The I-25 Corridor: 120 th Ave to the Wyoming Boarder Emily Thomas Emily Thomas Department of Geography - University of Northern Colorado.

Slides:



Advertisements
Similar presentations
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Advertisements

MANAGING TECHNIQUES, MATERIALS, AND FUNDING TO PROVIDE EFFICEIENT SURFACE TRANSPORTATION PRESERVING THE NATIONS ROADWAYS Kate Gasparro Clemson University.
I-10 Advanced Traveler Information System Intelligent Transportation Society of New Mexico November 4, 2011.
ROAD TRAFFIC ACCIDENTS & SAFETY DR.WAQAR ALI 1. FACTS 2.
May 15, 2013 Economic & Market Research / Land & Development Planning Landscape Architecture / Community Planning & Design Golf Feasibility Analysis Colorado.
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
Complete & Connected: Tools for Planning a Balanced Transportation System Technical Workshop.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Meade County Experience with Alternatives to Paving Ken McGirr Meade County Highway Supt Sturgis, SD.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
Corridor #5 Update United States Senate Briefing September 26, 2007.
Environmental Assessment Public Meeting
Traffic & Congestion In Connecticut State of Connecticut Department of Transportation April 2010.
1 Evaluation of Ports of Entry (POE) for the International Border in the El Paso MPO Study Area.
Office of Highway Safety Highway Factors David Rayburn.
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
Analysis of Alternatives for Accommodating Trucks on Urban Freeways in Southern Nevada Alexander Paz, Naveen Veeramisti, Pankaj Maheswari Transportation.
1 Lei Xu Term Project Presentation – CVEN 689 – Spring 2005 CVEN 689 – SPRING 2005 LEI XU May 2th, 2005 hide A GIS-BASED STUDY OF HOW THE HOT LANE IMPLEMENTATION.
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
Optimal Highway Durability in Cold Regions Jia Yan Washington State University 18 June 2015.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Kasi Ross’ Colorado Report Kasi Ross’ Colorado Report Highways Capital Cities Parks History.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Charlie Zelle, Commissioner Minnesota Department of Transportation February 18, 2014.
Core Concepts Part 1: Tools of Geography
Walden Consumer Square 1740 Walden Ave Cheektowaga, NY East Submarket By:five student team.
Colorado Department of Transportation – AASHTO SCOH Meeting– October 17,
I-680 Value Pricing: A “Smart Carpool “ Lane Demonstration Project June 2004.
Congressional District Projects New CD-7 North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor.
Chapter 1 Section 1 What Will Texas Be Like When You Are 20? Copy the notes in red into your composition book.
Landform Regions in North America Ms. Drifmeyer Human Geography.
A Road Pricing Feasibility Screening Tool May 19, 2015 Thomas Adler, RSG Nikhil Sikka, RSG Vince Bernardin, RSG Sarah Sun, FHWA.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Map: St. Louis to Ft. Leonard Wood
Major Transportation Corridor Studies Using an EMME/2 Travel Demand Forecasting Model: The Trans-Lake Washington Study Carlos Espindola, Youssef Dehghani.
Part 2 Processes and approaches associated with the FHWA method 1 1 HPMS Vehicle Summary Data.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
Oregon’s Work Zone Traffic Analysis Program FHWA Work Zone Rule Virtual Workshop November 6, 2008 Irene Toews, P.E. Oregon Department of Transportation.
HSM: Another Tool for Safety Management in Wyoming 1 Excellence in Transportation.
Colorado Katy Brooks Mrs. Williams February 1, 2008.
Road work season begins Projects kick off in local counties May 19, 2012 By Jason Raiche - staff writer Daily
The Main Street Bike Lane Project LADOT Bike Program.
Central Corridor LRT Review of Washington and Northern Alignments Jan Lysen and John Siqveland December 10, 2009 Image: MPR News Q.
Interstate 2.0: a 21 st -Century Network Financed by All- Electronic Tolling by Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation.
FixNorthI25.com The Fix North I-25 Business Alliance.
Colorado Front Range Trail Corridor Plan Colorado Front Range Trail Corridor Plan.
Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce.
Minnesota’s Urban Partnership Agreement UPA Timeline The UPA agreement with the US DOT requires that the project be operational by September 30, 2009,
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
HPMS Traffic Data Review Highway Information Seminar Oct , 2012 Patrick Zhang, P.E Office of Highway Information Policy, FHWA 1.
Geography Skills Daily Skills Practice.
Metro Highway Program Presentation to CMAA Abdollah Ansari
1 National Governors Association Roundtable Presentation April 2, 2001 Dr. Christine Johnson Director, ITS Joint Program Office Program Manager, FHWA Operations.
Driver Education Introduction to driving in New Jersey Notes and Study Guide.
STAFF’S FINDINGS OF INCONSISTENCY Section 30233(a) Wetland Fill Staff’s basis for denial centers on the determination if the project meets the incidental.
2040 Regional Transportation Plan (RTP) Financial Plan Planning Council 2040 RTP June 4, 2015.
Visit Our Website at: Click to edit Master title style.
Pioneer Road Relocation and Reconstruction Project
I-77 High-Occupancy Toll Lanes
FUSING LONG AND SHORT DISTANCE TRAVEL IN THE COLORADO STATEWIDE MODEL
CR184 (Quintette Road) Bridge #480045
Emily Guenther Zach Olson Laura Scott Cameron Wein
Geography of U.S. Pg. 3.
Objectives: Identify the major landform regions, climate types and lakes and rivers of the United States and Canada Create physical and political reference.
A Road Map: Wyoming.
Rivers and Mountains of North America.
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

