INDUSTRIAL TRAINING INSTITUTE

Slides:



Advertisements
Similar presentations
Industrial Training Institute Sagbara
Advertisements

Welcome to. About Us Website : The Sawant Group of Industries is.
INTERNAL AUDIT Mechanism in SSA-MADHYA PRADESH. Staff sanctioned for Financial Management S.No.Name of Post Post sanctioned Post FilledPost Vacant State.
Summary of skill gaps in light Engineering industry IndustryKey Skill Gaps Light Engineering  Lack of basic understanding and application of drawing skills.
Striving to exceed customer demands by delivering the best.
“Youth Employment Generation Programme in Arab Transition Countries – Jordan component” Inception Workshop 2 July 2012.
JAIN INSTITUTE FOR TRAINING OF TRAINERS
Development of local content following the results of 2013.
PLANT DESIGN (I) Prof. Dr. Hasan farag.
INDUSTRIAL TRAINING INSTITUTE, DINDORI
Govt. of Maharashtra Department of Vocational Education & Training INDUSTRIAL TRAINING INSTITUTE KALWAN, DIST. NASHIK Establish in the year :
ITI SINDEWAHI Dist. Chandrapur
INDUSTRIAL TRAINING INSTITUTE (GIRLS) IMC SOCIETY, BARSHI ROAD, LATUR District -LATUR, MAHARASHTRA STATE Tel. No Fax No
INDUSTRIAL TRAINING INSTITUTE, HATHBANDH
Government of Maharashtra Department Of Vocational Education and Training, INDUSTRIAL TRAINING INSTITUTE, PIMPRI CHINCHWAD, PUNE-19 Phone No
1 Environmental Control BACKGROUND This is a stream in the Higher Diploma in Mechanical Engineering; This stream covers the works in environmental monitoring.
Govt. Engineering College Kozhikode TEQIP –II VII th Review meeting th April 2015.
1 UNIVERSITY COLLEGE OF ENGINEERING OSMANIA UNIVERSITY Established in the year 1929 Courses Offerd - –Day time UG/PG/Ph.D. and Part-time UG/PG Courses.
ITI, KALYANI GOVT. OF WEST BENGAL ITI KALYANI GOVT. OF West Bengal
[ADVANCE ATTENDENT OPERATOR CHEMICAL PLANT ]
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Centre of excellence for chemical sector Industrial Training Institute, Jamnagar ISO 9001 : 2000 Certified.
TEQIP Phase II Seventh Review Meeting Rajiv Gandhi Institute of Technology Kottayam Presented By Dr. K. P. Indiradevi Principal.
PRESENTATION PRESENTATION CENTERS OF EXCELLENCE.
INDUSTRIAL TRAINING INSTITUTE,
COMPANY PROFILE H K Machine Tools, Gali No 14, Near Ganesh Shop Factory, Bhikam Colony Ballabgarh.
GADCHIROLI CITY : Historical reference GADCHIROLI' District was carved out on the 26 th of August 1982 by the Division of erstwhile Chandrapur District.
Chapter 1 What is Engineering ? PREP004 – Introduction to Applied Engineering College of Engineering - University of Hail Fall 2009.
Implementation of FM Action Plan and Monthly Expenditure Plan Group-I M.P,Jharkand,U.P.,Gujarat, Chattisgarh,Nagaland,Chandigarh, Daman&Diu Shri Ved Praksh.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
School Budget Materials & Forms
GOVERNMENT OF ANDHRA PRADESH
Welcome to Anta, the city of Electric and HEARTIEST WELCOME to IMC OF ITI ANTA ITI ANTA.
1 Govt. of Maharashtra Department of Vocational Education & Training, M.S. Industrial Training Institute, WALWA ( ISLMAPUR) Established in the Year : 1997.
Vocational Training Improvement Project 1 st Implementation Support Mission January, 2008 Nalin Jena World Bank.
