramento District Regional Vegetation Variance Operations & Maintenance During inspections, levees will be rated for vegetation in accordance with approved variances. The associated vegetation management plan and approved variance shall be added to the levee’s operation and maintenance manual as an addendum.

Sacramento District Regional Vegetation Variance Coordination with Resource Agencies –The district shall notify the appropriate regional offices of the federal resource agencies when a vegetation variance request has been received. –The sponsor is responsible for providing all NEPA, ESA Section 7 consultation, and any other environmental compliance documentation required by the district to analyze the request –The sponsor must commit to implementation of any measures (such as monitoring, reasonable and prudent alternatives, etc.) needed to comply with ESA before the sponsor may participate, or continue participation, in the Public Law 84–99 program. Further, the sponsor must commit to bearing the cost for implementation of any measures required to comply with ESA.

Sacramento District Regional Vegetation Variance Limitations –No vegetation variance involving woody vegetation, as defined in ETL 1110–2–571 shall be granted for the following portions of a levee: Upper third of the river-side (or floodside) slope Crown, Land-side (or protected-side) slope Within 15 feet of the land-side (or protected-side) toe (subject to preexisting right-of-way). –The vegetation variance process is not a mechanism to validate conditions that have developed as a result of inadequate operation and maintenance. –Waterside planting berms are allowed only by approved variance.

Sacramento District Regional Vegetation Variance Rehabilitation –Rehabilitation. Any levee repairs, modifications, or improvements made as a result of the emergency event shall be in accordance with current USACE vegetation management standards or approved vegetation variance for the levee system.

Sacramento District Regional Vegetation Variance Review and Approval The timeline for the ATR will depend on the complexity of the request, but will not exceed 90 days unless special circumstances warrant additional time. Approval Authority: HQ Levee Safety Officer

Sacramento District Regional Vegetation Variance Current Variances All existing vegetation variances, agreements, or other deviations, that are not submitted for an ATR via the process described herein, by 30 September 2010, may no longer be considered valid.

Sacramento District Regional Vegetation Variance Next Steps Draft policy guidance letter posted in Federal Register on February 9, 2010 – 75 day public comment period (ends 25 April 2010) Draft EA/FONSI available at in docket number COE–2010–0007

Sacramento District Questions?