ATLAS Frame PRR 1 W.O. Miller Feb. 2002 US ATLAS Pixel Detector Global Supports PRR W.O. Miller, R. Smith, W.K. Miller, R. Baer HYTEC G. Gilchriese, E.

Slides:



Advertisements
Similar presentations
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Advertisements

HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Vertex Detector Mechanics Bill Cooper Fermilab VXD.
M. Gilchriese Mechanics Labor and Disk Sectors US Pixel Meeting November 2001.
Global Supports Update W.O. Miller October 2001 US ATLAS Pixel Detector Global Supports Status W.O. Miller, R. Smith, W.K. Miller, G. Hayman, R. Baer HYTEC.
M. Gilchriese Disk Rings and Assembly M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
ATLAS Pixel Detector July 2003 ETC ‘04 E. Anderssen LBNL BPSS and Service Panels Santa Cruz, CA E Anderssen LBNL.
Carbon-Epoxy Composite Base Plates for the PHOBOS Spectrometer Arms J.Michalowski, M.Stodulski The H.Niewodniczanski Institute of Nuclear Physics, Krakow.
I T i womiller VG1 Meeting UCSC November 10, 2005 ATLAS Upgrade Workshop Silicon Tracker Stave Mechanical Issues.
Engineering Division 1 Mechanical and Integration CD0 Walkthru, 19-Dec, 2007 Eric Anderssen, LBNL.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
WBS Stave Mechanics, Cooling and Support - LBNL ATLAS Upgrade R&D Meeting UC Santa Cruz May 3, 2007 E. Anderssen, M. Cepeda, S. Dardin, M. Gilchriese,
W.O. Miller i T i VG 1 Example Barrel Structures- Disk Primary FEA of Disk Frame Supports FEA of Disk Frame Supports –Structure 2m long with two end plates.
Tracker Support Tube Tracker EDR November 15th/16th 2000 M.Oriunno CERN/EP Tracker Support Tube Marco Oriunno CERN/EP Division on behalf of Tracker Integration.
FEBRUARY 2003 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Support Tube PRR: Parts Pixel Support Tube Production Readiness Review Parts Overview Alexis.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
ATLAS Pixel Detector March 2004 Video Conference E. Anderssen LBNL PP1 Opto Connector and Fiber Routing Updated with notes from 23-March Meeting E. Anderssen,
ATLAS Pixel Detector Discussion of Tolerances November 12, 1998 Pixel Mechanics D. Bintinger, LBNL E. Anderssen, LBNL/CERN.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
ATLAS LBNL Pixel Support Study 1 W.O. Miller HYTEC ATLAS Pixel Detector Support Structure Status and Future Developments February 19, 1999 W. Miller HYTEC.
ATLAS Pixel Detector June 2002 PST FDR N. Hartman LBNL 1 Pixel Support Tube: Design and Prototyping PST Final Design Review June 2002.
ATLAS Pixel Detector Project N. Hartman LBNL 1 Alexis Smith Intern Progress Report Neal Hartman, March 25, 2003.
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Key Design Issues and Recent Reviews Tom Peterson, Fermilab DFBX PRR, October 23, 2002 US LHC ACCELERATOR PROJECT brookhaven - fermilab - berkeley.
Global Supports CDR 1 W.O. Miller July 2001 US ATLAS Pixel Detector Disk Ring/Frame Status Review W.O. Miller, R. Smith, W.K. Miller, R. Baer HYTEC G.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
M. Gilchriese Overview of Production Plan for Pixel Global Support and Disk Support Rings M. G. D. Gilchriese Lawrence Berkeley National Laboratory February.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
Global Supports CDR 1 W.O. Miller July 2001 US ATLAS Pixel Detector Global Supports CDR W.O. Miller, R. Smith, W.K. Miller, G. Hayman HYTEC G. Gilchriese,
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
M. Gilchriese Disk Sector Production Pixel Local Supports Production Readiness Review.
W.O. Miller i T i VG 1 Two Pixel Configurations Under Study First: A Monolithic Integrated Structure First: A Monolithic Integrated Structure –Axial array.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
December 1999 Frame and Assembly Planning Status E. Anderssen, D. Bintinger, M. Gilchriese and F. Goozen LBNL W. Miller Hytec, Inc.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
M. Gilchriese Work Plan W. Miller iTi M. Cepeda, S. Dardin, M. Gilchriese, C. Haber, R. Post LBNL February 6, 2007.
ATLAS Pixel Detector Pixel Support Tube Interfaces Pixel Support Tube PRR CERN, Geneve E. Anderssen, LBNL.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
ATLAS Pixel Detector December 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort December, 2001 N. Hartman,
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
Composite Joining Techniques: Bolted Joints LBNL Composites Workshop February 29-March 3, 2016.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
M. Gilchriese - February 2001 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Taylor, T. Weber, J.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Straw man layout for ATLAS ID for SLHC
WP9 ITS Mechanics and Cooling
WG4 – Progress report R. Santoro and A. Tauro.
Presentation transcript:

ATLAS Frame PRR 1 W.O. Miller Feb US ATLAS Pixel Detector Global Supports PRR W.O. Miller, R. Smith, W.K. Miller, R. Baer HYTEC G. Gilchriese, E. Anderssen, N. Hartman, F. Goozen LBNL Objectives: Disk Ring Status Production Readiness of Frame Components

ATLAS Frame PRR 2 W.O. Miller Feb US ATLAS Pixel Detector Nomenclature Center Frame Section (1) End Section (2 ) Internal End Cone (2) (B-Layer and Services not shown) Interior Barrel Layers (3) Disks (6 ) Disk Rings (6) Disk sectors (8)

