Disaster Risk Reduction and Climate Change Adaptation in the Dili – Ainaro Road Corridor Supporting the Government of Timor Leste in Disaster Risk Management.

Slides:



Advertisements
Similar presentations
Role of WMO in Natural Disaster Risk Reduction Ivan Obrusník, Czech Hydrometeorological Institute Role of WMO in Natural Disaster Risk Reduction Ivan Obrusník,
Advertisements

Global Platform for Disaster Risk Reduction, June 2009, Geneva Special event: Accessing space-based information to support disaster risk reduction,
DRM Working Group FAO Rome
DS-01 Disaster Risk Reduction and Early Warning Definition
Mainstreaming of DRR in Development Planning -Tajikistan Case Study Khusrav Sharifov, Manager, Disaster Risk Management Programme, UNDP Tajikistan DIPECHO.
Operationalising Strategic Development Plan for Effective Results Presentation by Development Partners Economic Strategic Sector presented by World Bank.
Investing in the Cascading Forecasting Process in Modernizing National Meteorological and Hydrological Services WB & WMO.
AGENDA ITEM 4: FOLLOW-UP ON THE DECISIONS OF THE WORLD METEOROLOGICAL CONGRESS ON THE INTERGOVERNMENTAL BOARD ON CLIMATE SERVICES AGENDA ITEM 4.1: IMPLEMENTATION.
Progress and Strategic Directions in the Pacific Brussels, 07 July 2014 Michael Bonte-Grapentin, Senior DRM specialist.
GEF-5 Strategy for Adaptation GEF Expended Constituency meeting, 2011 Kinshasa February 2011 Adamou Bouhari Task Manager Biodiversity/Land Degradation.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Mainstreaming Disaster Risk Management in Iraq
National Disaster Risk Management Program NDRMP Belgrade, March
Protection and Disaster Risk Reduction (Place) – (Date) Session 6.1: Integrating Protection into Disaster Risk Reduction.
Responding to Climate Change Through Flood Early Warning System Gehendra B. Gurung Practical Action Nepal Local Practitioners and Climate Change Finance.
June, 2003 Poverty and Climate Change Reducing the Vulnerability of the Poor through Adaptation Poverty and Climate Change Reducing the Vulnerability of.
Mainstreaming the Environment Across DFID’s Work ENVIRONMENTPOLICYENVIRONMENTPOLICY.
Background Based on Global Framework agreed in Kobe. Developed through regional and national consultations over two years. Includes lessons learned since.
Common recommendations and next steps for improving local delivery of climate finance Bangkok, October 31, 2012.
Disaster Reduction & Climate Change Adaptation by Fengmin Kan, UN-ISDR Africa Nairobiwww.unisdr.org.
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
UNDP Climate Change Adaptation 20 September, 2006.
Adaptation & Technology Gaps Anne Olhoff Head of Programme Climate Resilient Development UNEP Risø Centre UNEP Adaptation Knowledge Day V, Bonn, 9 June.
Multilateral and bilateral development financing mechanisms that integrate climate change and key issues in making these programmes more effective Phil.
LDCF/SCCF Climate Change Adaptation Strategy GEF Expanded Constituency Workshop 27 – 29 September 2011 Honiara, Solomon Islands.
23 rd September 2008 HFA Progress Report Disaster Risk Reduction in South Asia P.G.Dhar Chakrabarti Director SAARC Disaster Management Centre New Delhi.
ICTs Tackling Climate Changes Dr. Amr Badawi Executive President NTRA.
Adaptation to Climate Change: Making development disaster-proof January 2008.
Seventh framework programme CAPACITIES specific programme Activities of international cooperation Coordination Support Action - Grant agreement no.:
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
Sub-Regional Workshop for GEF Focal Points in Eastern and Southern Africa Nairobi, Kenya, May 2009 Leveraging national communications to integrate.
European Commission Environmental cooperation in the Mediterranean June 2009.
