Guidelines for the Development of Process Specifications, Instructions, and Controls for the Fabrication of Fiber-Reinforced Polymer Composites by Liquid.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

ASPRS 2005 Annual Conference, Baltimore, Maryland Camera Calibration, Characterization and Contracting Guidelines: An Quality Assurance Perspective U.S.
1 FAA/NASA/Industry Review of Key Characteristics for Composite Material Control Mark Chris, Principal Engineer Bell Helicopter Textron Composite M&P /
Fiber Reinforced Plastic beam manufacturing process
Product Design. Graduates  The graduate with a Science degree asks, "Why does it work?"  The graduate with an Engineering degree asks, "How does it.
World Health Organization
PPAP Requirements Training
SPRAY-UP. WHAT IS SPRAY-UP? one or more continuous fiber rovings fed through a chopper one or more continuous fiber rovings fed through a chopper fiber.
Good Manufacturing Practices Guilin, PRC Dr AJ van Zyl for Quality Assurance and Safety: Medicines Medicines Policy and Standards Health Technology and.
First Article Inspection Report
ISO 9001 : 2000.
World Health Organization
World Health Organization
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Module 12 – part 2 | Slide 1 of 35 January 2006 Basic Principles of GMP Documentation Part 2 15.
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
Review of FAA Guidelines for Fabric Prepreg Material Specification
0 FAA Workshop on Key Characteristics for Composite Material Control September 16 th – 18 th, 2003 Alan J. Norwid Principal Engineer M&P Ext.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
9/17/2003 1LRM Spec Review LRM Material and Process Spec Review Cindy Cole Certification Manager The Lancair Company.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
FAA Workshop on Key Characteristics for Advanced Material Control
Guidelines and Recommendations for the Development of a Material Specification for Carbon Fiber Reinforced Liquid Resin Molded Materials Gregg Bogucki.
FAA Workshop on Key Characteristics for Composite Material Control
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
FAA FAA Advisory Circular Presented at 9/16/03 Workshop (Chicago, IL) Background – Purpose of the advisory circular – Related regulations & guidance materials.
L. Gintert – 8/8/02 Other Product Forms Considerations RTM and VARTM RTM and VARTM –Materials (Constituents – resin, fiber, tackifiers, cores, stitches/pins,
Review of Liquid Resin Molding Specifications FAA Workshop September 2003 Scott Reeve National Composite Center.
Quality control of raw materials In-process control
ISO 9000 Certification ISO 9001 and ISO
4. Quality Management System (QMS)
World Health Organization
Qualification of HVAC systems
4. Quality Management System (QMS)
Huzairy Hassan School of Bioprocess Engineering UniMAP.
Radiopharmaceutical Production
Documentation –Part 2 Basic Principles of GMP Pharmaceutical Quality,
Guidelines for Carbon Fiber Tape Prepreg Specifictions W.T.McCarvill S.Ward August 6, 2002.
World Health Organization
Good Laboratory Practice
Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 4 GMP Workshop Kuala.
Mechanical Engineering Department Advanced Composites Dr. Talal Mandourah 1 Lecture 11 & 12 Processing Routes Molding Compound -Short fibers, preimpregnated.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
Introduction to Equipment
Basic Principles of GMP
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Receiving Inspection Process for Components and Finished.
VALIDATION METHODOLOGY
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
DOT/FAA/AR- 02/109 Guidelines and Recommended Criteria for the Development of a Material Specification For Carbon Fiber/Epoxy Unidirectional Prepregs Overview.
Sampling and Testing Concrete Mixes MATERIAL TESTING LABORATORY
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
Mechanical Engineering Department Advanced Composites Dr. Talal Mandourah 1 Lecture 9 & 10 Processing Routes Hot-melt Impregnation system Step 1 Preparation.
AP 220: PCA Process Planning MANUFACTURING SPECIFIC PRODUCT INFORMATION PROCESS/FACTORY CHARACTERIZATION PCB Fabrication PCA Assembly Variability Characteristics.
Sterile product validation
Duties and Responsibilities
Module 12 - part 2Slide 1 of 23 WHO - EDM Basic Principles of GMP Documentation Part 2 Part One, 14.
Polymer Matrix Composites Matrix Resins and Composite Fabrication
In the name of God. Common Technical Document On Biotech.
Quality Control and Troubleshooting Arista Biologicals Inc.
World Health Organization
AND AFTER INSTALLATION Technical Director, NASSCO
Uniting composite manufacturing theory and application
Author: Nurul Azyyati Sabri
Documentation –Part 2 Basic Principles of GMP Pharmaceutical Quality,
Quality Systems in a Production Facility
Good Laboratory Practices
First Article Inspection
Supplier Briefing Pack
Fiber Reinforced Polymer Systems
Presentation transcript:

Guidelines for the Development of Process Specifications, Instructions, and Controls for the Fabrication of Fiber-Reinforced Polymer Composites by Liquid Molding Larry Gintert & John Bayldon

17 th Sept 2003 Larry Gintert John Bayldon Liquid Resin Molding Liquid Resin Molding (LRM) processes are classified as any processes where liquid resin is infused into a dry fiber perform. Closed-Cavity Mold - Open Cavity Mold - All surfaces controlled by rigid tooling Only a portion of the part controlled by rigid tooling

17 th Sept 2003 Larry Gintert John Bayldon Objective Guidelines for the development of liquid resin molding (LRM) process specifications for the fabrication of continuous fiber-reinforced polymer composite test panels used in the generation of mechanical properties An approach for the validation of composite LRM fabrication processes used during the certification of composite aircraft structure

17 th Sept 2003 Larry Gintert John Bayldon LRM Process Flow Resin Mixing Mold Assembly/ Closure Infusion Cure Demolding Resin Reception/Storage Fiber Reception/Storage Other Included Items Reception/Storage Preform Assembly Mold Preparation

17 th Sept 2003 Larry Gintert John Bayldon Certification Process Certification Process Design validation process: to establish by proof, is accomplished through – Verification (to prove by evidence) and – Qualification (to define attributes or characteristics) of the materials, processes, and analysis tools.

17 th Sept 2003 Larry Gintert John Bayldon Material Qualification Material Qualification Qualification tests are planned and conducted to – Establish key material attributes – Establish material performance properties – Verify material characteristics will work in the intended application. The objective in defining material attributes is to establish the constituent material property limits.

17 th Sept 2003 Larry Gintert John Bayldon Preform Attributes: Fiber pedigree Ply dimensions, alignment and stacking sequence Shaped preform contours De-bulked preform fiber volume Fiber sizing level and type, Quantity of tackifiers and/or binders used, and Compatibility of constituent materials with each other

17 th Sept 2003 Larry Gintert John Bayldon Liquid Resin Attributes Initial mix viscosity (at a defined temperature) Initial mix heat of reaction (  H ult ) Mix chemistry (e.g. ratio of epoxide:amine groups in some epoxy chemistries) Amount of entrained air or solvent Thermal conductivity

17 th Sept 2003 Larry Gintert John Bayldon Process Specification Guidelines Process specifications Material specifications Planning Work instructions Test plans

17 th Sept 2003 Larry Gintert John Bayldon Fabrication Specification Sections Fabrication Specification Sections Work Instructions Personnel Materials Equipment Description Facility Description Tooling Panel Lamination Panel Acceptance Process Monitoring

17 th Sept 2003 Larry Gintert John Bayldon 2.1 Work Instructions Requirements and procedures to be used in the fabrication process. Detailed step-by-step work instructions in conjunction with process specifications

17 th Sept 2003 Larry Gintert John Bayldon 2.2 Personnel Recommended Personnel Selection Factors – Experience – Inspection personnel, ratio to manufacturing personnel – Level of training – Personnel status identified (qualified or unqualified)

17 th Sept 2003 Larry Gintert John Bayldon Materials Controls Traceability – From raw fiber, or basic raw materials Storage Requirements – Humidity – Temperature Records

17 th Sept 2003 Larry Gintert John Bayldon 2.4 Equipment Description Equipment Calibration – Ovens – Liquid resin delivery devices (such as pumps) – Thermocouples – Vacuum gages, and ply-warming devices (e.g., hot-air guns)

17 th Sept 2003 Larry Gintert John Bayldon 2.6 Tooling Flat, closed-cavity mold with a uniform thickness cavity, for closed-cavity LRM Flat base plate and perhaps a reusable bladder for open-cavity LRM processing Engineering Performance: – Assembly procedure, infusion parameters/pressures, cure temperature and packing pressure, surface finish and flatness requirements should be defined – Thermocouples should be placed at the coldest and hottest locations

17 th Sept 2003 Larry Gintert John Bayldon 2.6 Tooling Cont. A method for accurately positioning the plies is required – Control of ply orientation – Transfer of the tool zero direction to the panel and then to the machining equipment e.g. Scribe lines on the tool Thin metal strips embedded along one edge of the panel Tool preparation procedures – Tool inspection – Verification that all tooling details are available and in good working condition