ATLAS Frame PRR 3 W.O. Miller Feb US ATLAS Pixel Detector Disk Support Ring Ring Ring mount 8-sector disk Sector cooling tubes C-Channels 4 arc segments around the perimeter

ATLAS Frame PRR 4 W.O. Miller Feb US ATLAS Pixel Detector Disk Ring Production Production Activities –Mold Qualification: Phase I Precision compression molded C- Channels –Requires confirmation of cavity dimensions –2 outer and 2 inner C-Channels molded with YSH50/RS-3 cyanate ester resin –4 segments for the outer and 4 segments for the inner –1 st Article Ring Qualification: Phase II Presently inspecting graphite bonding fixture via CMM at LBNL Phase II activity will start in February 2002 Production Progressing as Planned Development Ring Tested in Disk Frame Section Confirmed our approach Mounting approach Mounting precision Repeatability of mounts Frame/mount stiffness

ATLAS Frame PRR 5 W.O. Miller Feb US ATLAS Pixel Detector C-Channel Mold (Segment) Silicone rubber forces the composite to conform to the mold profile—reversed the process from before

ATLAS Frame PRR 6 W.O. Miller Feb US ATLAS Pixel Detector C-Channel Mold Trials Typical Inspection Report for First Article Verification of critical dimensions Radii Toe-in In-grain twist Measurements taken as molded and after trimming Edges to be trimmed Inner and outer radii and arc length

ATLAS Frame PRR 7 W.O. Miller Feb US ATLAS Pixel Detector C-Channel Status Surface texture excellent Wall thickness well controlled Preliminary dimensional measurements look quite good- although this investigation is still proceeding –C-Channel not completely trimmed, ½ moon cut-outs for the ring bushings left off –Desired dimensional control in several areas 50 to 130 microns (2 to 5mils) –Dimensions are to be achieved after trimming one edge (radius) of the channel to the proper radius and two ends to form a 90 degree arc. Effect of mold strains –Part cures at elevated temperature in Al mold –Difference between as molded state and mold dimensions is evident –Difference after trimming the radius is more pronounced –More parts must be made to demonstrate consistency Results to date –Insufficient data to suggest a change in mold radius is necessary –Other dimensional features are quite good

ATLAS Frame PRR 8 W.O. Miller Feb US ATLAS Pixel Detector Global Support Frame PRR

ATLAS Frame PRR 9 W.O. Miller Feb US ATLAS Pixel Detector Global Supports-Readiness Tasks Completed Extensive design studies defining structural approach and material choices Prepared finite element model of complete system Static stiffness Dynamic stiffness (vibration) Torsional stiffness (insertion considerations) Prototyped Structures-(500mm diameter frame) Disk Frame Section End Cone Disk Support Ring and Mounts Conducted Individual Component and Integrated Tests Disk Support Ring with development sectors Disk Support Ring in Frame Section End Cone with Frame Section Completed CDR and FDR on all components Completed Production Drawings and Plans

ATLAS Frame PRR 10 W.O. Miller Feb US ATLAS Pixel Detector Topical Characteristics Global Support Structure –2.85kg composite sandwich structure, fully assembled with detectors and services estimated to be 26.8kg K1392U fiber/EX1515 Byrte Technology resin and graphite fiber honeycomb for maximum frame stiffness –Assembled by joining 3- subassemblies with self indexing features 2-Disk Sections 1-Barrel Section Interfaces Resolved End Cone to Barrel Shells (IVW) External mounts to Pixel Support Tube Space for Services: routing and egress End Plate End cone Disk Outer Frame

ATLAS Frame PRR 11 W.O. Miller Feb US ATLAS Pixel Detector Design Confirmation Studies Objectives –Demonstrate ability to predict microstrains to level necessary for qualifying stable structures –Confirm our predictions of static and dynamic stiffness Typical results –Frame sag ~12microns for 26.8kg –Frame natural freq. ~89Hz –Torsional sag- 3pt supports 61  m –Disk ring stiffness-1N load normal to ring 1.66  m/N

ATLAS Frame PRR 12 W.O. Miller Feb US ATLAS Pixel Detector End Cone Prototype Salient construction points –End Cone for 500mm frame design –P30Carbon-carbon facings, ~0.44mm –XN50/cyanate ester graphite fiber honeycomb, 4mm thick –YSH50 quasi- isotropic laminate for outer supports and inner tabs Static component tests Individually, as well as mounted on frame White paint on short tab for holographic measurements

ATLAS Frame PRR 13 W.O. Miller Feb US ATLAS Pixel Detector LBNL test results with end cone in place –Axial load 1.125inch from end of long tab  m/N HYTEC end cone separately –Axial load 1.125inch from end of long tab-- 16  m/N End Cone/Frame Test Note disk sector support ring Barrel section mounting tabs and dial indicator measuring displacement 12 Sector Frame-500mm dia.

ATLAS Frame PRR 14 W.O. Miller Feb US ATLAS Pixel Detector Now that prototype investigations and final drawings have been completed Frame Procurement Steps Remaining tasks Leading to Release of Procurement Orders are: –Review and incorporate comments from PRR –Finish detail drawing review –Release drawings and post in EDMS –Review letters of interest from prospective vendors Resolve any concerns about LBNL supplied tooling Procurement Orders –Release Request For Quote (RFQ) to composite fabricators –Release RFQ(s) for tooling –Select composite fabricator(s) and tooling vendors Assembly and QC Plans –Work with vendor (s) to produce a coordinated fabrication and assembly plan In process inspection at vendors and LBNL Posting of the final plan documents in EDMS –Complete assembly and inspection at LBNL

ATLAS Frame PRR 15 W.O. Miller Feb US ATLAS Pixel Detector Schedule Disk Support Ring and the Global Support Components Delivery Schedule is doable, but tight