Sequence of QC steps for main bus bar splices Control of cables and stabiliser prior to connection by ICIT team Temperature control during soldering, visual.

Slides:



Advertisements
Similar presentations
Surface Finish An engineering component may be cast, forged, drawn, welded or stamped, etc. All the surfaces may not have functional requirements and need.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Machine Tools And Devices For Special Technologies Electrochemical machining Slovak University of Technology Faculty of Material Science and Technology.
Connector Installation Guide For Compression and Mechanical Connectors
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Chapter -9 WEB STIFFENERS.
Connection of flange plate with web
Tension Members Last Time
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Chapter 10 Web splice.
New HV test specification for the LHC N. Catalan for the EI section.
Quality control of LHC electrical interconnections to be produced during the 2009 shutdown Since the functional properties of the LHC electrical interconnections.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Status of SMACC-QA 1.Recently resolved issues 2.Update from QC teams 3.Statistics S56 and S67 4.Auditors findings 5.4th Splice Review – 22/24 July Ranko.
13.4. GENERAL DESIGN CONSIDERATIONS: PRESSURE VESSELS
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
University of Palestine
Radiography Testing 1 Radiography Testing (RT), or industrial radiography is a nondestructive testing (NDT) method of inspecting materials for hidden flaws.
LHC Splice Review, C. Scheuerlein, Local quality control of LHC electrical interconnections during the 2012 shutdown.
Brookhaven Science Associates Accelerator Safety Workshop Lessons Learned at C-AD Accelerators E. Lessard August 7-9, 2007.
Poisson’s Ratio For a slender bar subjected to axial loading:
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
A. Verweij, TE-MPE. 3 Feb 2009, LHC Performance Workshop – Chamonix 2009 Arjan Verweij TE-MPE - joint stability - what was wrong with the ‘old’ bus-bar.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
LHC Risk Review 5-7 March 2009 Magnet Situation, including Spares (M.Modena)
1 Quality control of the LHC main interconnection splices before and after consolidation C. Scheuerlein and S. Heck 2 nd LHC splice review,
The HCAL barrel absorber structure
LHC Magnets/Splices Consolidation (20 minutes) Francesco Bertinelli 7 June, slides  Status of LHC: electrical connections  Description of shunt.
Displacement and Motion Measurement
UNIT III Bulk Deformation Process. Bulk Deformation Processes Characterized by significant deformations and massive shape changes "Bulk" refers to workparts.
Preliminary tests of resistive materials for ProtoDUNE CPAs. 1.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
ContentPages 1.The Objectives of this Project 2 2.The Objectives of this Meeting 3 3.The Different Ideas Explained( 4-10) a)Diffraction 4-5 b)Resistance.
Digital Image Processing Lecture 16: Segmentation: Detection of Discontinuities May 2, 2005 Prof. Charlene Tsai.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
ABTEF Meeting, V. Namora Quality Assurance in the Superconducting Magnets and Circuits Consolidation (SMACC) project.
Protection of 600 A bus bars, follow up W. Venturini Delsolaro and A. Verweij MPP meeting, 17/10/2006.
Cooling of GEM detector CFD _GEM 2012/03/06 E. Da RivaCFD _GEM1.
P. P. Granieri 1,2, M. Breschi 3, M. Casali 3, L. Bottura 1 1 CERN, Geneva, CH 2 EPFL-LPAP, Swiss Federal Institute of Technology, Lausanne, CH 3 University.
A. Perin, TE/CRG, DFBA LSC Page 2 LHC Long Shutdown 1 Committee June 14 th, 2013 A. Perin (TE-CRG) On behalf of the DFBA splices consolidation.
MSC Technical Meeting 29 August 2013 Overheated QBBI.A21L6 F. Savary with contributions from N. Dalexandro, H. Prin, C. Scheuerlein, P. Voisin.
10-Jun-16S.Movchan Straw manufacturing and QC1 Straw manufacturing conditions and QC tape and straw parameters specification conditions of straw production.
LHC Risk Review Installation Progress Francesco Bertinelli – TE/MSC 5 March, 2009 (20 minutes) On behalf of - and with several contributions from – the.
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
Model magnet test results at FNAL
Electrical insulation of magnet circuits in sector 7-8
12 October 2009 RRB Plenary R.-D. Heuer
Splices in 13 kA circuits status of an ongoing work just started
Consequences of warming-up a sector above 80 K
11 T dipole coil features and dimensions
SMACC local splice quality control
Circuits description and requirements - Closed Session-
PLASTIC FORMING PROCRSSES
Personal Protective Equipment
Find the average value of the function {image} on the interval [1, 4].
WP3 Meeting – December the 10th 2015 H. Prin
Multi-Dimensional Transient Conduction
Shortening the long RQF/RQD busbar segments in points 1 and 5
Presentation transcript:

Sequence of QC steps for main bus bar splices Control of cables and stabiliser prior to connection by ICIT team Temperature control during soldering, visual inspection of the finished splice by operators QC visual and geometric inspection according to IEG-C-BR-001 rev C QC US test In case of doubts (e.g. previous NCRs on cable or bus bar stabiliser)  Gamma ray Splice resistance measurement should be developed to become a standard QC tool C. Scheuerlein,

Example QC of QBBI.B25R3 Produced the Special U-piece (-1 mm length) used for M3-corridor. OK Visual and geometric inspection by QC team according to IEG-C-BR-001 rev C, the OK US-test 4 out of 4 US signals OK for all splices. Splice thickness OK. NCR was opened and gamma ray examination was requested for QBBI.B25R3-M3- cryoline, because room temperature splice resistance of 12.4 μΩ is higher than average values. C. Scheuerlein,

Resistance results QBBI.B25R3- M3-cryoline The higher resistance is at the lyra side of QBBI.B25R3-M3- cryoline (7.6  0.1 μΩ and 5.9  0.2 μΩ for lyra and connection side, respectively (distance between voltage taps=8.5 cm)). Resistance result is influenced by position of voltage taps (e.g  0.5 μΩ and 12.6  0.2 μΩ for measurements on top or on the side of splice, respectively (distance between voltage taps=17 cm)). C. Scheuerlein,

Photos QBBI.B25R3-M3-cryoline top viewbottom view side view QBBI.B25R3-M3-cryoline QBBI.B25R3-M3-cryoline-lyra-side (R= 7.6  0.1 μΩ) C. Scheuerlein,

Gamma rays QBBI.B25R3-M3 QBBI-B25R3-M3Cor-cC QBBI-B25R3-M3-Cor-connectionQBBI-B25R3-M3-Cor-lyra QBBI-B25R3-M3-QRL-connection QBBI-B25R3-M3QRL-lyra (7.6  0.1 μΩ) C. Scheuerlein,

US test result QBBI.B25R3-M3-cryoline For all splices tested so far during the 2009 shutdown we found 4 out of 4 good US signals. C. Scheuerlein,

Temperature cycle QBBI.B25R3-M3-cryoline C. Scheuerlein,

QQBI.29R3-M1-corridor NCR , splice resistance above average values. The cable and bus bar stabiliser of SSS 221 were damaged in SMA18. Visual and geometrical control result is acceptable. Because of the stabiliser deformation prior to soldering, a perfect splice could not be achieved. Therefore, we asked for resistance measurement and gamma ray images. Splice resistance is with 19.2 μΩ somewhat higher than average values. QQBI.29R3-M1-corridor C. Scheuerlein,

QQBI.29R3-M1 gamma ray images QQBI-29R3-M1-Cor-Co QQBI-29R3-M1-Cor-Ly QQBI-29R3-M1-QRL-CoQQBI-29R3-M1-QRL-Ly C. Scheuerlein,