Country Presentation- GEF Operational Focal Point, Sri Lanka GEF Sub-Regional Workshop 2-3 December 2007, Bali, Indonesia Anura Jayatilake Director, Environmental.
Rehabilitation in agriculture What can we learn from recent experiences? Laurent Thomas, Director FAO Emergency Operations and Rehabilitation Division.
Disaster Risk Management and Examples of Early Warning Projects at the The Inter-American Development Bank.
8 TH -11 TH NOVEMBER, 2010 UN Complex, Nairobi, Kenya MEETING OUTCOMES David Smith, Manager PEI Africa.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
Ministerul Mediului si Gospodaririi Apelor Session 6 - Enhancing National GEF Coordination, Communication and Outreach Developing the National Capacity.
The China Biodiversity Partnership And Framework for Action (CBPF) A Programmatic Approach for Biodiversity Conservation.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
Flash Flood Forecasting as an Element of Multi-Hazard Warning Systems Wolfgang E. Grabs Chief, Water Resources Division WMO.
Concern Worldwide’s Approach to Disaster Risk Reduction.
Assessing Vulnerability and Adaptation to Climate-related Risks A Flavour of SEI Activities Stockholm Environment Institute Frank Thomalla with contributions.
AfDB Partnership Forum April 2012 (speaker / department) Ken JOHM Division Manager, OSAN4.
Technical Session 3 : Promoting Integration of Disaster Risk Reduction, Climate Change Adaptation and Green Growth for Sustainable Development Technical.
European capacity building initiativeecbi Adaptation in the Paris Agreement Ambition and Permanence for the Cancun Adaptation Framework Juan P Hoffmaister.
 Key achievements since the PCCRT, 2009  Current climate change projects  JNAP process  JNAP Implementation status  Challenges/lessons learned 
CRMI Phase II Support For Disaster Risk Reduction and Climate Change Adaptation in the Caribbean SIDS Through Partnership.
1 HFA New Paradigm in Disaster Risk Reduction Expert Meeting on NMHss Participation in Disaster Risk Reduction Coordination Mechanisms and.
1.1.Recovery strategic planning capacities are strengthened. 1.2.Local capacity for ER planning and implementation strengthened in areas of expertise where.
Leveraging national communications to integrate climate change issues into development policy Sub-Regional Workshop for GEF Focal Points in West and Central.
Decisions on Adaptation Special Climate Change Fund Support for, inter alia, adaptation activities identified in National Communications and National Adaptation.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
IADB REGIONAL POLICY DIALOGUE June 25-26, Presented by : Ronald Jackson, Director General, ODPEM, Jamaica.
SARDAR VALLABHBHAI PATEL INSTITUTE OF TECHNOLOGY,VASAD ENGINEERING ECONOMICS & MANAGEMENT.
Tools for Mainstreaming Disaster Risk Reduction: Guidance Notes for Development Organisations Charlotte Benson and John Twigg Presented by Margaret Arnold.
India Development Strategy (FY2012–FY2016) ADB India’s Country Partnership Strategy (2013 – 2017) ADB’s Long-Term Strategic Framework (Strategy 2020)
ICTs in Disaster Risk Reduction and Disaster Response
Project Debriefing Debriefing meeting on the implementation status of two ADB- JFPR funded projects: (i) Technical Assistance Strengthening Coordination.
A Presentation to the 2017 GEO Work Programme Symposium,
Albania Disaster Risk Mitigation and Adaptation Project
NEPAL RECOVERY TO RESILIENCE
GEF governance reforms to enhance effectiveness and civil society engagement Faizal Parish GEC, Central Focal Point , GEF NGO Network GEF-NGO Consultation.
The Hyogo Framework for Action and ISDR system- and WMO
The Biodiversity and Protected Areas Management (BIOPAMA) Programme
CRUE – The Way Forward Vicki Jackson
United Nations Development Programme
Objectives of the African Package for
Afghanistan Climate Budgeting Guidelines
The EU Strategy for Adaptation to climate change
Presentation transcript:

