INDUSTRIAL TRAINING INSTITUTE LATE I.C. DESAI I.T.I. PARDI PART: 1 CoE ITI Details
UPGRADATION DETAILS (wherever only upgradation is taken up) Sr. No. YEAR Sanctioned Seats Filled Seats Admission rate % 1 Aug-06 62 81 130% 2 Aug-07 64 84 131% 3 Aug-08 80 105% 4 Aug-09 68 90 132% TOTAL 274 339 124% Admission Rate % = Filled Seats/Sanctioned Seats * 100
Admission Rate % = Filled Seats/Sanctioned Seats * 100 BBBT DETAILS Sr. No. YEAR Sanctioned Seats Filled Seats Admission rate % 1 Aug-06 96 114 119% 2 Aug-07 96 120 125% 3 Aug-08 144 150% 4 Aug-09 132 137% TOTAL 384 510 139% Admission Rate % = Filled Seats/Sanctioned Seats * 100
ADVANCE MODULE DETAILS Sr. No. YEAR Sanctioned Seats Filled Seats Admission rate % August February 1 Aug-07 / Feb-08 96 65 20 67% 21% 2 Aug-08 / Feb-09 73 15 76% 15% 3 Aug-09 / Feb-10 94 31 98% 32% TOTAL 288 232 66 81% 23% Admission Rate % = Filled Seats/Sanctioned Seats * 100
INDUSTRY SPECIFIC MODULE DETAILS Sr. No. YEAR Filled Seats No. of Industries Admission rate % 1 Aug-07 / Feb-08 0 2 Aug-08 / Feb-09 3 Aug-09 / Feb-10 TOTAL Admission Rate % = Filled Seats/Sanctioned Seats * 100
APPRENTISE TRAINING Sr. No. YEAR DESIGNATED TRADE NO. OF TRAINEES ENGAGED 1 2007-08 NA 2 2008-09 NA 3 2009-10 4 TOTAL
TRANSITION RATE Sr. No. YEAR BBBT to ADVANCE (X) Transition rate 1 Aug-07 / Feb-08 65/20 46% 2 Aug-08 / Feb-09 73/15 40% 3 Aug-09 / Feb-10 94/31 48% TOTAL 232/66 45% Note: How Many Students joined Advance Module from the lot of X ( X = BBBT Passed Out - Students who got the Job ) Transition Rate = 100 * No. of Students Admited in Advance Module / X
ADVANCE to INDUSTRY SPECIFIC (X) TRANSITION RATE Sr. No. YEAR ADVANCE to INDUSTRY SPECIFIC (X) Transition rate 1 Aug-07 / Feb-08 0 2 Aug-08 / Feb-09 3 Aug-09 / Feb-10 TOTAL 0 Note: How Many Students joined Specific Module from the lot of X ( X = Advance Module Passed Out - Students who got the Job ) Transition Rate = 100 * No. of Students Admitted in Specific Module / X
PASSOUT RATE - BBBT (NCVT Pattern) PASSOUT RATE - ADVANCE MODULE Sr. No. YEAR Total Appeared Total Passout 1 Jul-07 85 77 2 Jul-08 97 95 3 Jul-09 108 106 TOTAL 290 278 PASSOUT RATE - ADVANCE MODULE Feb-08 55 50 Feb-09 73 68 Feb-10 88 59 21 6 177 PASSOUT RATE - For ITI taken up for upgradation (NCVT Pattern) 59 61 35 35 134 133
PLACEMENT EMPLOYMENT Sr. No. YEAR TOTAL PASSED EMPLOYMENT IN INDUSTRY EMPLOYMENT Sr. No. YEAR TOTAL PASSED EMPLOYMENT IN INDUSTRY SELF EMPLOYMENT NO. OF REGISTRATION WITH EMPLOYMENT EXCHG. NO. OF CAMPUS INTERVIEW HELD 1 2006 – 07 2007 – 08 2008 - 09 463 522 517 210 240 225 NIl 398 475 435 15 20 23
AVERAGE MONTHLY SALARY EARNINGS PER MONTH Sr. No. YEAR AVERAGE MONTHLY SALARY 1 2006-07 Nil 2 2007-08 3350 3 2008-09 3600 Total Average 3475
