Attachment 10 – Illustrated report on the threat to conservation areas and townscape of Catherine Hill Bay ‘Middle Camp’ area Old mine railway bridge,

Slides:



Advertisements
Similar presentations
Landscape Level Conservation Planning for prioritizing conservation action in Mozambique Bruno Nhancale, PhD Conservation Science workshop, 21 st April.
Advertisements

Harold Park Tram Sheds Development
CATHERINE HILL BAY. A special place in NSW CATHERINE HILL BAY A unique history, bio-diversity, sustainability and community.
 Symbolism › Cartoonists use simple objects, or symbols, to stand for larger concepts or ideas  Exaggeration › Sometimes cartoonists overdo, or exaggerate,
Green Mountains to Adirondacks Habitat linkage (Wide- Ranging Mammals) Paul Marangelo The Nature Conservancy – VT Chapter Dr. Robert Long Western Transportation.
Somerford Keynes Parish Council Neighbourhood Development Plan PARISH PRESENTATION 19 th JANUARY 2015.
Residents’ Meeting Thursday 9 th August 7.30pm 0.
Envionmental Corridors and their Importance to the Florida Ecosystem. Alexander Smith.
1.THE IMPORTANCE OF CATHERINE HILL BAY - HISTORY Brief historical development Catherine Hill Bay wreck 21 June Mine operations commence.
SUBMISSION TO RESIDENTIAL ZONES ADVISORY COMMITTEE SEPTEMBER 17, 2014 RESIDENTS ABOUT INTEGRATED SUBMISSION TO PLANNING PANELS.
OSG Analysis on the Gloucester County Rail Line Study State Planning Commission December 3, 2008.
World Forests Forests cover 30% of the world’s land surface.
Black Gum Swamp & Clyde River Wetlands
Protected Areas. National Parks Provincial Parks Nature Conservancy Not counted: Game Sanctuaries Biosphere Reserves.
A Legal Perspective on the Assessment of Cumulative Environmental Impacts Adam Beeson.
Wetlands Mitigation Policy Sudbury Wetlands Administration Bylaw April 27, 2015.
Environment and Conservation Values of Crown lands Cerin Loane, Policy and Research Coordinator, Nature Conservation Council of NSW.
Greenbelt Land Trust Preserve and protect in perpetuity native habitats, working lands, and lands of natural beauty, which provide a connection to the.
Introduction Land managers and researchers are using ‘connectivity conservation’ to help birds, insects and maybe even larger mammals migrate through environments.
National Planning Policy Framework. 2 Planning reform: main aims Put power in the hands of communities - with policy that is radically streamlined and.
1 Residents User Group (RUG) report Frenchay Preservation Society 20 th June 2013.
Wyong Local Environmental Plan (LEP) 2013 Kathryn Heintz Senior Strategic Planner, Strategic Development.
Resources and Energy Section 4 Section 4: Resources and Conservation Preview Key Ideas Resources and Conservation Environmental Impacts of Mining Fossil.
საქართველოს მწვანეთა მოძრაობა / დედამიწის მეგობრები Greens Movement of Georgia / Friends of the Earth Implementation of Aarhus Convention in Georgia during.
Strategic Planning & the Duty to Co-operate Andrew Pritchard Director of Policy & Infrastructure.
TOWN OF CALEDON Identifying Strategic Employment Lands along the GTA West Corridor – an OPPORTUNITY Open House Presentation June 29, 2015.
11-4 How Should We Protect and Sustain Wetlands?
Guidance for AONB Partnership Members Welsh Member Training January 26/
Atlin/Taku Land Use Planning Forestry Chapter Presentation to Multiparty Workshop #4 June 19, 2009.
An Update 1 August 4,  The proposed hydro generating station at Bala Falls remains front and centre as an issue of concern to residents and cottagers.
© Bishop’s Stortford Town Council Bishop’s Stortford Neighbourhood Plan Silver Leys and Meads Wards Draft Transport Stage One 5 February 2013.
Arctic Mining Northwest Alaska Northwest Arctic Borough.
The concept of human dimensions The name of this course is “Human Dimensions of Natural Resources”. What does it mean? What exactly are the human dimensions?
Conservation in Human Modified Landscapes- CH and ●Ecological changes are negative, anthropogenic, large, and accelerating (feedback.
The impact of traffic on the Catherine Hill Bay area.
Hebden Bridge Civic Trust 3rd March 2009 Conservation Areas, Appraisals & the Historic Environment Chris Edwards & Kate Peach Conservation Section Calderdale.
INTERNATIONAL UNION FOR CONSERVATION OF NATURE World Heritage renomination Presentation to the first leadership committee of the Ha Long Bay-Cat Ba Alliance.
Paving Over Paradise.  Fragmentation of Conservation Landscape  Degradation of Conservation Potential of lands  Barrier to Wildlife Movement  Sink.
Planning the Future to enhance and sustain our town PETERSFIELD TOWN DESIGN STATEMENT.
The Role of Government Part 4-Lesson 1. Introduction In Australia there are three levels of Government: Federal State Local It’s only been about 30 years.
OES  The Flora and Fauna Guarantee Act of 1988 is a Victorian Government act administered by the Department of Sustainability and Environment.
February The threat to Middle Camp area of Catherine Hill Bay; conservation areas and townscape CHBPA Feb 2008 [Old mine railway bridge, between.
Shenstone Neighbourhood Plan Working Groups launch event 18 th June 2013.
Iron Ore Holdings Ltd Buckland Project & Northern Quoll: adaptive mine design and management 30 July
Special Interest Tourism Nicos Rodosthenous PhD 05/11/ /11/20131Dr Nicos Rodosthenous.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
Community Action Program Proposal Ian Dossett 4/2/14.
This was developed as part of the Scottish Government’s Better Community Engagement Programme.
14 OCTOBER 2005 POLYTECHNIC OF NAMIBIA GIS CONFERENCE CHEETAH CONSERVATION FUND GEOGRAPHIC INFORMATION SYSTEMS (GIS) USAGE Matti T. Nghikembua
West Belconnen Bush on the Boundary Reference Group 4 November 2015.
STREET CAPACITY??? Congestion and traffic problems highlighted by Holford in 1950! Some improvements, but the problems keep growing More growth = more.
Designing Protected Areas
Appearance: Numbats were critically endangered a few years ago, but populations have now increased. They have a look that makes them a very popular animal.
Environmental. “It is the position of the Department of the Environment and Conservation NSW that the South Wallarah Study Area is of extremely high conservation.
PART OF THE PRESENTATION OF THE CATHERINE HILL BAY PROGRESS ASSOCIATION PUBLIC ACCESS.
Conserving Significance Introduction to the process of Identifying Values and Assessing Significance Historic Landscape Project.
Types of Management Agreements between Parks and Indigenous People, NSW Ideas for Application to Yorta Yorta Context
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
RESOURCE POTENTIAL AND CONSERVATION VALUES. Traditional Land Use and Occupancy Archeology, Rare Features, Historic Sites Wildlife Habitat Value 2/15.
National Road Safety Strategy Update Joe Motha General Manager Safety Research and Education Australian Transport Safety Bureau.
Ayers/Saint/Gross Architects and Planners DAVIDSON CONCORD FRAMEWORK PLAN CONCEPTS.
Section 4: Resources and Conservation
Black Adder disrupters
The Flora and Fauna Guarantee Act of 1988 (Vic)
Shaping the future of Laverstock and Ford Parish
Researching Historic Designed Parks and Gardens for Local Listing
Planning and Design Opportunities in 2019
Northern Quoll, Dasyurus hallucatus
Mordialloc Bypass Project
Presentation transcript:

Attachment 10 – Illustrated report on the threat to conservation areas and townscape of Catherine Hill Bay ‘Middle Camp’ area Old mine railway bridge, between the development areas by Barry Laing for CHBPA February 2008

The reality of C&A’s Plan “The company is pleased to be able to contribute to the establishment and realisation of the long sought after conservation corridor...the Wallarah Peninsula.” (Concept Plan 1.2 Project Objectives, p.8) IN FACT, the company intends to use Part 3A to take its land which is mostly already zoned for conservation and is part of a national park, and cut it north-south and east- west with new housing; six times the number of houses that are in the adjacent heritage mining village.

Where this will happen Tall regrowth on land of the old E-pit area: C&A’s Area B

C&A’s Area C behind the village: the first bush to go under housing

C&A’s Area C: the first to go

...and at night? The plan omits the ecological and visual impacts of the new housing’s night lights

C&A’s Area C: where backdrop to the popular heritage festival would change

Ecological assessment (EA) The EA repeats many times that the offsets are more than ‘ traditional’ offsets, and that they preserve the Wallarah Peninsula conservation areas. However it never values the offsets, nor considers the change in shape of the national park as a threat. The Area B development will change the shape of the park and cut the corridor by more than half, from about 900m wide to under 300m wide and maybe less.

The language of the EA distracts from the real story The EA has repeated key phrases as if they were established fact, when they are mere assertions; eg in pages 5-104, more than 50 times the phrase “[existing flora/fauna] will be retained/conserved /protected/ reserved/ secured in the conservation lands” is used, as if that protection is a given, which ignores issues that mean protection cannot be guaranteed.