Government Engineering College Painavu, Idukki. IDP status of Achievement Sl. No DeliverablesTargetCurrent Status 1Number of students registered for (a)
1 COIMBATORE INDUSTRIAL INFRASTRUCTURE ASSOCIATION (COINDIA) Pump, Motor and Foundry Cluster – Coimbatore – Tamil Nadu PROJECT IMPLEMENTATION REPORT (PIR)
Industrial Training Institute Surendranagar Centre Of Excellence Production And Manufacturing Sector Industrial Training Institute Surendranagar Centre.
POST LEAVING CERT ARCHBISHOP MCHALE COLLEGE ENGINEERING DEPARTMENT 1.
頁:頁: National Kaohsiung First University of Science and Technology, Taiwan, R.O.C. 1 Introduction to Fall 2005 「 Industry Research Master Degree Program.
COE (CENTER OF EXCELLENCE) CHEMICAL GROUP I.T.I., DASHRATH VADODARA.
1 Presentation by: S.S. Guleria Special Secretary and Director (T.E.) Himachal Pradesh.
Highlights of the institute
1 COIMBATORE INDUSTRIAL INFRASTRUCTURE ASSOCIATION (COINDIA) Pump, Motor and Foundry Cluster – Coimbatore – Tamil Nadu PROJECT IMPLEMENTATION REPORT (PIR)
GOVT. ENGINEERING COLLEGE BARTON HILL THIRUVANANTHAPURAM – th Review Meeting : TEQIP -II April 2015.
WEL COME.
Brief on the UCG Project The project for the generation of 100 Mega Watt of electricity through the process of Underground Coal Gasification at Block.
ITI Ankleshwar Station Road, Opp. Bus Station, Ankleshwar Website:- Phone & Fax :
1 COIMBATORE INDUSTRIAL INFRASTRUCTURE ASSOCIATION (COINDIA) Pump, Motor and Foundry Cluster – Coimbatore – Tamil Nadu PROJECT IMPLEMENTATION REPORT (PIR)
A OUTSTANDING EFFORT BY PHOTON INSTRUMENTS STUDENT / FRESHERS SKILL DEVELOPMENT PROGRAMME A JOB CENTRIC INDUSTRIAL TRAINING WITH “APPOINTMENT LETTER”
Key Performance Indicators & Management Information System for the Vocational Training Improvement Project IMC Meeting I.T.I. Vangaon, S.M.Ambalkar, Principal.
Walk-in Interview Saturday 7 April, 2012, A.M P.M.
Expectations Be sitting quietly in your assigned seat when the tardy bell rings. This semester you will need a folder to keep up with work for this.
Program Management 4. INDIAN AND NATIVE AMERICAN (INA) EMPLOYMENT AND TRAINING PROGRAM UNDER SECTION 166 OF THE WORKFORCE INVESTMENT ACT (WIA) An Orientation.
FRONT VIEW OF PETROLEUM HOUSE 1. PLOT SIZE.175 ft x 200ft (35000 Sft) ( Sq yard) (7.778 Kannals) 2. DATE OF START STIPULATED.
Developing a Scalable Sustainability Plan Dr. Gary Graham – Director: FL TRADE Consortium
Mechanical Engineers immigrate to Australia and Canada The Mechanical engineers have a high demand in countries like Australia and Canada. The qualified.
Chemical Engineering Drawing
Ministry of HRD, Govt. of India
UNIDO-GEF Industrial Energy Efficiency Project in Macedonia
Presentation of PPP Industrial Training Institute, Dharampur
2nd Joint Review Mission on Skill Building through VTIP
INDUSTRIAL TRAINING INSTITUTE Under Public Private Partnership
Engineering Course Developments for Academic Year 2017/2018
Welcome to CNY Works! Office Hours: Monday-Friday 8:00am – 5:00pm
New Construction Management Program at ITI Technical College Presentation by Sally Stuart Morgan August 22, 2017 to Be as sincere in your delivery as.
GRANT – RECAPITALIZATION OF LIBRARY SERVICES SEPTEMBER 2009
Energy Systems and Infrastructure Division
DSC ChMC CSS Consequential Update 13th March 2019
WELCOME TO INDUSTRIAL TRAINING INSTITUTE, GORWA (MAHILA), VADODARA
Presentation transcript:

INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details

UPGRADATION DETAILS (wherever only upgradation is taken up) Sr. No. YEAR Sanctioned Seats Filled Seats Admission rate % 1 Aug-06 62  81 130% 2 Aug-07  64 84 131% 3 Aug-08  80 105% 4 Aug-09 68  90 132%   TOTAL 274 339 124% Admission Rate % = Filled Seats/Sanctioned Seats * 100

Admission Rate % = Filled Seats/Sanctioned Seats * 100 BBBT DETAILS Sr. No. YEAR Sanctioned Seats Filled Seats Admission rate % 1 Aug-06 96  114 119% 2 Aug-07  96 120 125% 3 Aug-08 144 150%  4 Aug-09 132 137%   TOTAL 384  510 139% Admission Rate % = Filled Seats/Sanctioned Seats * 100

ADVANCE MODULE DETAILS Sr. No. YEAR Sanctioned Seats Filled Seats Admission rate % August February 1 Aug-07 / Feb-08 96 65 20 67% 21% 2 Aug-08 / Feb-09 73 15 76% 15% 3 Aug-09 / Feb-10 94 31 98% 32%   TOTAL 288 232 66 81% 23%  Admission Rate % = Filled Seats/Sanctioned Seats * 100

INDUSTRY SPECIFIC MODULE DETAILS Sr. No. YEAR Filled Seats No. of Industries Admission rate % 1 Aug-07 / Feb-08 0  2 Aug-08 / Feb-09 3 Aug-09 / Feb-10   TOTAL Admission Rate % = Filled Seats/Sanctioned Seats * 100

APPRENTISE TRAINING Sr. No. YEAR DESIGNATED TRADE NO. OF TRAINEES ENGAGED 1 2007-08 NA    2 2008-09   NA  3 2009-10  4 TOTAL

TRANSITION RATE Sr. No. YEAR BBBT to ADVANCE (X) Transition rate 1 Aug-07 / Feb-08 65/20  46% 2 Aug-08 / Feb-09 73/15  40% 3 Aug-09 / Feb-10 94/31  48%    TOTAL 232/66  45%  Note: How Many Students joined Advance Module from the lot of X ( X = BBBT Passed Out - Students who got the Job ) Transition Rate = 100 * No. of Students Admited in Advance Module / X

ADVANCE to INDUSTRY SPECIFIC (X) TRANSITION RATE Sr. No. YEAR ADVANCE to INDUSTRY SPECIFIC (X) Transition rate 1 Aug-07 / Feb-08  0 2 Aug-08 / Feb-09 3 Aug-09 / Feb-10   TOTAL 0  Note: How Many Students joined Specific Module from the lot of X ( X = Advance Module Passed Out - Students who got the Job ) Transition Rate = 100 * No. of Students Admitted in Specific Module / X

PASSOUT RATE - BBBT (NCVT Pattern) PASSOUT RATE - ADVANCE MODULE Sr. No. YEAR Total Appeared Total Passout 1 Jul-07  85 77 2 Jul-08 97  95 3 Jul-09  108 106    TOTAL  290 278  PASSOUT RATE - ADVANCE MODULE Feb-08 55  50 Feb-09 73  68  Feb-10 88  59 21 6 177  PASSOUT RATE - For ITI taken up for upgradation (NCVT Pattern) 59  61   35 35   134 133 

PLACEMENT EMPLOYMENT Sr. No. YEAR TOTAL PASSED EMPLOYMENT IN INDUSTRY   EMPLOYMENT Sr. No. YEAR TOTAL PASSED EMPLOYMENT IN INDUSTRY SELF EMPLOYMENT NO. OF REGISTRATION WITH EMPLOYMENT EXCHG. NO. OF CAMPUS INTERVIEW HELD 1 2006 – 07 2007 – 08 2008 - 09 463 522 517 210 240 225 NIl 398 475 435 15 20 23

AVERAGE MONTHLY SALARY EARNINGS PER MONTH Sr. No. YEAR AVERAGE MONTHLY SALARY 1 2006-07 Nil  2 2007-08 3350  3 2008-09  3600   Total Average 3475 

PROCUREMENT OF GOODS BBBT TRADE (Trade taken for Upgradation) AM ITI's (FOR 6 BBBT + 3 ADVANCE + 6 UPGRADED TRADES)   NAME Total No. of Unit Total Required Qty. Total Available Qty. % Availability BBBT Fundamentals of elect. & comp. 1 172 161 94 % Basic fitting 668 633 95 % Basic mechanical process 818 778 Fundamentals of general chemistry 769 763 99 % Basic Instrumentation 785 96 % Basic unit operation 342 329 AM Advance aocp 510 489 Advance Im 595 486 82 % Advance lacp 250 141 57 % TRADE (Trade taken for Upgradation) FT 2 1041 943 91 % WD 678 648 IT 171 83 % AOCP 1379 1329 LACP 4609 4539 98 % IMCP 970 940 97 %

COUNSTRUCTION OF CIVIL WORKS Sr. No. ADDITION AND ALTERATION / NEW WORK 1 Total Progressive Expenditure incurred Rs. 68.63 lacs. 2 Expected Date of Completion : work completed SET UP OF ADVANCE MODULE WORKSHOP Expected Date of Completion : Work completed CONSTRUCTION PHOTOGRAPHS REQUIRED