17 th Sept 2003 Larry Gintert John Bayldon 2.6 Tooling Cont. – Method of cleaning, solvents, cleaning cloths – Mold release agents – Tool heat survey results (location of coldest and hottest thermocouples) – Scribe marking – Templates Inspection intervals Surface conditions Material Quantities

17 th Sept 2003 Larry Gintert John Bayldon 2.6 Tooling Cont. – Heat-up rate – Surface conditions – Method of moving, transportation – Condition (mold release applied, and no mold release) – Configuration (flat, vertical) – Status identified (approved, unapproved) – Storage conditions and locations – Expansion and contraction rate – Material – Repair procedures – Inspection intervals – Location and number of vacuum ports – Orientation rosette

17 th Sept 2003 Larry Gintert John Bayldon Preform Fabrication Frozen reactive materials warmed to room temperature prior to opening Materials should be cut on surfaces specifically dedicated to cutting Individual materials should be identified and marked at the time of cutting Preform tooling – Inspection step with a translucent shaped caul Accurately align the materials with respect to the tool zero-degree reference direction

17 th Sept 2003 Larry Gintert John Bayldon Preform Fabrication Cont. Mold assembly repeatability – Positive location features and methods that ensure that the preform is not distorted or damaged – Inspection features with acceptable limits for measured gaps in the case of closed-cavity molds – Thickness gages and templates in the case of open- cavity molds Thermocouples – Direct measurement of the panel temperature – Thermocouples placed against the preform to ensure the material is heated to the specified temperatures – At least two thermocouples should be used for each panel

17 th Sept 2003 Larry Gintert John Bayldon

17 th Sept 2003 Larry Gintert John Bayldon

17 th Sept 2003 Larry Gintert John Bayldon Resin Mixing One Part Systems – Controlled by supplier, and verified by fabricator, large batches allow for comprehensive testing of final resin Formulated System – Supplier can verify chemistry of components, and mixing quality of separate parts, but fabricator has to carry out final mixing. Verification of mix ratio and mix quality required Other – Fabricator must verify chemistry of components, (before or after mixing,) and then verify mix ratios, and mix quality

17 th Sept 2003 Larry Gintert John Bayldon Resin Options One partFormulatedOther Well Mixed  Mix Ratios  Cure State  Contamination  CompatibilityTest  Indicates Fabricator Controls Required.  Indicates generally good

17 th Sept 2003 Larry Gintert John Bayldon Resin Infusion Control T Tool T Injection Vacuum T Reservoir Flow Rate P Injection

17 th Sept 2003 Larry Gintert John Bayldon Resin Cure T Tool P Packing Vent Condition (Open, Closed, Vacuum, Pressurized) T Part

17 th Sept 2003 Larry Gintert John Bayldon Panel Identification The identification number will provide traceability to: – The requesting document – Resin batch number – Preform identification number – Cure cycle – Test type Lines can also be drawn at an angle across the panel surface to aid in identifying specimen location within the panel.

17 th Sept 2003 Larry Gintert John Bayldon 2.8 Inspection and Process Monitoring. 2.8 Inspection and Process Monitoring Responsibility for Inspection Process Monitoring and Control Panel Inspection Use of Prolongs/Cut outs

17 th Sept 2003 Larry Gintert John Bayldon Process Monitoring and Control Data Collection for Quality Assurance Data Collection for SPC Control Limits Action Limits

17 th Sept 2003 Larry Gintert John Bayldon Panel Inspection Panel thickness Surface flatness Resin content/reinforcement weight fraction Void content Composition variations (e.g due to binder migration or resin filtration,) Completeness of cure Embedded materials

17 th Sept 2003 Larry Gintert John Bayldon Resin Composition Variation Filtration Binder/Tackifier Migration Migration Filtration

17 th Sept 2003 Larry Gintert John Bayldon Use of Prolongs/Cut-outs Traveler Pieces – Quality control – Statistical process control Must be included at the earliest stage of the process design Tests – Degree of cure – Final Tg – Flexural strength. Vent/Gate plugs

17 th Sept 2003 Larry Gintert John Bayldon 3 Producibility Validation Guidelines 3.1 Producibility Qualification Tests – Verification of material behavior for complex shapes and full scale parts 3.2 Fabricator Qualification – Verification of production parts compared to development 3.3 Performance Property Equivalency – Verification of materials properties for full scale parts 3.4 Component Structural Equivalency – Verification of structural behavior