Disaster Risk Reduction and Climate Change Adaptation in the Dili – Ainaro Road Corridor Supporting the Government of Timor Leste in Disaster Risk Management & Climate Change Adaptation

We cannot stop natural disasters but we can arm ourselves with knowledge: so many lives and livelihoods across the World wouldn't have to be lost if there was enough disaster preparedness.

"whatever can happen will happen“ Murphy’s Law

Timor-Leste Hazard profile Threats from geological hazard include earthquake and tsunami rare events but huge potential of significant damage Main hazards are hydro-meteorological resulting in frequent localized disasters: flash floods, droughts, landslides and destructive winds frequent and serious impact to community (agriculture and transport sectors)

According to a road condition survey in 2008, the national road network has almost entirely deteriorated and is no longer maintainable: - 65% of national roads are in “very poor” condition - 96% of rural roads are in “very poor” condition Due to the steep terrain, ground conditions and local climate, slope instability is a major problem and slips can result in significant damage to the road network and potential risk to road users. In many cases roads have not been properly designed, lack sufficient drainage capacity and/or are structurally unsound. A fragile road network is vulnerable to frequent localized disasters. Flash floods and landslides destroying roads further isolate communities and hamper disaster response efforts.

The Government of Timor Leste understands these problems and is currently addressing them through large infrastructure projects across the country 54% of the National Budget of 2012 was spent on infrastructure, of which $167m was specifically for roads (increased from $40m in 2011) $40m $167m $162m (projected) The Strategic Development Plan highlights the importance of improved roads as necessary to achieve strong economic growth and improve human development. “An extensive network of quality and well maintained roads is essential to connect our communities, promote rural development, industry and tourism, and provide access to markets.” SDP, 2011.

Loans and Grants Many bilateral and multilateral development organisations are partnering the government through supplying access to loans and grants as well as technical expertise in infrastructure development. These include: The World Bank JICA ADB AusAID UN (ILO and UNDP)

The World Bank Climate Resilient Road Project In conjunctions with the Government of Timor Leste, and specifically the Ministry of Public Works, the project will deliver sustainable climate resilient road infrastructure throughout the Dili - Ainaro corridor. Proposed Total financing - Total $115million WB: $60 million RDTL: $55 million national budget

The project also includes feasibility studies for the upgrading of additional road segments linked to the Dili-Ainaro road.

However,… The Road’s Right of Way (RoW – the area in which the engineers work) extends only to 25m either side of the central line of the road Many of the causes and sources of road- impacting floods and landslides/slips begin outside of this 25m width.

therefore,… UNDP and WB, at the request of the Government of Timor Leste, and specifically the Ministry of Social Solidarity and its National Disaster Management Directorate have been designing a joint programme to address the challenges. The programme’s goals are: Improve Climate Resilience Demonstrate good practices Improve DRM at the community level Influence policy to mainstream DRM into the transport sector

TENTATIVE LEVEL AND SOURCE OF FUNDING ActivityFundingTiming Component 1 Risk Assessment – Climate/Disaster vulnerability Global Facility for Disaster Risk Reduction – ACP – EU (WB) Jan 2014 Enabling improved climate and disaster risk management Least Developed Countries Fund (UNDP) Mid 2014 Component 2 Capacity Building at National and District level for Mainstreaming Disaster Risk Management PHRD – JICA (WB) Strengthened climate and disaster risk planning, budgeting and delivery Least Developed Countries Fund (UNDP) Mid 2014 Component 3 Community Based DRM Projects around Dili-Ainaro Corridor and Linked roads PHRD –JICA (WB) Investments in climate resilient community based adaptation measures Least Developed Countries Fund (UNDP) Mid 2014 Total of tentative level of funding WB: 3.6 Million (GFDRR and PHRD) UNDP: 5.25 Million (LDCF)

One joint programme on supporting the government strengthening disaster/climate resilience along the Dili- Ainaro corridor in Timor Leste supported and implemented through two projects: UNDP project, LDCF funded – approx. $5.7M WORLD BANK project, GFDRR ACP-EU (approx. US$0.9M) and PHRD funds (approx. US$2.7M)

The joint programme supported by UNDP and the WB aims at: Reducing climate change and natural disaster associated risks, and Minimizing losses to physical infrastructure arising from natural disasters and climate change

To do this the programme aims at: a.Performing a RISK ASSESSMENT - Understand better the natural disaster risks and where they occur and communicate this to decision makers to influence future planning and budgeting b.Developing capacity to manage disaster risks - influence sub-national and sectoral strategies c.Strengthening climate and disaster risk planning, budgeting and delivery d.Investing in climate resilient community based adaptation measures and implementing risk management activities to protect assets and livelihoods from disaster & climate risks.

In this way, the joint programme will secure the critical economic infrastructure in the Dili to Ainaro corridor which is increasingly at risk from climate change and disaster related impacts, including localised flooding, landslides and strong winds.

The joint programme is implemented through two projects with considerable cross over, both spatially and thematically. This dictates that considerable coordination and synchronization needs to be built into the UNDP and WB supported projects from the design phase through to implementation of activities.

In order to ensure the two projects coordinate adequately under the umbrella of a joint programme, a joint steering committee has been proposed. The Ministry of Social Solidarity would be the main ministerial focal point, and would likely appoint the NDMD as the primary National Directorate responsible for chairing the Steering Committee and implementing the Components of the Projects that will be Nationally/Recipient Executed.

Project management units It is likely that two separate project management units will need to be established Location ToRs Integrated Assessment Frameworks

As well as MSS, line-ministries will be closely involved in all Components Close coordination between MSS and line- ministries will also be required Inter-ministerial coordination will be an integral part of the success of the project as many of the activities will require other Ministries such as MPW, MSA, MCIE and MAF Where possible, Suco development planning process will be utilized

Timing January 2014 is likely to be the earliest that Component 1 of the WB’s DRM project will be operational UNDP’s project would likely come into operation in mid 2014.