STAFF VACANCY (To be filled by November-2009) Sr. No. ITEM No. of Sanctioned No. of Filled No. of Vacant 1 Principal  01 01 2 Teaching Staff 54 44 11 3 Other 20  15 05   Total  75 59  17 

No of Instructor Completed training Training of Trainers Sr. No. Total Instructors No of Instructor Completed training    No. of Instructor CTI Training 1 Year CTI Training POT Training 3 Months CTI Engineering Technology 3 Month CTI Trade Technology 6 Month BBBT AM Other Training more than 7 Days 1   55 12 02 - 01 03

Revenue Generated (Rs.) REVENUE GENERATION Sr. No. ACTIVITY Revenue Generated (Rs.) 1 Budget I ncome of institute 0230 Labour & employment 4.60 (Please attach detail sheet of Revenue Generation)

PLACEMENT BEREAU ACTIVATION Sr. No. YEAR Total Trainee Pass out Bio Data Placed on Website Registered With Employment Exchange No. of Campus Interview Held No. of Trainee got Job Avg. Salary / Month 1 2 3  2006-07 2007-08 20008-09 Total 77 169 191 437 35 117 162 314 - 10 09 19 --

BUDGET - EXPENDITURE DETAILS (Year2009-2010) Remaining Expenditure Sr. No. Component Budget Provision Expenditure Remaining Expenditure   Plan Non Plan Total 1 Miscellaneous  - 19.20 -  19.20 2 Machinery & Equipment -   6.00 6.00 5.98 5.98  3 Civil 32.42  32.42 TOTAL

WOMAN PARTICIPATION ACTION TAKEN FOR ALLUMNI ASSOCIATION Sr. No. STEPS TAKEN TO INCREASE PARTICIPATION RESULTS 1 Jagruti abhiyan . Seminar in school. Advertisement   Will be seen in Aug. 2010 ACTION TAKEN FOR ALLUMNI ASSOCIATION Sr. No. STEPS TAKEN TO ASSOCIATE THE ALLUMNI RESULTS 1  Nil Nil

ACTIVITY FOR DISADVANTAGE GROUP ORIENTATION PROGRAM FOR IMC Sr. No. STEPS TAKEN RESULTS 1 Jagruti abhiyan . Seminar in school. Advertisement     Will be seen in Aug. 2010 ORIENTATION PROGRAM FOR IMC Sr. No. STEPS TAKEN RESULTS 1 Meeting Contacts  IMC formed & Expenditure for COE to develop COE sector.

RAISING AWARENESS AMONG POTENTIAL STUDENTS & INDUSTRY Sr. No. STEPS TAKEN RESULTS 1 Industrial visit  - About 200 students visited several Industry. 2 Campus Interview  06 Companies have arranged campus Interview.  187 Students attended & 89 students selected. 3 On Job Training  - 40 trainees will go for on job training during April – 2010. 

Best Practices Presentation PART: 2 Best Practices Presentation 22

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ENTRANCE GATE OF ITI Before After

SIGN BOARD NEAR GATE OF ITI LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD SIGN BOARD NEAR GATE OF ITI After Before I.T.I. PARDI

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ENTRANCE ROAD TO ITI Before After

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD COE BUILDING Before After

LANDSCAPING & FRONTAGE LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD LANDSCAPING & FRONTAGE Before After

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ENTRANCE OF BUILDING After Before

ENTRANCE OF BUILDING BLOCK B LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ENTRANCE OF BUILDING BLOCK B

BUILDING & WORKSHOP CORRIDORS LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD BUILDING & WORKSHOP CORRIDORS After Before

THEORY & AUDIO VISUAL ROOM LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD THEORY & AUDIO VISUAL ROOM Before After

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CONFERENCE ROOM After Before

Existing workshop for CHBT LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Existing workshop for CHBT Mod.1 - Fundamental of Electronics & Computers Mod.2 - Basic Fittings and Measurements Mod.3 - Basic Mechanical Processes Mod.4 - Fundamental of General Chemistry & Physics Mod.5 - Basic Instrumentation Mod.6 - Basic unit Operations and Processes

CHBT-1 Electronics & Computers LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT-1 Electronics & Computers Before After

CHBT- 2 Basic Fitting Lab. LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT- 2 Basic Fitting Lab. Before After

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT- 3 Mech.Process Lab. After Before

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT- 4 Chemistry Lab. Before After

CHBT – 5 Instrumentation Lab. LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT – 5 Instrumentation Lab. After Before

