Kenmore -Town of Tonawanda Union Free School District PHASE 2 CAPITAL PROJECT DEVELOPMENT PRESENTATION We educate, prepare, and inspire all students to.

Slides:



Advertisements
Similar presentations
Blissfield Community Schools Strategic Plan Facilities Team.
Advertisements

NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
BOND 2013 Election Day November 5th. SMART School BOND 2013 November 5 th Ballot Proposal Bond proposal for facility & site improvements to address student.
400 Montgomery Street, Suite 805 San Francisco, California February 5, 2007 West Hills Community College District School Facilities Improvement.
WJJ Middle School Facility Study Tri Board Meeting February 5, 2015.
Superintendent’s Recommendations for District Improvement Related to Facility Needs VICTORIA PUBLIC SCHOOLS.
© Baltimore County Public Schools Schematic Design Presentation Catonsville Elementary School at Bloomsbury 1104 Kenilworth Dr. Suite 500 Towson,
Bay Elementary School Historical School Site (1938)
Capital Budgeting.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
2012 Planned Facilities Reconstruction Project. Planned Facilities Reconstruction Health & Life Safety Energy Conservation & Management Security Upgrades.
Building Work Committee Renovation & Expansion Project Presentation March 7, 2009 Mason School District.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
BOND REFERENDUM PRESENTATION EASTCHESTER SCHOOL DISTRICT Dr. Walter Moran Superintendent of Schools.
Jan 31, 2005 Community Update. Jan 31, 2005 Thanks to the voters… Measure R passed with over 63% of the vote $3.87 billion for “the Safe and Healthy Neighborhood.
FACILITIES ADVISORY COMMITTEE Facilities Advisory Committee Annual Report.
2% Cap on Tax Levy (BOE Approval required) The BOE is being asked to approve the Tax Levy Ref PAGE 14 Suspension of Activity Fee Anticipated State Reimbursement.
Klein High School Original building built in 1963 Move KHS to HS #5 in 2011 Move back to renovated KHS in 2013.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Eden Central School District Board of Education Meeting Eden CSD 2020 Project Update September 16, 2015.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
Successful Bond Programs (Community Engagement) Cathy Allen, Chief Operations Officer Facilities Support Services September 22,
Hilton Central School District Capital Project Planning Team Kickoff Meeting December 14, 2011.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, All Alternates April 19, 2007 Prepared by:
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Smart Schools Bond Act LAURENS CENTRAL SCHOOL. What is the Smart Schools Bond Act?  The Smart Schools Bond Act (SSBA) authorized the issuance of $2 billion.
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
Presented by Ryan Garrison, Director of Technology Smart Schools Bond Act HUNT Engineers, Architects, Land Surveyors, P.C. Investment Plan Preliminary.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 18,
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
Proposed 2013 Bond A Smart Plan For Continued Excellence In The Dearborn Public Schools Proposed 2013 Bond A Smart Plan For Continued Excellence In The.
Vision for the Future Spring 2016 Campus Open Forum APRIL 7, 2016 STUDENT CENTER CONFERENCE ROOM.
Building Project Community Meeting Fieldcrest High School February 18, :30 pm.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
Welcome to the Stafford Elementary Town Hall Meeting! January 12, :30-7:30 pm Mary W. Foreman, Stafford Elementary Principal Alexis White, Stafford.
December 6, 2007 Stockton Unified School District San Joaquin County District and Facilities Needs Overview 701 N. Madison Street Stockton, CA (209)
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
ESPLOST Savannah-Chatham County Public Schools October 31, 2006.
Development of a Comprehensive Modernization Project at Burroughs Middle School Community Meeting January 20, 2016.
Budget West Long Branch School District
Proposed School Bond Referendum September 26, 2017
Capital Improvement & School Construction Bond
Five Year Capital Projects Plan Through
Bond 2017 Capital Projects Linda Degman | January 19, 2017.
Tomahawk School District Community Survey Results
Cornwall Central School District
Joint Schools Construction Board Phase II
Galt Joint Union High School District
VCSD Capital Project Forum
Dr. Joseph Meloche Superintendent of Schools Mrs
21st Century School Buildings Plan
SOCCCD Basic Aid Allocation Recommendation FY
UNION GROVE ELEMENTARY REFERENDUM
2007 Bond Issue Capital Improvement Program
Update to Board of Trustees: November 9 FAC Meeting
Troy School District Bond Program – Series 1 Construction Update
Garden City Public Schools Capital Reserve
PROPOSED FACILITIES REFERENDUM
Transportation vehicles
Capital Project Update
Hinsdale CSD Revised Capital Project ,
Troy School District Bond Program – Series 1 Construction Update
Moving from Consumers to Producers Kings Park Central School District
Presentation transcript:

Kenmore -Town of Tonawanda Union Free School District PHASE 2 CAPITAL PROJECT DEVELOPMENT PRESENTATION We educate, prepare, and inspire all students to achieve their highest potential

The “OACM Team” Mr. Bob DanaBOE President KTUFSD Mr. Steve Brooks BOE Vice President KTUFSD Mr. Mark MondanaroDistrict Superintendent KTUFSD Mr. Gerry StuitjeAsst. Superintendent for Finance KTUFSD Mr. Jeffrey HattenDirector of Facilities KTUFSD Mr. Nick DiFranciscoSenior Building & Grounds Advisor KTUFSD Mr. Martin WendeDirector of Information Technology KTUFSD Mr. Brett BankerSupervisor of Health Services, PE, Recreation & Athletics Mr. Scott JonesOwner, Gordon W. Jones Associates, Architects Mr. Steve DiMatteoProject Architect, Gordon W. Jones Associates, Architects Mr. Ray WaiteProject Engineer, M & E Engineering, PC Mr. Tom CarusoVice President, Campus Construction Management Group Inc. Mr. Mark VoorheesProject Executive, Campus Construction Management Group Inc. Ms. Carrie PrestonProject Manager, Campus Construction Management Group Inc.

OACM Team Mission: To identify needs of the District relating to physical plant, building envelopes, academic, site work, and information technology. Study and prioritize those needs in an order that is best for the District. Develop and recommend a fiscally responsible project resulting in a ZERO Tax impact to the District residents. Complete our mission in a timely manner to allow the District to further develop a Capital Improvements Project.

REFERENDUMREFERENDUM SED BID CONSTRUCTION DESIGN REFERENDUM PLANNING Where we are

Scope Identification Process Data used to identify District Needs………… Items not included in Phase 1 Input from Team Meetings GWJ 2014 Building Conditions Survey Guidance from Facilities Department Input from various Department Heads Input from District Administration Team Consolidation Scenario “I”

The Study The team studied close to 1000 needs identified through the scoping process. We organized the scope into several categories. We estimated the cost to implement each of the identified items. We prioritized the scope in descending order based on the Team’s input. The goal is to recommend to the Board of Education items they should consider as part of their next Capital Improvements Project.

Study Results: The study shows the District has needs in excess of $170,000,000. The preliminary financial study shows the District could address approximately $30 million dollars worth of needs in a Capital Project without a tax increase to the District Residents. The study shows significant Information Technology needs across the District that may be impacted by the Smart Schools Bond Act. The study identified several needs not eligible for New York State building aid. We continue to study, for the Board’s consideration, a separate voter proposition that may have a tax impact.

Priority of Scope: Health and Safety, ADA, and Code Compliance Building Envelope Academic Program Information Technology Consolidation Scenario “I”

Potential Scope Items Kenmore West Locker Replacement New Bus Loop / Drop off First Floor Guidance / Attendance Area Roofing Computer Lab Upgrades Second Floor Existing Guidance to 3 new classrooms

New Bus Loop / Parent Drop off on Highland

Potential Scope Items Kenmore East New Parking Lot on Fries Road ADA Upgrades Gym / Locker Room Addition Misc. Classroom Renovations Computer Lab Upgrades New Toilet Rooms 2 nd & 3 rd Floor

New Parking Area on Fries Road

Potential Scope Items Franklin / Hoover Complexes Masonry Restoration Envelope Reconstruction ADA Upgrades Computer Lab Upgrades Lindbergh / Edison Roof Replacements Generator Work Envelope Reconstruction Life Safety System Upgrades HVAC Upgrades Computer Lab Upgrades Sewer System Upgrade (Edison) Door Replacements

Kenmore -Town of Tonawanda Union Free School District THANK YOU We educate, prepare, and inspire all students to achieve their highest potential