Contiguity of Wallarah National Park and Munmorah SRA as it is now Pacific Highway Park Flowers Dve Pacific Highway Flowers Dve Park Coastline

Contiguity of Wallarah NP and Munmorah SRA as it is now: roads and corridor Pacific Highway Park Flowers Dve About 900m

Reduction in contiguity of Wallarah National Park by this development Pacific Highway Park Flowers Dve Park [Nords Wharf Plan]

Roads also impact on contiguity of Wallarah NP and Munmorah SRA Pacific Highway Park Flowers Dve

The road effects on the remaining corridor are not quantified in the EA “It is important to consider the contribution of roads to the increasing fragmentation of habitats, particularly for species that may react negatively to roads as physical, behavioural or sociological barriers. The associated possibility of genetic isolation of animal populations is also important.” (Ecological Effects of Roads, Parks Victoria 2004, p 25) “The road effect zone is defined by the distance to which each different ecological road impact extends outward (Forman 1999). These distances differ for each impact, ranging from a few metres to over a kilometre... the road” The road effects zone averages 600 m in width (Ecological Effects of Roads, Parks Victoria 2004, p 47.

Other impact zones Additional to the road effect is the impact of humans, weeds and pets on the corridor (see below) C&As concept plan does not address this possible complete closing-off of the Wallarah NP corridor by its development. Repeated assertion: eg EA Part page 88 “As the majority of the habitat will be conserved it is considered unlikely that any impact will be significant.” which completely obscures the issue of the geometric shape of the habitats, and the road and development impact haloes.

Impact of pets and feral animals is not addressed in EA Pets are recognised as a serious problem in parks, eg NPWS Press release, 19/7/05: “The NPWS has invested considerable effort over the years into raising the conservation message regarding the inappropriateness of having dogs in national parks, however it is likely that some neighbours are unaware that their pets are roaming [into Ku-ring-gai Chase NP] at night.” Dogs and cats pose a threat to the conservation areas which is not addressed in the EA even though feral cats are a Key Threatening Process and the number of pets from 300 dwellings will be considerable. (Laing, 2007, Submission against MP ). The OFFSET VALUE ascribed in the Plan to the conservation areas may be significantly destroyed within a few years.

EA omits impacts of Roads, residents, pets, weeds on shape and contiguity of conservation areas Pacific Highway Park Flowers Dve Park About 200 m left

So what about the offset values?? Concept plan does not value the conservation lands as they are now, nor does it give estimates of the reduction in value due to the impact of its development. This leaves the panel and minister in the dark about whether the offset lands will actually be of benefit to the state. The proposal is seriously deficient in this fundamental issue and should be rejected. The area’s current conservation zonings guarantee benefit to the state and should be maintained.

The unique Heritage village, its setting and community are acknowledged in the concept plan. It is already protected by LMCC controls

The unique Heritage village, its setting and community are acknowledged in the concept plan. It is already protected by LMCC heritage controls. Historically significant ribbon development

Heritage – a unique whole community, swamped by new housing under this plan Heritage ribbon village squashed by overdevelopment

Heritage Impact Assessment (HIA) Lake Macquarie LEP, Hunter REP and National Trust heritage listing for village and specifics, but blandly dismissed in the HIA with “heritage values will be respected and conserved” National Trust is quoted: “A company town...valuable as...strong townscape character... should respect this and historic evidence it presents...” (p53, Heritage IA) The HIA simply says the view catchment of the Conservation Area needs to be carefully considered, while it finds no issue in the completely overpowering development inconsistent with the company town ribbon layout so valuable as our heritage.

HIA makes bald assertions HIA cumulative impacts statement (p108) acknowledges this development (and the Rose one to the south) will result in a change to the local area through an increase in the built areas. Then it restricts itself to mainly considering the view impact, neglecting the complete transformation of a company town to a conglomeration of large blobs of new houses surrounding the original ribbon of miners’ houses and heritage items noted in the report, particularly the E pit area. Baldly asserts with no reference to evidence that this will be largely offset by the (unspecified) positive heritage outcomes.

In the EA significant issues of impact on adjacent parks and of the true offset values have not been addressedIn the EA significant issues of impact on adjacent parks and of the true offset values have not been addressed In the HIA significant aspects of overall impact on the village have not been addressedIn the HIA significant aspects of overall impact on the village have not been addressed These are sufficient to reject this plan.These are sufficient to reject this plan. [Wetlands below the development]

The DG’s requirements have not been met. Reject the plan! [Wetlands below the development]