PROCUREMENT OF GOODS BBBT TRADE (Trade taken for Upgradation) AM ITI's (FOR 6 BBBT + 3 ADVANCE + 6 UPGRADED TRADES) NAME Total No. of Unit Total Required Qty. Total Available Qty. % Availability BBBT Fundamentals of elect. & comp. 1 172 161 94 % Basic fitting 668 633 95 % Basic mechanical process 818 778 Fundamentals of general chemistry 769 763 99 % Basic Instrumentation 785 96 % Basic unit operation 342 329 AM Advance aocp 510 489 Advance Im 595 486 82 % Advance lacp 250 141 57 % TRADE (Trade taken for Upgradation) FT 2 1041 943 91 % WD 678 648 IT 171 83 % AOCP 1379 1329 LACP 4609 4539 98 % IMCP 970 940 97 %
COUNSTRUCTION OF CIVIL WORKS Sr. No. ADDITION AND ALTERATION / NEW WORK 1 Total Progressive Expenditure incurred Rs. 68.63 lacs. 2 Expected Date of Completion : work completed SET UP OF ADVANCE MODULE WORKSHOP Expected Date of Completion : Work completed CONSTRUCTION PHOTOGRAPHS REQUIRED
STAFF VACANCY (To be filled by November-2009) Sr. No. ITEM No. of Sanctioned No. of Filled No. of Vacant 1 Principal 01 01 2 Teaching Staff 54 44 11 3 Other 20 15 05 Total 75 59 17
No of Instructor Completed training Training of Trainers Sr. No. Total Instructors No of Instructor Completed training No. of Instructor CTI Training 1 Year CTI Training POT Training 3 Months CTI Engineering Technology 3 Month CTI Trade Technology 6 Month BBBT AM Other Training more than 7 Days 1 55 12 02 - 01 03
Revenue Generated (Rs.) REVENUE GENERATION Sr. No. ACTIVITY Revenue Generated (Rs.) 1 Budget I ncome of institute 0230 Labour & employment 4.60 (Please attach detail sheet of Revenue Generation)
PLACEMENT BEREAU ACTIVATION Sr. No. YEAR Total Trainee Pass out Bio Data Placed on Website Registered With Employment Exchange No. of Campus Interview Held No. of Trainee got Job Avg. Salary / Month 1 2 3 2006-07 2007-08 20008-09 Total 77 169 191 437 35 117 162 314 - 10 09 19 --
BUDGET - EXPENDITURE DETAILS (Year2009-2010) Remaining Expenditure Sr. No. Component Budget Provision Expenditure Remaining Expenditure Plan Non Plan Total 1 Miscellaneous - 19.20 - 19.20 2 Machinery & Equipment - 6.00 6.00 5.98 5.98 3 Civil 32.42 32.42 TOTAL
WOMAN PARTICIPATION ACTION TAKEN FOR ALLUMNI ASSOCIATION Sr. No. STEPS TAKEN TO INCREASE PARTICIPATION RESULTS 1 Jagruti abhiyan . Seminar in school. Advertisement Will be seen in Aug. 2010 ACTION TAKEN FOR ALLUMNI ASSOCIATION Sr. No. STEPS TAKEN TO ASSOCIATE THE ALLUMNI RESULTS 1 Nil Nil
ACTIVITY FOR DISADVANTAGE GROUP ORIENTATION PROGRAM FOR IMC Sr. No. STEPS TAKEN RESULTS 1 Jagruti abhiyan . Seminar in school. Advertisement Will be seen in Aug. 2010 ORIENTATION PROGRAM FOR IMC Sr. No. STEPS TAKEN RESULTS 1 Meeting Contacts IMC formed & Expenditure for COE to develop COE sector.
RAISING AWARENESS AMONG POTENTIAL STUDENTS & INDUSTRY Sr. No. STEPS TAKEN RESULTS 1 Industrial visit - About 200 students visited several Industry. 2 Campus Interview 06 Companies have arranged campus Interview. 187 Students attended & 89 students selected. 3 On Job Training - 40 trainees will go for on job training during April – 2010.