NCRs for QBBI.A32R3 NCR for M3-cryoline gap with an approximate macroscopic transverse cross section of 20 mm 2. Splice resistance measured by TE-MPE team =10.7 μΩ, which is not significantly higher than average. NCR for M1-cryoline because of comparatively high splice resistance (20.3 μΩ). Resistance of M2-corridor=19.6 μΩ (always with a distance of 17 cm between voltage taps). C. Scheuerlein,

Photos QBBI.A32R3 Visual and geometric inspection by QC team according to IEG-C-BR-001 rev C.  M1 and M2 OK QBBI.A32R3_M1 QBBI.A32R3_M2 QBBI.A32R3_M1 C. Scheuerlein,

QBBI.A32R3 resistance results QBBI.A32R3-M1-cryoline –Total 19.7  0.3 μΩ (over 17 cm) –connection side-10.0  0.1 μΩ (8.5 cm) –lyra side-12.7  0.4 μΩ (8.5 cm) QBBI.A32R3-M2-cryoline –Total 21.3  0.1 μΩ (over 17 cm) –connection side-12.0  0.5 μΩ (8.5 cm) –lyra side-10.8  0.2 μΩ (8.5 cm) Influence of the voltage tap position on M1 and M2 splices (e.g. QBBI.A32R3-M2-corridor resistance =21.3  0.1 μΩ and 20.6  0.6 μΩ as measured with voltage taps at the side and on top of the splice, respectively). C. Scheuerlein,

Gamma rays QBBI.A32R3 QBBI-A32R3-M1QRL-cC 10.0  0.1 μΩ QBBI-A32R3-M1QRL-cL 12.7  0.4 μΩ QBBI-A32R3-M2QRL-cCQBBI-A32R3-M2QRL-cL

Splice resistance measurement as QC tool The room temperature splice resistance measurement is the only functional quality control that can be performed in-situ. Resistance measurements from TE-MPE team have demonstrated that comparative splice resistance values can be obtained. Visual inspection can only detect macroscopic gaps on the outside of the splice. Therefore, a comparative splice resistance measurement should be performed on all splices. A procedure should be defined so that we all measure in the same way. We need threshold values for acceptable and not acceptable resistance values for M1 and M3 splices, taking into account the limitations of the resistance measurement set-up (short distance between current source and voltage taps). C. Scheuerlein,

Example NCR concerning splice thickness NCR LHC-MSC-QBBI.A27R3-sur M1 coté corridor, coté gauche, epaisseur plus importante qu'habituellement de la connexion. A second cycle was performed without disconecting the splice. Thickness was reduced from 11.4 mm to 10.9 mm. Room temperature splice resistance 17.6 μΩ  average value. X-rays taken. NCR closed with warning. QBBI.A27R3-M1-corridor-lyra QBBI.A27R3-M1-corridor-connection X-ray images taken after 2 nd cycle QBBI.A27R3-M1-corridor-lyra C. Scheuerlein,

Quality control of line N and line M US welds Visual and geometrical inspection according to standard procedures IEG-C-US-001 RevC “Controle visuel des soudures US sur les bus bars auxiliaires des lignes M1 et M2” and IEG-C-US-002 “Controle visuel des soudures US de type N”. On-line analysis of production data (weld duration) by operators (not an acceptance criterion). Production data is saved on dfs. Photos of all US welds are saved on dfs. C. Scheuerlein,

Qualification of US welding and inductive soldering machines US4, US5 and US6 qualified for line N spool welds (round strand) with 0.80 mm compression (enfoncement). US1, US2, US3, US7 qualified for line M spool welds (rectangular strand) with 0.68 mm compression. BR2, BR3, BR5, BR7 qaulified for main bus bar soldering. Qualification results can be found under: \\cern.ch\dfs\Workspaces\s\Sector81Interconnect\Shutdo wn2009\Quality-Control\Electrical-Connections\Rc- results-tensile-tests C. Scheuerlein,