THE SUMMER OF CHANGE 2013. Things are happening ….. WEEK ONE.

Slides:



Advertisements
Similar presentations
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Advertisements

SECTOR 8D Study of Booths in sector 8D market We took 1 strip of the market place and studied its booths. More emphasis was given on how the spaces inside.
NGfL CYMRU GCaD FLOOR COVERINGS.
Strawberry Point School Modernization Summer 2012.
Architecture CAD living sleeping service SPACE PLANNING
ASBESTOS AWARENESS Introduction - ASBESTOS WHAT IS IT? ASBESTOS IS A FIBROUS MATERIAL IT OCCURS NATURALLY IN MANY PARTS OF THE WORLD. 3 MAIN TYPES CHRYSOTILE.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
For the first 5 minutes of class, complete your learning center drawings. When finished, put your name on the back and turn in to the bucket. We will then.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
St. Joseph’s Building Project. Introduction This power point will let you know what is happening with the building project. It goes from the beginning.
EE Volunteering NS&C Network Delivery & Support 18 th & 19 th February 2014.
Buckman Heights Elementary School Fire Report Presented by: Mr. Donald Mellema Facilities Manager Greece Central School District.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
Aum Sri Sai Ram Current status of construction of plant houses in Odisha.
Grimsby Secondary School
Story of a Cellar Conversion Click to start Slideshow.
RENOVATION & RESTORATION. New 3 rd Floor Prosecutors Office Existing Attic Space.
Fund-raising at Central Methodist Nursery School Progress over the last 15 years!
GMP and HACCP in school restaurants Comenius School Development Project 2006/07 Srednja šola Zagorje.
Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River. Project lot area composed of 14,000 square.
Max And Hieu’s House Design. Entry Hallway= 12mx1.25mx2.5m extra 60cmcm in width on right while passing coat hangers and shoe racks on first right which.
Computing Laboratory Building & Facilities Overview Role of Building & Facilities Manager Helping you Cleaning Reporting problems Interface with the Estates.
Identifying Information: Common Areas - 1 none LEVEL 2.
Renovation 2014 Preserving the Past | Preparing for the Future The renovation we are planning seeks to preserve the past by maintaining the character and.
How to build a two storey house
Construction Carpenter Vocabulary Created by The University of North Texas in partnership with the Texas Education Agency.
A sad but true story of Dosti Flamingos. Very beautiful from the outside…
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Finishing the Building
Building for Learning Project Photo Progress Report Month of May 2010 Project commencement 21 st September 2009.
Value of a Well Planned Space. Goals of a well planned space 1.Provides a physically safe environment for children 2.Provides children with areas that.
HOME MODEL. P e r s p e c t i v e HOME MODEL 4.00m X 5.50m Floor Area = 22 sqm. Turn-over unit 4.00m 5.50m 1.4m 4.00m.
Case Study: The Chapman Graduate School of Business Nicole Figueroa/ Kamilah Bermudez/Elizabeth Berryman Acoustics Assignment #5.
Khulanathi “grow with us” Children’s home Khulanathi “ Grow with us”
Building for Learning Project Photo Progress Report Month of May 2010 Project commencement 21 st September 2009.
INTERIOR PAINT & DRYWALL REPAIR Identify the tools needed to paint interior ceilings & walls Learn to repair damaged drywall Learn how to prepare rooms.
46 West Trace Creek The Woodlands, Texas. Front view of home.
CHELSEA LINKS 22 LAWSON STREET NELSON BAY NEW TOWNHOUSES DUE FOR EARLY 2016 Architecturally designed townhouses are now being offered for sale! 5 x 3 Bedroom.
Work Progress Photos From 1 ST To 15 TH NOV 2015.
The exterior rebuild is nearly complete. We are about finished with the first fix in the classrooms and toilets. All the flooring, fixtures and fittings.
The view of the new school from the Spinney. This area will be the infant playground.
Work Progress Photos From 15 TH To 30 TH NOV 2015.
Facilities for a Quality Child Development Program Child Services II.
New Store – Enter Store Name & Number PROJECT PHOTOS 1.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
DREAMZ SUPRICHITH Location:HEBBAL Dreamz Infra India Ltd.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 23 PowerPoint presentation Preparation techniques.
This is the main entrance to our school Members of our School 230 pupils 1 Head 1 Deputy Head 8 Teachers 8 Teaching Assistants 2 secretaries 5 Lunch.
Bethany Room Pre-K Sunday School and general storage. Room is very long and has access from each end and from parlor. No closets. INVENTORY – CURRENT USEIMMEDIATE.
Dream Flower Akademia – Flats in Cochin. Floor Plans.
The University of Sheffield - School of Architecture Classroom 3 Photos Drawings Existing classroom The classroom I Wish.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Assembly And Installation Of Ikea Kitchen Cabinets
VILLA DEL MAJUELE.
Chalk Board Paint Reviews
Project 105 Report to Congregation
CSUEB Facilities Department Custodial Cleaning Frequency Expectations
ISA Prime Developments
RISER PROJECT L, m, l/m kitchen.
ISG CONSTRUCTION WELCOME HUNSLET MOOR PRIMARY SCHOOL
G kitchen What makes you special!
The following slides show just how this transformation took place.
KOMPLEX Investors Report – Q
Breakfast bar – curved base units
n/o back to back kitchens
Apartment 5 £320, – Ver A.
Apartment 4 £325, – Ver A.
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Presentation transcript:

THE SUMMER OF CHANGE 2013

Things are happening ….. WEEK ONE

Language Unit - The way it was….. Unisex toilets Meeting Room & Therapy Room Inner corridor and entrance corridor Entrance doors and corridor kitchenette

Unisex Toilet Area Unisex Toilet Area Old PTA Cupboard now knocked through into old toilet area – to be made into meeting room Old PTA Cupboard now knocked through into old toilet area – to be made into meeting room After one week………

Window knocked through from old PTA cupboard into corridor next to old therapy rooms Window knocked through from old PTA cupboard into corridor next to old therapy rooms Old meeting room, now to be turned into Inclusion Office Old meeting room, now to be turned into Inclusion Office

Meeting room and new corridor being constructed in old KS2 classroom area Meeting room and new corridor being constructed in old KS2 classroom area

KS1 Classroom – now has windows into corridor KS1 Classroom – now has windows into corridor View into KS1 classroom from corridor View into KS1 classroom from corridor

OUTSIDE AREAS Enclosed outside area for Chickens New Sensory Garden / Quiet area

EYFS Inside Area Unisex toilets being taken out, to be refitted with new cubicles Nursery classroom with new opening into small learning room Inner corridor being opened up

WEEK TWO

KS2 classroom with new corridor and meeting room constructed. KS2 classroom with new corridor and meeting room constructed. Old PTA Cupboard now knocked through into old toilet area, partitioned off and made into meeting room. Old PTA Cupboard now knocked through into old toilet area, partitioned off and made into meeting room. Language Unit

New Inclusion Office area, with old kitchen, office and toilet stripped out. These to be made into small teaching room, meeting room and kitchenette New Inclusion Office area, with old kitchen, office and toilet stripped out. These to be made into small teaching room, meeting room and kitchenette All other areas of the Language Unit refurbishment are progressing well. However, it was not possible to take photos this week as we did not want to disturb the workmen in these rooms. All other areas of the Language Unit refurbishment are progressing well. However, it was not possible to take photos this week as we did not want to disturb the workmen in these rooms.

EYFS Inside Area Looking from Nursery towards the Office, and visa versa Looking from Nursery towards the Office, and visa versa Inner corridor being opened up Inner corridor being opened up

Reception 1 classroom being re-decorated. Old carpet and parquet flooring has been removed. Reception 1 classroom being re-decorated. Old carpet and parquet flooring has been removed. Old Reception 1 classroom being restructured back to its original form to match current Reception 1 and 2. This room will become the new D&T room Old Reception 1 classroom being restructured back to its original form to match current Reception 1 and 2. This room will become the new D&T room

Nursery area, with opening from small learning room into main class; new radiators in whole area and kitchen stripped out. Nursery area, with opening from small learning room into main class; new radiators in whole area and kitchen stripped out.

EYFS Outside Area New guttering, fascias and soffits being installed. New guttering, fascias and soffits being installed. Old canopy has been removed, awaiting installation of new one. Old canopy has been removed, awaiting installation of new one.

ALLOTMENT AREA

SENSORY GARDEN / QUIET AREA Trellis, raised plant beds and entry bridges installed. Trellis, raised plant beds and entry bridges installed. Hole dug in preparation for water feature Hole dug in preparation for water feature

WEEK THREE

Language Unit Unisex toilet area. Walls being covered with hygienic cladding. Sink being installed in KS1 classroom. Walls have first coat of paint.

Work being carried out in KS2 classroom Old office area being plaster boarded.

Old adult toilet area being refurbished into kitchenette. Outside are of old PTA cupboard. Now to have window installed into new meeting room.

EYFS Area Practical Room with sinks installed and walls painted. New units being fitted into kitchen area.

Old Reception 2 classroom, now with newly painted white walls and ceiling, with two walls being depicted in blue.

Outside Areas EYFS playground with rubber surface removed. Holes being dug for canopy structure.

Sensory Garden / Quiet Area Water feature, pergolas and blackboards now installed.

WEEK FOUR

Language Unit Adult toilet and Unisex toilets with utilities being installed.

KS1 classroom. Decorated, sink installed and vinyl flooring laid. Inclusion Room. Decorated and IT data being installed.

Entrance Lobby. Plastered awaiting decoration. Inner Corridor being decorated.

EYFS Area Nursery Classroom. Entrance to small learning room plastered. Remainder of room decorated.

Nursery Entrance Lobby and inner corridor being decorated.

Practical Room. Windows between room and corridor installed. Rec 1 Classroom. Flooring being laid, prior to screeding.

EYFS Playground Area Canopy structure posts being installed.

Sensory Garden / Quiet Area Almost complete. Water feature, bridges, pergolas, planting and pathway all finished. Plaque still to be done. Seating to be installed during October half term.

WEEK FIVE

Language Unit Old Therapy room being decorated New classroom doors being fitted Unisex toilets being installed

Kitchenette area being decorated and electrics installed Office Area with IT, electrics and phone cables being installed. KS2 classroom flooring being laid

EYFS Area Above: New kitchen being installed Below: Store room being decorated Above: Learning room being decorated Below: Unisex toilets being installed.

EYFS Playground New Canopy installed full length of EYFS Area New soft play area being marked out. New sand and water play area being constructed