Transmission Corridor Zone Designation Process Terrence O'Brien, CEC December 11, 2007 Energy Action Plan.

Slides:



Advertisements
Similar presentations
OHIO ENERGY POLICY PROGRESS & REVIEW UCEAO 6 th Annual Conference Securing Ohio’s Energy and Economic Future THE BEST OF TIMES, THE WORST OF TIMES: ADVANCED.
Advertisements

General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
RESOLVE, Inc. National Geothermal Collaborative An Overview January 20, 2004.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Creating a Renewable Energy Opportunity Plan for Southwest Wisconsin Legal Considerations Michael Allen October 21 st 2011.
Western States Energy & Environment Symposium October 27, 2009.
Oregon Climate Change Regulatory Activities and Policy Initiatives Bill Drumheller -- Oregon Department of Energy University of Oregon School of Law Climate.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
Triennial Plan 2: Legal Framework. About Us  Efficiency Maine is an independent trust – Accounts and administrative responsibilities transferred from.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
COSTS AND BENEFITS OF A BIOMASS-TO-ETHANOL PRODUCTION INDUSTRY IN CALIFORNIA Pat Perez- Energy Commission May 8, rd Symposium on Biotechnology for.
Local Planning Process The General Plan SB 18 Training Program.
Regulations Governing Siting of Electric Facilities in California AEP Orange County Chapter June 30, 2009 Christine McLeod, Project Manager - Regulatory.
IEPR Response Joe Desmond Resources Agency Deputy Secretary for Energy Joint Energy Action Plan Meeting March 23, 2005.
Post 2012 Energy Efficiency Planning Schedule: Options and Implications February 16, am - 5 pm CPUC Auditorium.
Oregon Renewable Energy Action Plan April 2005 with Geothermal Energy highlights by Carel DeWinkel Senior Policy Analyst.
NSDI Future Directions Initiative Towards a National Geospatial Strategy and Implementation Plan Ivan B. DeLoatch FGDC Staff Director.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Wyoming Energy Strategy Draft for discussion purposes Office of Governor Matt Mead Shawn Reese, Policy Director Draft.
Carrie E. Markovitz, PhD Program Evaluation: Challenges and Recommendations July 23, 2015.
Evaluation and Appraisal Comprehensive Plan Amendments City Council Workshop December 9, 2014.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Transmission for a 33% RPS Keith E. Casey Vice President Market and Infrastructure Development California ISO The Independent Energy Producers Association.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
R / I Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code :15pm.
Department of Energy Energy Agency Reorganization Plan Senate Energy, Utilities and Communications Committee Governor Schwarzenegger’s Plan to Establish.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
California Energy Commission Options for Developing Contingency Mitigation Measures 2015 Integrated Energy Policy Report UC Irvine Campus, Irvine, California.
Overview of a Water Action Plan: California Public Utilities Commission Paul G. Townsley, President Arizona American Water January 18, 2011.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
1 Review of CPUC Role with the Public Interest Energy Research (PIER) Program on Natural Gas Briefing for California Senate Energy, Utilities and Communications.
PowerButte: Solar Overlay Tim Snellings, Director Department of Development Services Photo courtesy of Shamim Mohamed A Place For Clean Energy.
Greenhouse Gas Policy Activities / Update Julie Fitch Public Utilities Commission Kevin Kennedy Energy Commission Joint Meeting May 22, 2007 Energy Action.
California’s Renewable Energy Transmission Initiative Anne Gillette Renewable Energy Policy Analyst California Public Utilities Commission August 12, 2008.
CPUC Role in AB 32 Implementation LIOB – 2 nd June, 2010 San Diego, CA.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
Reliable Power Reliable Markets Reliable People RAS Guideline Initiative March 23, 2009.
Defenders of Wildlife Species we are helping to protect.
Decommissioning Rules & Funds for Renewable Energy Facilities RenewElec Workshop October 21, 2010 Jonathan Voegele Research Associate Institute for Energy.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
MARCH 13, 2014 CCC HEARING SOUTH BAY SUBSTATION RELOCATION PROJECT (SDG&E) CDP #E ; Th11b.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
California Energy Commission An Overview of the Renewable Energy Transmission Initiative (RETI 1.0) Joint Agency Workshop to Introduce the Renewable Energy.
California Energy Action Plan July 17, Energy Action Plan Natural Gas Actions Status Report David Maul California Energy Commission Staff And Richard.
CALIFORNIA ENERGY COMMISSION Renewable Energy Transmission Initiative (RETI)
RETI 2.0 Objectives The Clean Energy and Pollution Reduction Act of 2015 (Chapter 547, Statutes of 2015) increases the RPS to at least 50 percent of retail.
Health and Community Working Group November 20, 2014.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
Energy Policy Act – 2005 West-Wide Energy Corridors.
Growing Smarter Pennsylvania’s Land Use Agenda. Percent of Land Developed in Pennsylvania Source: Natural Resources Conservation Service, U.S. Department.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
WGA Consultants Keyes & Fox LLP is a law firm that specializes in the renewable energy and distributed generation sectors. K&F has in-depth experience.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
Updated Subgroup Recommendations on draft Housing Goals & Objectives October 20, 2004 Subgroup Members: Don Eggert, Marianne Morton, Phil Salkin, & Alex.
Department of Energy Energy Agency Reorganization Plan Little Hoover Commission Hearing on Governor Schwarzenegger’s Plan to Establish a Department of.
AB 982 AND THE DRECP A B RIEF O VERVIEW California State Lands Commission Jennifer DeLeon February 22, 2013.
Flynn & Associates1 SF LAFCO Energy Consultant(s) RFQ Overview of Critical Issues and Flynn & Associates’ Expertise April 19, 2002.
Open Access Transmission Tariff Amendment No. 9 Greg Broeking, Chief Financial Officer March 7, 2012.
CY 2017 Goals and Objectives
MPO School Transportation Working Group
Tam O’Shanter Rezoning
Policy Instruments Proposals for RECP
California Transportation Electrification Activities
Presentation transcript:

Transmission Corridor Zone Designation Process Terrence O'Brien, CEC December 11, 2007 Energy Action Plan

2 9/18/06 What is it? A 12-month process to designate transmission corridor zones for future use as proposed by an investor-owned or municipal utility, a merchant, or by the Energy Commission on its own motion. Designated transmission corridor zones are to be reviewed and revised, as necessary, by the Energy Commission at least every 10 years. 12/11/2007

3 9/18/06 What are the purposes of the designation process? Designate and preserve corridor zones to meet long-term high- voltage transmission infrastructure needs. Facilitate development of renewable generation. Improve reliability of transmission system. Streamline permitting and increase the certainty of permitting outcomes. Provide a link between long-term transmission planning and permitting. Involve local, state and federal governments, generators, other stakeholders, and the public in planning for transmission corridor zones. Promote consistency of land use changes with future transmission line development. 12/11/2007

4 9/18/06 What are the components of the designation process? Determination of consistency of proposed transmission corridor with latest Strategic Transmission Investment Plan (Strategic Plan) adopted by the Energy Commission. Preparation of Environmental Impact Report to serve as the basis for designation of the transmission corridor zone.  Evaluates alternative corridors and “non-wires” alternatives.  Evaluates constraints and impacts, mitigation measures, and avoidance opportunities.  Tiered environmental review for streamlined transmission line permitting. 12/11/2007

5 9/18/06 Where are we? The Energy Commission adopted implementing regulations on 12/5/07. The CEC and CPUC staff met on 12/7/07 to discuss implementation of the TCD process. CEC staff has suggested that an MOU between the CEC and CPUC may be useful, further discussions are planned.

6 9/18/ Strategic Plan Recommendations Allow investor-owned utilities to keep transmission corridor zone investments in their rate base for the duration of the corridor zone’s designation. When evaluating future transmission projects within a designated corridor, the CPUC and other permitting agencies should use the CEC’s transmission corridor need determination to facilitate and expedite the need determination for the specific transmission “poles and wires” proposed to be sited in an approved corridor. The CAISO should consider designated corridor zones in its transmission planning process. Encourage SB 1059 applications for three categories of corridors on non-federal lands:  Corridors that would provide access to renewable resource areas.  Corridors that would interconnect with existing or proposed federal corridors.  Existing corridors that may be required for future facility upgrades. Seek agreement among interested parties with similar transmission needs during development of the Strategic Plan before accepting a corridor designation application. Explore options for earlier consideration of “non-wires” alternatives in statewide planning processes. 12/11/2007