Camp Layman Hazardous Fuel Reduction Pre Treatment versus Post treatment Photos Plumas County.

Slides:



Advertisements
Similar presentations
Managing Northern Spotted Owl Habitat in Dry Forest Ecosystems Presented By Cindy Donegan U. S. Fish and Wildlife Service.
Advertisements

ES_61_1, Spain, Andalucía Monte Porrejón, 1987 WP 9.1 Examples of prescribed burning and its effects.
ES_31_2, Spain, Galicia Dozón 2006 WP 9.1 Examples of prescribed burning and its effects.
We Fall Down.
Using FFE-FVS to estimate potential fire behavior in early settlement Black Hills ponderosa pine Mike Battaglia, Colorado State University Skip Smith,
Fuels Reduction and Wildlife Habitat Restoration in a Late Successional Reserve Klamath National Forest, Goosenest Ranger District.
A brief overview of the Selway Falls Cabin Prescribed Fire This powerpoint is provided to give context to the expected fire behavior and outcomes to the.
Fuel Management Objectives within Dry Forest Landscapes on the Okanogan-Wenatchee NF Dr. Richy J. Harrod Okanogan-Wenatchee National Forest.
Hurricane Rita Timber Damage Assessment. Initial Map of Potential Damage (SRS)
Using FIA Data to Strategically Assess Fire Hazard and Management Opportunities in Montana and New Mexico Charles E. Keegan III The University of Montana.
Storm Analysis and Design Prepared for Riverton City 4/13/14 CGM Consultants.
Delleker North Hazardous Fuel Reduction Fuels & Fire Behavior Assessment Project Funded by the Plumas NF with USDA Forest Service’s “Community Protection”
FIVE CREEKS RANGELAND RESTORATION PROJECT FALL 2008 Burns District, BLM.
The Big Picture – Fire and Forest Health. Over stocked mature stands.
Holt CA Course Estimating with Fractions x = = = Warm Up Solve. x = 24.6 x = x = x t 4.1 x 15.1.
Bringing stand level fire risk to the landscape level: Fire risk assessment using FFE-FVS with the Landscape Management System. Kevin Ceder And James McCarter.
This information should not be taken as an offer or solicitation to sell securities. The information is from sources that are believed to be reliable and.
El Dorado County Western Slope Wildfire Protection Plan A collaborative effort funded by an SRA Grant from CAL FIRE And Title III Funds.
Activity Update Johnson County Weed & Pest.  Whitetop  Coupons  Rock Creek Grant  Muddy Creek Grant  FS & BLM  S. thistle, Knapweed  Prairie dogs.
SCENERIO Hour fire weather forecast for: Monday, April 20 th, 2009 Dry weather will continue to hold over the area today Fire activity will remain.
LULA GREEN ROAD UNION, SOUTH CAROLINA Jerry A. Brannon, Sr.,PE Union County Engineer.
Kim Kelly – NWRO GIS Specialist Gene Lonning – NWRO Fuels Specialist March 2009 Northwest Regional Office Risk Assessment.
Assessing the Effectiveness of Landscape Fuel Treatments on Fire Growth and Behavior Rick D. Stratton Presented by Jacob J. LaCroix.
Objective Calculate the amount of materials needed for a construction project.
TYPE OF ENERGY AUDIT Energy Audit can be classified into the following two types. i) Preliminary Audit ii) Detailed Audit The type of Energy Audit to.
The Wildfire Risk Reduction Grant Program Effectiveness Assessment and Program Overview Brett Wolk, Chad Hoffman, Claire Griebenow, and Tony Cheng January.
Community Development Department Variance Length of Dock Roof 2 Cardinal Court.
4.2 Solving Inequalities Using Addition and Subtraction.
Mechanical fuels reduction treatments effects on fire behavior, fuel loads, and forest ecology Osceola National Forest Sept. 28 th, 2011 Sponsors: Conserved.
Measuring Length Created by Craig Mason. Measuring Length ½ of an Inch To the Inch ¼ of an Inch Conversions PowerPoint Created by Craig Mason.
Lesson 4.1 Read through and highlight all vocabulary.
Front Range Roundtable Quarterly Meeting Jill Alexander Wildfire Mitigation Specialist Douglas County Building Division.
Shalev V, et al. Arch Intern Med 2009; 169:
FINDING the VOLUME of a CYLINDER PRE383 V = Ah A = Area of the base h = height of the solid A circle =  r 2 Volume =  r 2 h 2 6 Find the area of the.
THE ROLE OF SUBGROUPS IN CLINICAL TRIALS Ralph B. D’Agostino, Sr., PhD Boston University September 13, 2005.
Storm Sewer Map Development Presented by: Kurt Whited.
Economics of Biomass Harvest Dean Current and Dalia Abbas Woody Biomass Harvesting Workshop and Equipment Demonstration Grand Marais, MN – August 7, 2006.
S-244 Field Observer & Fire Effects Monitor Fire Effects Monitoring Lesson 2: Methods for Measuring Fire Effects Photo: Marshel Moy.
REPORTS & SUMMARIES S-244 Field Observer & Fire Effects Monitor.
NAIROBI CITY COUNTY INITIATIVES AND OPPORTUNITIES FOR INVESTIMENT FOR WASTE TO ENERGY PROJECTS By Leah Oyake-Ombis (PhD) KENYA-SPAIN MULTILATERAL PARTNERSHIP,
Moderator. To improve the utilization.
Hazard Communications Hazardous Substances Skin Eyes Splashing, Fogging, Dusts, From our hands.
Plot Diagram.
Climate Change in the Mountains
22. Use this table to answer the question.
1st form Title Dentist Picture Content Content & Pictures
Taylor Woods Plots 4/14/04.
El Dorado County Western Slope Community Wildfire Protection Plan
Temporal and spatial variability in stand structure and individual-tree growth for 10 years following commercial thinning in spruce-fir forests of northern.
Program Evaluation Models
1. Find the distance between HINT FOR MULTIPLE CHOICE!
Consensus Forecast and Water Resource Comparison
Improvement in Project Delivery
تهیه و تنظیم :حسین عروجی
Hinkson Creek Watershed Restoration Project Phase 2
Film Production Process
Field Photos
Questions: Sesame Street Study
British Society of Restorative Dentistry
We Fall Down.
Estimating Length and Area
Supplemental Figure 1A Pt Pt Pre-treatment
Forest plot displaying the effect estimates comparing azithromycin and placebo treatment in subgroups defined by above (>0.39 ng·mL−1) or below (
Iowa’s River Restoration Toolbox Level 1 / Base Training
We Fall Down.
Rio Bravo Conservation and
Title Dentist Picture Content Content Content Content Content
Yu-Chen Huang, MD, Ying-Chih Cheng, MD 
Consensus Forecast and Water Resource Comparison
Poster Session: 260, 3:05 PM  on Monday, 7/29/2019, 
Presentation transcript:

Camp Layman Hazardous Fuel Reduction Pre Treatment versus Post treatment Photos Plumas County

Camp Layman Hazardous Fuel Reduction Plot 1 Plumas County Pre Treatment Post Treatment Estimated Flame Length = 6 Feet Estimated Crowning Potential = High Estimated Flame Length = 3-4 Feet Estimated Crowning Potential = Low -Moderate

Camp Layman Hazardous Fuel Reduction Plot 5.1 Plumas County Pre Treatment Post Treatment Estimated Flame Length = 3-4 Feet Estimated Crowning Potential = Mod-High Estimated Flame Length = 1-3 Feet Estimated Crowning Potential = Low

Camp Layman Hazardous Fuel Reduction Plot 5.2 Plumas County Pre Treatment Post Treatment Estimated Flame Length = 4-8 Feet Estimated Crowning Potential = Mod-High Estimated Flame Length = 2-3 Feet Estimated Crowning Potential = Low

Camp Layman Hazardous Fuel Reduction Plot 6.1 Plumas County Pre Treatment Post Treatment Estimated Flame Length = 3-4 Feet Estimated Crowning Potential = Moderate Estimated Flame Length = 2-3 Feet Estimated Crowning Potential = Low

Camp Layman Hazardous Fuel Reduction Plot 6.4 Plumas County Pre Treatment Post Treatment Estimated Flame Length = 3-4 Feet Estimated Crowning Potential = Moderate Estimated Flame Length = 2-3 Feet Estimated Crowning Potential = Low

Camp Layman Hazardous Fuel Reduction Plot 7.1 Plumas County Pre Treatment Post Treatment Estimated Flame Length = 3-7 Feet Estimated Crowning Potential = High Estimated Flame Length 2-3 Feet Estimated Crowning Potential = Low

Camp Layman Hazardous Fuel Reduction Plot 7.2 Plumas County Pre Treatment Post Treatment Estimated Flame Length = 3-7 Feet Estimated Crowning Potential = High Estimated Flame Length 2-3 Feet Estimated Crowning Potential = Low