Waking the sleeping giant 1 Johan A Johansen, VP Operations, Statoil Aberdeen.

Slides:



Advertisements
Similar presentations
Mariner – a project in the making 20 December
Advertisements

PP/57/01 ACTIVITY PLANNING: THE ISSUE The need for more transparent activity planning, particularly in the area of mobile and platform rigs and well services.
Third Quarter Earnings Announcement November 16th 2005 A focused E&P company - with game changing technology.
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
GPC Management Presentation Oil & Gas Investment Symposium February 7-8, 2005 NYSE: GDP.
GLOBAL WEATHER BY DESIGN FOR FPSOs By: Jill F. Hasling, CCM President Weather Research Center.
Valhall development timeline. Licence award Licence award: The Valhall block 2/8 was among the more attractive in the first offshore licensing round announced.
Technology Programme Competitions Oil and Gas Technologies.
Mike Turner - Senior Vice President, Global Production License to Operate: Socio-economic Impacts and the Public-Industry Partnership.
Regulations in the North Sea Keith Mayo, Head of Offshore Decommissioning, DECC, UK Date 1/2 October 2009.
INSURING PROJECT CARGO What is it about? Infrastructure Projects Worldwide Oversized Cargoes High Insured Values Complex Logistics Requirements Projects.
UK’s First Commercial Scale Offshore Wind Farm 26th March 2003 NWP Offshore Ltd.
Our Profile Corporate Milestone MSE start to established First Dry-docking repair for bulk.
PART SIX Systems Model and Offshore Oil Offshore Oil: Decision to Recover The determination must be made whether cost of inputs and processing will be.
Unit 4: Primary Resources Energy from the Oceans.
OCEN 201 Introduction to Ocean & Coastal Engineering Offshore Structures Jun Zhang
Carol Bailey Head of Oil & Gas Section, Levantine Training Centre Oil & Gas Training EuroMed E&P Offshore Services, Certification, Classification & Standards.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
National Iranian Oil Company
1) The history of Technip 2) Range of services
Heidi Virta Finpro Mexico January 2011 Marine sector in Mexico.
MFP – Installation using a Jack up Rig
OilSim Exploration OLF OILSIM Overview Purpose: Enhance your overall understanding of petroleum exploration Multidisciplinary challenge You are.
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
CIBC World Markets Annual Global Energy Conference March 19-21, 2002.
Offshore Natural Resource Extraction. Overview History History Exploration Exploration  Seismic surveys  Drill ships Platform models Platform models.
Renewables Go Big Big Wind Christian Kjaer Chief Executive Officer European Wind Energy Association European Parliament, 2 September 2009.
DOC ID © Chevron 2007 Chemical EOR Implementation for the Captain Field, UK 30 th IEA EOR Symposium and Workshop September 2009 Anette Poulsen, Chevron.
LIBYA OIL & GAS MARKET OVERVIEW
Subsea Light Well Intervention
EUROGAS CORPORATION Annual & Special Meeting June 14, 2011.
UK Offshore Wind April April UK Offshore Wind 2002 James May Director-General UKOOA.
Jens Petur Bærentsen Simprentis Marcos Monteferrante OILSIM EXPLORATION Svalex 2007 Longyearbyen, Svalbard, Norway August 2007.
OilSim Faroes 2007 Facilitator Course Tórshavn, 2. Oktober, 2007.
Systems Model and Offshore Oil Offshore Oil: Decision to Recover The determination must be made whether cost of inputs and processing will be offset.
WITSML status and road ahead in StatoilHydro Energistics meeting june Lars Olav Grøvik.
ATP Oil & Gas Corporation IPAA 2002 Oil & Gas Investment Symposium April 22-24, 2002 ATP Oil & Gas Corporation.
The Beginning of an Industry. BP Thunderhorse SIDUS is an specialty manufacturer and systems integrator offering Hazardous Area and Subsea Surveillance.
Luca Vignati Aktau, 25 September 2012 KARACHAGANAK ACTIVITY REVIEW AND LONG TERM DEVELOPMENT PLANS WORLD CLASS EXPERTISE – WORLD CLASS ASSET.
International Conference Oil and Gas of Turkmenistan 2003 Future of International Cooperation Involving Modern Technologies Ashgabat, September 25-26,
Wood Group – an overview A global market leader in: - services for the oil & gas and power generation markets - deepwater engineering - enhancement.
SPE GCS General Meeting Luncheon March 14, Forward-looking statement This presentation contains projections and other forward looking statements.
BARD Engineering OFFSHORE WIND INSTALLATION SOLUTIONS - INSPIRED BY OFFSHORE OIL AND GAS European Offshore Wind conference Berlin, December 2007.
Managing Successful Offshore Modularized Fabrication — Through Cost Effective Procurement Strategy Gu Hong, COOEC April, 2011.
Oil and Gas Training Lusaka April 2016.
Offshore Research AS 1 Offshore Markets Offshore Research AS 2 Business concept Data from several reliable sources are processed, interpreted.
Heavy Lift Offshore Conference- RINA 2008 –Float Over Method FLOATOVER.
Occidental Oman Oman Economic forum
What’s the future of decommissioning globally?
Offshore opportunities Marine Money Istanbul 2012 Kristoffer Lund Sandaker Pareto Project Finance Pareto Project Finance, May 2012.
Chapter 6.  Moveable rigs include drilling barges, drill ships, jack-up rigs, and semisubmersible rigs.  Offshore rigs use a device called a top drive,
© 2016 Global Market Insights. All Rights Reserved Mooring System Market Growth Trend & Forecast by Mooring System Market.
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Global Offshore Wind Market to reach 60 GW by 2024: Global Market Insights.
European Energy Southern Gas Corridor to Europe
Successful Efforts Method (SEM) and Full Cost Method (FCM) of Accounting for Oil and Gas Producing Activities.
Arena Company History Since inception in 1999, the business plan has been to: Generate lower risk exploitation drilling opportunities Focus on the GOM.
Eidesvik Offshore ASA – General Meeting
The Opportunity of the Permian
INSTRUCTOR © 2017, John R. Fanchi
© 2017 Global Market Insights, Inc. USA. All Rights Reserved Crane Market Growth, Application Analysis from 2017 to 2024.
Wheatstone LNG Project Ahmed Khalaf KUFPEC
Module 43 Oil Pollution After reading this module you should be able to Identify the major sources of oil pollution. Explain some of the current methods.
دانشگاه شهیدرجایی تهران
Cramped on Land, Big Oil Bets at Sea By: Ben Casselman and Guy Chazan
تعهدات مشتری در کنوانسیون بیع بین المللی
Reduced Draft Spar (RDS) Floating Offshore Wind Turbines A Market Opportunity Pedro López Offshore Engineering & Ship Design
Thank you for joining. Introductions and 60 second bios of those in the room.
Jure Leben, State Secretary
© 2019 Global Market Insights, Inc. USA. All Rights Reserved Structural Steel Market Growth Outlook with Industry Review and Forecast.
Presentation transcript:

Waking the sleeping giant 1 Johan A Johansen, VP Operations, Statoil Aberdeen

Statoil in Aberdeen 2007: Acquisition of Mariner and Bressay 2012: Mariner investment decision 2013: UKCS operations moved to Aberdeen 2016: Moving into new office in Kingswells Heavy recruitment for UKCS operations −May 2014: >100 employees −2016: 700 on- and offshore, contractors included 2

1977: 2D seismic acquired across 9/12 (P254) 1980: P335 licence awarded to Union Oil (Mariner) 1981: Mariner discovered 9/11- 1 well 1982: 2D seismic acquired across 9/11 (P335) 1982: wells 2, 3 & 4 drilled 1991: P726 licence awarded to ConocoPhillips (Mariner East) 1994: Hess becomes operator of P : 3D seismic acquired 1996: Texaco becomes operator of P335 & P : wells 5 to 12 drilled, including EWT 2005: Chevron becomes operator of P : 3D seismic reprocessed 2008: Statoil becomes operator of P335 & P : HR 3D and core area OBS acquired 2012: Broadband 3D acquired 2017: FIRST OIL «A long and winding road»

Gross investment >USD 7 billion (~ £4.5 billion) 2 billion boe in place, > 250 million boe reserves Plateau production of around 55,000 boe/d Production for 30 years Platform on steel jacket, floating storage unit. Mariner: A major new UKCS development 4

More than 130 well targets Additional jack-up rig for the first 4-5 years Multi lateral wells POB = 295

Project on track 2013: Start of jacket construction 2014: Start of topsides construction 2015: Jacket installation 2016: Hook-up and commissioning 2017: First oil

Thank you for the attention