Best Practices Presentation PART: 2 Best Practices Presentation 22
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ENTRANCE GATE OF ITI Before After
SIGN BOARD NEAR GATE OF ITI LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD SIGN BOARD NEAR GATE OF ITI After Before I.T.I. PARDI
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ENTRANCE ROAD TO ITI Before After
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD COE BUILDING Before After
LANDSCAPING & FRONTAGE LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD LANDSCAPING & FRONTAGE Before After
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ENTRANCE OF BUILDING After Before
ENTRANCE OF BUILDING BLOCK B LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ENTRANCE OF BUILDING BLOCK B
BUILDING & WORKSHOP CORRIDORS LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD BUILDING & WORKSHOP CORRIDORS After Before
THEORY & AUDIO VISUAL ROOM LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD THEORY & AUDIO VISUAL ROOM Before After
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CONFERENCE ROOM After Before
Existing workshop for CHBT LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Existing workshop for CHBT Mod.1 - Fundamental of Electronics & Computers Mod.2 - Basic Fittings and Measurements Mod.3 - Basic Mechanical Processes Mod.4 - Fundamental of General Chemistry & Physics Mod.5 - Basic Instrumentation Mod.6 - Basic unit Operations and Processes
CHBT-1 Electronics & Computers LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT-1 Electronics & Computers Before After
CHBT- 2 Basic Fitting Lab. LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT- 2 Basic Fitting Lab. Before After
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT- 3 Mech.Process Lab. After Before
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT- 4 Chemistry Lab. Before After
CHBT – 5 Instrumentation Lab. LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT – 5 Instrumentation Lab. After Before
CHBT – 6 Unit Operation Lab. LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHBT – 6 Unit Operation Lab. After Before
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHAT 01 ADV. AO Before After
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD CHAT 03 ADV. IM Before After
Instrument Mechanic Lab. Before After
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD ELECTRONICS LAB After Before
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD IT LAB After Before
Plastic Processing Operator LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Plastic Processing Operator Before After
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Wireman After Before
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Mechanic Diesel Before After
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD COPA Lab. Before After
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD APPAREL PARK
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD COE STAFF DRESS CODE Before After
PLACEMENT ADVISORY BUREAU After Before
PLACEMENT ADVISORY BUREAU Before After
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Website of ITI
Training Materials for each COE Module Fundamental of Electronics & Computer Lesson No.. Lesson Name 1 Atomic theory 2 Active & Passive components 3 Integrated circuits 4 Logic Gates 5 MS- Word 6 MS- Excel 7 MS - powerpoint 8 AutoCAD
Training Materials for each COE Module Basic Fittings and Measurements Lesson No. Lesson Name 1 Vernier Caliper 2 Micrometer 3 Dial Gauge 4 Hand Tools 5 Drilling Machine 6 Limit- Fit 7 Taps & Die 8 File, Hackshaw, Bench vice
Training Materials for each COE Module Basic Mechanical Processes Lesson No. Lesson Name 1 Lathe machine 2 Cutting tool material 3 Tapper turning 4 Welding 5 Metal joining process 6 Thread cutting 7 Safety precaution
Training Materials for each COE Module Fundamental of General Chemistry & Physics Lesson No. Lesson Name 1 Units & Measurement 2 Viscocity & Density 3 Acid , baise solution 4 Metal & Non metal 5 Transformers 6 Volumetric Analysis 7 Physical dimension
Training Materials for each COE Module Basic Instrumentation Lesson No. Lesson Name 1 Pressure measurement equipments 2 Temperature measurement equipments 3 Level Indicators 4 Purge systems 5 Flow meters 6 PH meter 7 Hygro meter, Hydro meter 8 Anemometer
Training Materials for each COE Module Basic unit Operations and Processes Lesson No. Lesson Name 1 Fluid flow operation 2 Extraction & leaching 3 Absorption & Adsorption 4 Lagging material 5 Distillation 6 Fertilizers 7 Mfg. processes Urea, Soap, Nitric acid etc. 8 Screening 9 Filteration
Training Materials for each COE Module Adv. AOCP Lesson No. Lesson Name 1 Fluid Transportation 2 Valves 3 Pumps 4 Heat transfer 5 Evaporation 6 Distilation & its types 7 Centirifugation 8 Crystalisation 9 Water & Air polution
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Energy Saving
Status of ISO Certification ISO Consultant has been selected and order to be given to Ahmedabad neboulous. ISO training has been conducted on dated 5th Jan. 2010, 22nd Feb. 2010, 19th March. 2010. ISO audit will be conducted on 16th April 2010.
Civil Work under CoE For New Building LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Civil Work under CoE For New Building Rs. 32 Lac. Sanctioned for new building. T.S. approved tendering process by PWD. Will be carried out. For New Existing Building Electrification compeleted.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Miscellaneous Expenditure Provision for current year 2009- 2010 Rs. 19.20 lacs. How many tender issued Nil How many order placed Amount of Expenditure incurred upto 31st March 2010 How much expenditure is to be incurred up to March - 2010
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Machinery Equipment Provision for current year 2009- 2010 Rs. 6 lacs. How many tender issued Nil How many order placed Amount of Expenditure incurred upto 31st March 2010. Rs. 5.98 lacs. How much expenditure is to be incurred up to March - 2010
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Status of On roll in BBBT/ Advance Module On Roll BBBT 132 Advanced AOCP 11 Advanded IMCP Advanced LACP Total 10 164
Plantation Open land available in sq. mt. 86821 sq.mt. LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Plantation Open land available in sq. mt. 86821 sq.mt. Perimeter of Boundary wall in meter of compund 1200 mts. How many plants planted in July 2009 5000 Nos. How many plants survived as on 31st March 2010. 4500 + (984 grown up trees till June 09) Which different type of plants planted in ITI in July 2009 Boganvel, Neem, Saptapadi, Asopalav & others.
Plantation
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Plantation Survival
Plantation
Plantation
Plantation
Plantation
Plantation
Plantation
Plantation
Plantation
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Seminar on E.M.F.
LATE I.C.DESAI, INDUSTRIAL TRAINING INSTITUTE. PARDI, DIST. VALSAD Staff Meeting
THANK YOU