The I-25 Corridor: 120 th Ave to the Wyoming Boarder Emily Thomas Emily Thomas Department of Geography - University of Northern Colorado

Facts about I-25 Las Cruces, New Mexico to Buffalo, Wyoming is the span of this Interstate highway Las Cruces, New Mexico to Buffalo, Wyoming is the span of this Interstate highway It is 1059 miles long It is 1059 miles long In Colorado it spans the North and South Front range which equals miles in length In Colorado it spans the North and South Front range which equals miles in length

Average Annual Daily Traffic in ,200 on 120th Avenue 62,200 on 120th Avenue 51,600 exit 235 highway 52 Dacono 51,600 exit 235 highway 52 Dacono 44,400 exit 240 highway 119 Longmont 44,400 exit 240 highway 119 Longmont 44,200 exit ,200 exit ,600 US 34, Loveland 38,600 US 34, Loveland 32,000 Harmony Road, Fort Collins 32,000 Harmony Road, Fort Collins 18,400 exit 14 18,400 exit 14 13,100 exit 1/Wellington 13,100 exit 1/Wellington 12,800 at Wyoming border 12,800 at Wyoming border

Accidents In 1992 in 14 miles stretch there was 88 accidents, In 1996 it increased to 183 In 1992 in 14 miles stretch there was 88 accidents, In 1996 it increased to 183 Highway 52 and 119 Highway 52 and 119 “Planners expect the count of motorist between Loveland and Denver to increase to 600,000 by 2020.” “Planners expect the count of motorist between Loveland and Denver to increase to 600,000 by 2020.”

What’s being done to fix the Northern Part of I-25? NOTHING

That’s not all true- Northern Colorado Transportation Alternatives Feasibility Study Northern Colorado Transportation Alternatives Feasibility Study-Rail-Bus -HOV Lanes -More Lanes But Nothing has been agreed upon! But Nothing has been agreed upon! I-25 Corridor Study Final Report

Likely areas that will be improved in the next 10 years: Exit 232, Erie Exit 232, Erie Exit 257, US 34 Loveland Exit 257, US 34 Loveland Exit 262, Windsor Exit 262, Windsor Exit 269, Fort Collins Exit 269, Fort Collins

Project Completed in the late 1990’s Project Completed in the late 1990’s Exit 268,Fort Collins Exit 268,Fort Collins Exit 240,119 Longmont Exit 240,119 Longmont Exit 235,52 Dacono Exit 235,52 Dacono

Anchorage, AK Which State was the Winner of the 2002 FHWA for excellent in Highway Design?

Questions? I-25 Windsor