LHQ Curing Mold Simulation Analysis Miao Yu Fermilab 08/02/2011.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Coil TQ 36 size measurements F. Nobrega/ R. Bossert
FNAL QXF Curing Mold Miao Yu, FNAL 04/16/2013. FNAL Curing Press Max. load/cylinder (ton/kN) Spacing (inch/c m) Max. load (kN/m) Max. load for LHQ (kN/m)
HQ & LHQ End Parts Miao Yu Fermilab 08/27/12. HQ parts All the spacers are arriving within a week. 2.
Proposal for HQ Coil 27 Miao Yu, Steve Krave. What to do with the coil Laser sintering end parts with accordion slits Plasma coating these end parts Demonstrate.
HQ Structure – Mechanical Model J. Schmalzle 4/8/13.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LQ Winding and Curing Tooling Internal Review F. Nobrega, N. Andreev April 9, 2007.
Long HQ coil drawings now available 1 Miao Yu. Dead voltage taps in TQ/LQ/HQ coils Inner layer: 24, outer layer: 12 (33 inner/23 outer per coil for TQ/LQ/HQ)
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
Vacuum Vessel Production Readiness Review
PH-DT Engineering Office, CERN
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Copyright © 2011 Pearson Education South Asia Pte Ltd
Contact Stress (3.19) MAE 316 – Strength of Mechanical Components
1 times table 2 times table 3 times table 4 times table 5 times table
Superconducting Large Bore Sextupole for ILC
Curing Mold Laminations Miao Yu 05/17/2012. QC on the cross-section 30/30 samples before production 16/500 samples during production 2.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Mechanical Engineering Analysis. Material Selection Process WoodStainless Steel HDPEAluminumPTFE Cost Machinability Strength Durability
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
LHQ Curing Mold Miao Yu Fermilab 07/26/2011. HQ and LQ Curing HQ coil curing (LBNL) 2 LQ coil curing For HQ, the pressure of the mandrel cylinder is set.
Bias Magnet for the Booster’s 2-nd Harmonic Cavity An attempt to evaluate the scope of work based of the existing RF design of the cavity 9/10/2015I. T.
The construction of the model of the curved fast ramped superconducting dipole for FAIR SIS300 synchrotron P.Fabbricatore INFN-Genova The construction.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
NSTXU-CALC TF Flex Joint and TF Bundle Stub
Sag of ZTF components Callahan 9/4/2014. Corrector Trim Plate analysis.
ANSYS Structural Analyses of sPhenix Magnet Coil at Full Current John Cozzolino July 10,
LHQ Coil 02 Winding and Curing Miao Yu 07/11/2013.
Superconducting Magnet Group Future of HQ coils S. Caspi 8/25/2011.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
Cavity support scheme options Thomas Jones 25/06/15 1.
Tables Learning Support
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
LHQ Coil 03 Winding and Curing Miao Yu, Steven Krave 05/23/2014.
1 - An AISI 1020 cold- rolled steel tube has an OD of 3.0 inch. The internal pressure in the tube is 6,840 psi. Determine the thickness of the tube using.
Fabrication of test coil for D1 2m model Michinaka SUGANO KEK WP3 meeting 08/10/2014.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Exercises in Hydraulic Bulge Testing H.S. Kim H. Lim Mike Sumption Ted Collings The Ohio State University Dept of Materials Science and Engineering Center.
© Institute for International Research, Inc All rights reserved. Module 3: Quiz Question Answer.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
Conclusions on Transverse Shearing Stress Calculations Maximum Value at Neutral Axis – IF CROSS- SECTION IS NOT NARROWER ELSEWHERE –Depends on Shape of.
BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse.
TS Cool Down Studies TSu Unit Coils (24-25) N. Dhanaraj and E. Voirin Tuesday, 10 March 2015 Reference: Docdb No:
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
LHQ01 IL Curing Miao Yu 01/31/2013. LHQ IL Packing for Curing 2.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
HQ Mirror Assembly R. Bossert
QXF Cable Winding Test and End Parts Design
Times Tables.
Sand Casting Sand casting, also known as sand-mold casting, consists of pouring molten metal into a sand mold, allowing the metal to solidify, and then.
326MAE (Stress and Dynamic Analysis) 340MAE (Extended Stress and Dynamic Analysis)
Tutorial in Mechanical Properties
3 times tables.
6 times tables.
DSOCS2 – Introduction to optimisation in Solidworks
Copyright ©2014 Pearson Education, All Rights Reserved
Presentation transcript:

LHQ Curing Mold Simulation Analysis Miao Yu Fermilab 08/02/2011

LHQ Lamination Cross-section 2

Loading Sequence 3 Assumption: 1.p mandrel ~1.4 MPa & p coil ~20 MPa just close the mold. 2.Once the mold is close, all the increased pressure from the main cylinder is applied on the mold, p mold The maximum mandrel cylinder pressure is 15 tons (10,000 psi), which provides p mandrel 11 MPa on the mandrel block. The maximum main cylinder pressure is 200 tons (10,000 psi), which provides p coil 20 MPa on the coil and p mold 84 MPa on the mold. Steel 1050 annealed: σ y = 365 MPa F s = 3, σ allowable = σ y / F s = 121 MPa p mandrel p coil p mold

LHQ: Maximum Pressure on the Mold 4 p mandrel : 1.4 MPa, p coil : 20 MPa, p mold : 84 MPa σ max = 290 MPa d max = 99.3 µm

LHQ: Allowable Pressure on the Mold 5 p mandrel : 1.4 MPa, p coil : 20 MPa, p mold : 35 MPa σ max = 118 MPa d max = 44.1 µm Main cylinder: = 4761 psi

LQ: Maximum Pressure on the Mold 6 p mandrel : 1.4 MPa, p coil : 24.5 MPa, p mold : 86.4 MPa σ max = 250 MPa d max = 99.0 µm

LQ: Allowable Pressure on the Mold 7 p mandrel : 1.4 MPa, p coil : 24.5 MPa, p mold : 40 MPa σ max = 119 MPa d max = 48.0 µm Main cylinder: = 5032 psi

HQ: Maximum Pressure on the Mold 8 p mandrel : 0.4 MPa, p coil : 19.5 MPa, p mold : 282 MPa σ max = 296 MPa d max = 112 µm

HQ: Allowable Pressure on the Mold 9 p mandrel : 0.4 MPa, p coil : 19.5 MPa, p mold : 115 MPa σ max = 119 MPa d max = 48.5 µm Main cylinder: = 5552 psi

Main Cylinder Allowable Operation Pressure Pressure on Coil (MPa) Pressure on Mold (MPa) Main Cylinder Pressure (psi) LQ HQ LHQ To operate the curing press safely for LQ and HQ, the main cylinder pressure is suggested below the number in the above table. For LHQ, after the pressure on coil is known to close the cavity, the allowable main cylinder pressure can be re-calculated.