CHBT – 6 Unit Operation Lab. LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT – 6 Unit Operation Lab. After Before

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHAT 01 ADV. AO Before After

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHAT 03 ADV. IM Before After

Instrument Mechanic Lab. Before After

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ELECTRONICS LAB After Before

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD IT LAB After Before

Plastic Processing Operator LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Plastic Processing Operator Before After

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Wireman After Before

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Mechanic Diesel Before After

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD COPA Lab. Before After

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD APPAREL PARK

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD COE STAFF DRESS CODE Before After

PLACEMENT ADVISORY BUREAU After Before

PLACEMENT ADVISORY BUREAU Before After

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Website of ITI

Training Materials for each COE Module Fundamental of Electronics & Computer Lesson No.. Lesson Name 1 Atomic theory 2 Active & Passive components 3 Integrated circuits 4 Logic Gates 5 MS- Word 6 MS- Excel 7 MS - powerpoint 8 AutoCAD

Training Materials for each COE Module Basic Fittings and Measurements Lesson No. Lesson Name 1 Vernier Caliper 2 Micrometer 3 Dial Gauge 4 Hand Tools 5 Drilling Machine 6 Limit- Fit 7 Taps & Die 8 File, Hackshaw, Bench vice

Training Materials for each COE Module Basic Mechanical Processes Lesson No. Lesson Name 1 Lathe machine 2 Cutting tool material 3 Tapper turning 4 Welding 5 Metal joining process 6 Thread cutting 7 Safety precaution

Training Materials for each COE Module Fundamental of General Chemistry & Physics Lesson No. Lesson Name 1 Units & Measurement   2 Viscocity & Density 3 Acid , baise solution 4 Metal & Non metal 5 Transformers 6 Volumetric Analysis 7 Physical dimension

Training Materials for each COE Module Basic Instrumentation Lesson No. Lesson Name 1 Pressure measurement equipments 2 Temperature measurement equipments 3 Level Indicators 4 Purge systems 5 Flow meters 6 PH meter 7 Hygro meter, Hydro meter 8 Anemometer

Training Materials for each COE Module Basic unit Operations and Processes Lesson No. Lesson Name 1 Fluid flow operation 2 Extraction & leaching 3 Absorption & Adsorption 4 Lagging material 5 Distillation 6 Fertilizers 7 Mfg. processes Urea, Soap, Nitric acid etc. 8 Screening 9 Filteration

Training Materials for each COE Module Adv. AOCP Lesson No. Lesson Name 1 Fluid Transportation 2 Valves 3 Pumps 4 Heat transfer 5 Evaporation 6 Distilation & its types 7 Centirifugation 8 Crystalisation 9 Water & Air polution

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Energy Saving

Status of ISO Certification ISO Consultant has been selected and order to be given to Ahmedabad neboulous. ISO training has been conducted on dated 5th Jan. 2010, 22nd Feb. 2010, 19th March. 2010. ISO audit will be conducted on 16th April 2010.

Civil Work under CoE For New Building LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Civil Work under CoE For New Building Rs. 32 Lac. Sanctioned for new building. T.S. approved tendering process by PWD. Will be carried out. For New Existing Building Electrification compeleted.

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Miscellaneous Expenditure Provision for current year 2009- 2010 Rs. 19.20 lacs. How many tender issued Nil How many order placed Amount of Expenditure incurred upto 31st March 2010 How much expenditure is to be incurred up to March - 2010

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Machinery Equipment Provision for current year 2009- 2010 Rs. 6 lacs. How many tender issued Nil How many order placed Amount of Expenditure incurred upto 31st March 2010. Rs. 5.98 lacs. How much expenditure is to be incurred up to March - 2010

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Status of On roll in BBBT/ Advance Module On Roll BBBT 132 Advanced AOCP 11 Advanded IMCP Advanced LACP Total 10 164

Plantation Open land available in sq. mt. 86821 sq.mt. LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Plantation Open land available in sq. mt. 86821 sq.mt. Perimeter of Boundary wall in meter of compund 1200 mts. How many plants planted in July 2009 5000 Nos. How many plants survived as on 31st March 2010. 4500 + (984 grown up trees till June 09) Which different type of plants planted in ITI in July 2009 Boganvel, Neem, Saptapadi, Asopalav & others.

Plantation

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Plantation Survival

Plantation

Plantation

Plantation

Plantation

Plantation

Plantation

Plantation

Plantation

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Seminar on E.M.F.

LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Staff Meeting

THANK YOU